Loading...
HomeMy WebLinkAbout792-792-128 (1)58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:5/13/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 4/29/2026 Time Cast: 9:25 AM Date Received: 5/1/0026 Placement Location:SBR SLABS 23, 24, 25 Placement Method:PUMP Cylinders Made By:Rob Reuter Material Type:Concrete Cylinders Placement Vol. (yd ):240 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:MIX EL SIKA CONTROL 75 TEST RESULTS Slump (in) (C-143):9 Air Content (%) (C-231):3.8 Air Temp (°F):46 Conc. Temp (°F) (C-1064):60 Load Number:12 Mixer Num.:83 Ticket Num.:51592 Cubic Yards:11 Design (psi):4500 Batch 8:28 AM Arrive 9:15 AM Depart 9:51 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-128A N 29.20 6 28.32 5/6/2026 Lab Unbonded 7 5 138.72 4910 792-128B N 29.20 6 28.32 5/13/2026 Lab Unbonded 14 5 150.65 5330 792-128C 29.20 5/27/2026 Lab 28 792-128D 29.20 5/27/2026 Lab 28 792-128E 29.20 HOLD Lab 3 2 Remarks:Kaylie OSullivan Reviewed By