HomeMy WebLinkAboutMitigation plan 5.12.2026Hamlyn Consulting
690 Thousand Oaks Drive
Brewster, MA 02631
774-323-0603
Notes
Substitutions allowed with prior approval of Conservation Administrator.
Locations may be field adjusted.
Remove existing gravel and lawn from 10-foot buffer to top of bulkhead
Temporary irrigation may be used for the first growing season.
Mitigation area to be undisturbed in perpetuity.
Failed plantings are to be be replaced to 90% survival.
Edge of existing vegetation
(removed with bulkhead repair)
Plan section from
Plan Showing Proposed Bulkhead Reconstruction
49 Neptune Lane, South Yarmouth, MA
prepared for Neptune Lane Irrevocable Trust
Down Cape Engineering, Shorefront Consulting
4/17/26
Plant in 10' buffer strip to top of bulkhead
(3) Inkberry (Ilex glabra), 2 gal. 4' on center
(3) Red chokeberry (Aronia arbutifolia), 2 gal., 4' on center
(6) Virginia rose (Rosa virginiana), 2 gal., 4' on center
(19) Sweet fern (Comptonia peregrina), 1 gal., 30" on center
(25) Seaside goldenrod (Solidago sempervirens), 1 gal., 1' on center
(29) Little bluestem (Schizachyrium scoparium), 1 gal., 1' on center
(~300 to fill 280 sf, planted 1' o.c.) Bearberry (Arctostaphylos uva ursi), 4" pot
N
Proposed mitigation area 10'
from top of bulkhead, 780 sf.
Proposed Mitigation Plan
prepared for
Neptune Lane Irrevocable Trust
Raoul M. Chalifoux, Trustee
49 Neptune Lane, South Yarmouth, MA
Date: April 30, 2026 Scale: 1"=20'
rev. 5/12/26