Loading...
HomeMy WebLinkAbout792-792-125 (2)58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:5/11/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 4/27/2026 Time Cast: 7:50 AM Date Received: 4/28/2026 Placement Location:SBR WALLS 15 & 27 Placement Method:PUMP Cylinders Made By:Andrew Carter Material Type:Concrete Cylinders Placement Vol. (yd ):106 Aggregate Size (in):4 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures: TEST RESULTS Slump (in) (C-143):7 1/2 Air Content (%) (C-231):3.4 Air Temp (°F):44 Conc. Temp (°F) (C-1064):61 Load Number:1 Mixer Num.:53 Ticket Num.:51543 Cubic Yards:11 Design (psi):4500 Batch 6:26 AM Arrive 7:10 AM Depart 8:05 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-125F N 29.00 6 28.23 4/29/2026 Lab Unbonded 2 5 101.72 3600 792-125A N 29.30 6 28.23 5/4/2026 Lab Unbonded 7 5 124.14 4390 792-125B N 29.00 6 28.27 5/11/2026 Lab Unbonded 14 5 144.78 5120 792-125C 29.35 5/25/2026 Lab 28 792-125D 29.00 5/25/2026 Lab 28 792-125E 29.00 5/25/2026 Lab 28 3 2 Remarks:Kaylie OSullivan Reviewed By