Loading...
HomeMy WebLinkAboutMitigation plan 5.12.2026Hamlyn Consulting 690 Thousand Oaks Drive Brewster, MA 02631 774-323-0603 Notes Substitutions allowed with prior approval of Conservation Administrator. Locations may be field adjusted. Remove existing gravel and lawn from 10-foot buffer to top of bulkhead Temporary irrigation may be used for the first growing season. Mitigation area to be undisturbed in perpetuity. Failed plantings are to be be replaced to 90% survival. Edge of existing vegetation (removed with bulkhead repair) Plan section from Plan Showing Proposed Bulkhead Reconstruction 49 Neptune Lane, South Yarmouth, MA prepared for Neptune Lane Irrevocable Trust Down Cape Engineering, Shorefront Consulting 4/17/26 Plant in 10' buffer strip to top of bulkhead (3) Inkberry (Ilex glabra), 2 gal. 4' on center (3) Red chokeberry (Aronia arbutifolia), 2 gal., 4' on center (6) Virginia rose (Rosa virginiana), 2 gal., 4' on center (19) Sweet fern (Comptonia peregrina), 1 gal., 30" on center (25) Seaside goldenrod (Solidago sempervirens), 1 gal., 1' on center (29) Little bluestem (Schizachyrium scoparium), 1 gal., 1' on center (~300 to fill 280 sf, planted 1' o.c.) Bearberry (Arctostaphylos uva ursi), 4" pot N Proposed mitigation area 10' from top of bulkhead, 780 sf. Proposed Mitigation Plan prepared for Neptune Lane Irrevocable Trust Raoul M. Chalifoux, Trustee 49 Neptune Lane, South Yarmouth, MA Date: April 30, 2026 Scale: 1"=20' rev. 5/12/26