HomeMy WebLinkAboutWaterways draft minutes 4.9.2026On //2026, on a motion by committee member , seconded by committee member , the
Waterways & Shellfish Advisory Committee voted - to approve these minutes as written.
YARMOUTH WATERWAYS AND SHELLFISH ADVISORY COMMITTEE MEETING MINUTES
April 9, 2026
MEMBERS PRESENT: Julian Mallett (Chairman), Bob Churchill, Mike Dunbar,
Jack Moynihan, Ellie Lawrence
STAFF PRESENT: Dave Condon, Kathryn Brooks
OTHERS PRESENT: Mark Burgess, Kelly and Tom Houston, James Mahoney,
Brad Holmes, Scott Martin, Brian Wall
_______________________________________________________________________________
At 5:34 p.m. Dave Condon, Director of Natural Resources, read the open meeting law and explained the
meeting audio was going to be recorded.
Agenda
1. Public Comment
Kelly and Tom Houston voiced their displeasure with the boat slips at Grays Beach. They said they have
pictures of empty slips from the past few years and would like to propose a system like how the kayak
spots are claimed, to avoid empty slips. The Houston’s said they have been on the waitlist for 4 years.
They believe the current waitlist system pressures slip holders to keep their slips instead of giving them
up for fear they will never get off the waitlist if they go back on. They noted there is a kayak in one of
the slips as well.
2. Notice of Intent
a. Atlantic Coast Engineering LLC, 104-110 River Street, proposed fixed pier, gangway, and
float
The presenters for this project were James Mahoney with Atlantic Engineering, Brad Holmes the
environmental consultant, and Scott Martin the applicant.
Mr. Mahoney gave an overview of the project and Mr. Holmes explained he did the shellfish survey.
Very few shellfish were found in this area. Ms. Lawrence asked for clarification on whether the float was
secured by anchors instead of piles, and she also asked if they had done this in a tidal zone because the
dock will slide all over and is close to another dock. Ms. Lawrence also noted the dock stuck out far. The
answer was yes, it would be secured by anchors, though Mr. Mahoney did not know what type of
anchors would be used. The gangway would be secured to the dock.
Mr. Dunbar recused himself since he helped with the shellfish survey. Ms. Lawrence also noted the plan
does not show the approved pier that is not yet built. Chairman Mallett said this is an area of concern
for navigation and the channel would be restricted. Ms. Lawrences said this project would require many
variances and it would be very hard to use the area.
On //2026, on a motion by committee member , seconded by committee member , the
Waterways & Shellfish Advisory Committee voted - to approve these minutes as written.
Mr. Mahoney stated the 4 variances needed are: 75’ variance from other docks, 200’ from a beach, 100’
from the navigable channel, and lot line variances. Chairman Mallett and Mr. Moynihan both echo
concerns about the proximity of the proposed dock to the channel.
Ms. Lawrence motioned to not recommend this project due to navigational concerns and variances that
apply to this committee.
Mr. Burgess, of Shorefront Consulting, voiced his opinion on the project. He said the dock goes very far
out and impedes the use of an already approved dock. The float could be moved closer to land because
there is adequate water. The proposed dock is not in the center of the lot, there is no distance to the
channel, beach, and dock to the South marked on the plan.
Chairman Mallett asks if there should be a vote or if the project should be withdrawn and brought back
at a later date. Mr. Martin voiced his frustration and then asked why his dock is any different than the
dock to the north that was approved with the same variances he is asking for. Mr. Mallett again stated
his concern for the navigable channel and the proposed dock looks like it would be within the channel.
Mr. Holmes and Mr. Martin asked for feedback on changes such as if they could bring the dock back,
(closer to shore) and change from anchors to pilings. Ms. Lawrence said a helix anchor with a
rubberband would probably be the best option, but she is not here to design the plan. She also voiced
concerns about the flexibility of the ramp and if it became attached. She believes 3’ of water can be
attained closer to land and they should look at the contours of the channel.
Mr. Holmes recapped asking if the distance to the channel, south dock, and beach are all that is needed.
Ms. Lawrence said those would be good to look at, however, making those changes does not guarantee
approval from the committee. Ms. Brooks also suggested looking at the comments the Conservation
Administrator made on the initial plan that was submitted. It appeared to Ms. Brooks the information
added was a bare minimum and suggested adding more “meat” to the details for a stronger plan.
Mr. Martin said he does not want to lose his rights to someone with a lot of money. This has cost him a
lot of time and money, and he doesn’t like how “we” hand docks to rich people, the Davenports. Mr.
Burgess said each project is based on its own merits.
Ms. Lawrence motions to continue to May 14. This was seconded by Mr. Churchill and the motion
passed 4-0-1. Ms. Brooks chimed in that new plans and materials must be submitted 2 weeks prior to
the next meeting.
b. Shorefront Consulting, 49 Neptune Lane, proposed reconstruction of bulkhead, floats,
and relocation of landing
This project is looking to move the pier and leave the floats in the same place so the homeowners can
have more space on the floats. The piles will be pulled and will be reused if in good condition.
Ms. Lawrence motions to recommend this project to Conservation. The motion is seconded by Mr.
Moynihan, and the motion passed 5-0.
On //2026, on a motion by committee member , seconded by committee member , the
Waterways & Shellfish Advisory Committee voted - to approve these minutes as written.
c. Shorefront Consulting, 14 Compass Drive, proposed bulkhead
The bulkhead will be replaced to match the adjacent bulkhead by moving landward and increasing in
height. The “corner” is dangerous and the bulkhead will be brought out by building in front of the
existing structure. There are also large stones in the water that were placed as an experiment that will
also be removed.
Mr. Moynihan motions to recommend this project to Conservation. The motion was seconded by Ms.
Lawrence and passed 5-0.
d. Shorefront Consulting, 7 Cape Isle Drive, proposed float reconfiguration, platform and
bulkhead reconstruction
These floats are out of compliance and will be brought back into compliance. The bulkhead will be
replaced in kind.
Mr. Churchill motioned to recommend this project to Conservation. Ms. Lawrence seconded and the
motion passed 5-0.
e. Shorefront Consulting, 166 Blue Rock Road & 172 Blue Rock Road, proposed repairs, and
ultimately a reconstruction and reconfiguration, of landing and access stairs, and
reconstruction and extension of bulkhead
As was explained by Mr. Burgess, this project is a carbon copy of the neighbor’s project. The bulkhead
will tie into the neighbors, but only cosmetically. It will be treated like a new bulkhead and will be filled
behind at a moderate slope. There will be stairs leading down to the beach as well. The anticipated
timeline would see permitting over summer and a fall project due to possible DMF requirements.
Ms. Lawrence motioned to recommend this project Conservation. It was seconded by Mr. Moynihan and
passed 5-0.
f. Shorefront Consulting, 66A River Street, lengthen ramp and change float size and shape
The goal of this project, explained by Mr. Burgess, is to get a longer dock. Ms. Lawrence said this project
previously had limited the watercraft to a 17’ whaler, and the current boat is much larger. Director
Condon chimed in that we have no say in what boat is put on a dock. Ms. Lawrence voiced concerns
about the distance this dock is from the public beach near the windmill and with the past history of this
applicant she cannot support it.
Mr. Dunbar asked about the shellfish and was told no survey was done. Mr. Burgess explained the
shellfish would be relocated at the time of the project. It was discussed by the Director that while it is a
commercial area, the floats are seasonal and would not impede winter shellfishing and relocating any
shellfish is reasonable.
On //2026, on a motion by committee member , seconded by committee member , the
Waterways & Shellfish Advisory Committee voted - to approve these minutes as written.
Ms. Lawrence motions to not recommend this project to conservation. It was seconded by Mr. Dunbar
and passed 5-0. When asked for further reasoning on why the motion went this way Ms. Lawrence
replied it was due to concerns about what goes on the float and the distance to the beach.
Discussion continued and Mr. Churchill asked how this complied with current regulations and Ms.
Lawrence said it appeared to be within 100’ of the channel. Ms. Brooks recommended for committee
members to remove their personal feelings about boats and look at the project for what it is. Director
Condon reiterated that this committee looks for impacts on navigation and shellfish and that is it. Mr.
Moynihan has more clarity and understands the situation.
Mr. Moynihan motioned to rescind the previous motion. Ms. Lawrence seconded the motion, and it
passed 5-0.
Mr. Moynihan motioned to recommend the project to Conservation with the condition that DNR will be
notified when shellfish are to be relocated, prior to driving in piles. The motion was seconded by Ms.
Lawrence, and the motion passed 3-1-1 with Ms. Lawrence voting against it and Mr. Churchill abstaining.
3. Approval of Meeting Minutes: 3/12/2026
Mr. Moynihan motioned to approve the minutes as written. Seconded by Mr. Churchill, and the motion
passed 4-0.
4. Mooring and Slip Past Due Appeal Process
Director Condon gave an overview of the renewal process. The Town of Yarmouth’s slip and mooring
renewal date is April 1. Renewals for the waitlist are April 15th, and these dates have been in place for
many years. The Director says he has a mooring in Barnstable, and the Town sends 1 email when the
renewals open. The Town of Yarmouth historically had paper applications and renewals that were
mailed out but around 2021 we changed to City Hall Systems. At that point emails were sent out with
reminders to renew, and prior management let people pay late up to an arbitrary amount of time.
Director Condon thinks we should stick to the deadline that has been given, April 1.
It was explained that Town staff sent an initial email on January 14th for the opening of renewals for
2026. 3 additional reminder emails were sent out on March 5, 26, and 30th. The DNR office wanted to
make sure nobody had an excuse to say they did not know about the due date. Phone calls to the
numbers on file were made on March 31st and there was also a signboard outside the office with a
reminder message. Director Condon believes Town staff has gone above and beyond to help mooring
and slip holders with reminders of the April 1st deadline. He also said it is up to the mooring/slip holder
to make sure their contact information is up to date including phone number and email address. It is the
responsibility of the mooring/slip holder to pay by the deadline. For context, one person has called to
say they missed the due date and would like to keep their mooring. On a staff level, the answer is no to
accepting late payments after April 1. We will have clarity on this once the regulations are redone, but
until then anything in the “grey” will go to waterways.
On //2026, on a motion by committee member , seconded by committee member , the
Waterways & Shellfish Advisory Committee voted - to approve these minutes as written.
Chairman Mallet said our staff is employed to enforce the regulations. Mr. Moynihan said the staff went
above and beyond to help mooring/slip holders, and the due date is the due date, and people are out of
luck if they miss it. He said he might like to see the Town keep a few reminders but set a parameter,
such as 2 emails prior to the deadline. Ms. Brooks explained that as people give up moorings people on
the waitlist are issued a mooring.
Ms. Lawrence adds that we can add something into the regulations where late payments will go before
the Waterways committee. She also said the second reminder might be the most important because it is
after the holidays, committees she has been on sends emails the first of the year with 2 additional after
that.
Mr. Mallet said he would not want to listen to someone appeal to keep their mooring, but the rest of
the committee sounded like they would be okay with hearing why people could not pay on time. Mr.
Moynihan said it would probably have to be a pretty big extenuating circumstance considering the
number of emails and the phone call that went out.
Mr. Moynihan motions to implement a failure to pay process for 2026. This process requires the
submission of a written request, explaining their failure to pay, to the DNR office by April 30th. This
request will be reviewed by the committee, and a vote will be taken at the May 14th meeting.
Mr. Mallet said this is an appeal to get their mooring back. Ms. Brooks explained to the committee that
all outstanding moorings have been canceled preventing people from renewing online.
A call for all in favor, and the motion passed 5-0.
5. Committee Discussion & Division Updates
Director Condon provided updates. The Eco One Stop application was submitted, asking for $2.8 million
for a $3.3 million project. CZM had encouraging feedback though they could not disclose specifics. Our
approach was to break out all the “pieces” of the project in hopes of getting them all funded. We
received a $504,000 match from the Community Preservation Committee.
We are still short staffed with a full-time employee at the police academy, the shellfish constable on
leave, and seasonal staff are in the works for the summer season. Docks will be going in soon. We will
have a MEPA review for upper Bass River dredging permitting process.
We have gone through the procurement for the contaminated shellfish relay for 2026. We have over
wintered oyster, and planted quahogs under nets. The upweller at Parkers River is being redone and a
new fence is also going to be put in.
The Bass Hole Marina pier sustained damage from the winter storm in February so slip holders will be
delayed until June 1. The boardwalk is going out to bid and funding is being determined.
On //2026, on a motion by committee member , seconded by committee member , the
Waterways & Shellfish Advisory Committee voted - to approve these minutes as written.
May 2 the Parkers River Landing will have its grand opening. DNR will present at the May Select Board
hearing on the Packet Landing project and there will also be a public meeting on May 13th regarding this.
Mr. Moynihan made a motion to adjourn, seconded by Ms. Lawrence. The motion passed 4-0.