Loading...
HomeMy WebLinkAboutCCOR 05-14-2026 792-135 to 792-136Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:5/14/2026 Client:Wright-Pierce Client Rep:Reyssa Fonte-CDM Weather:Cloudy 57 - 59°F S.W.COLE Rep:Alexander CharnitskyGeneral Contractor:Nickerson Time Onsite:06:15 - 10:45 Placement Type: Footing  Wall  Slab  OtherPlacement Location:SBR Wall 14/ Solids Handling Building Walls 8 and 9 Concrete Placement Observations Observed Comments Required mix used Yes 4500psi, 1 1/2", 3/4", Sika 75 Concrete properly conveyed to all areas of placement Yes Pump Truck Internal vibration / consolidation of concrete Yes Handheld vibrator Even layering around openings and embedments Yes Concrete evenly layered and vibrated around openings and embedments Post placement observations (finishing, curing, etc.)Yes Concrete Manually Finished Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-135 to 792-136  *Refer to associated concrete test report Notes: As requested by Rayssa with CDM Smith, S.W.COLE rep was onsite to perform concrete sampling and testing for the locations referenced above. S.W.COLE Construction Services Technician AEC arrived on site at approximately 6:15 AM to observe concrete placement and perform sampling and testing. Concrete Delivery No. 1 arrived on site consisting of approximately 10 cubic yards of 4,500‑psi concrete with ¾‑inch aggregate, placed via pump truck. One set of tests was performed on Truck No. 69 with the following results: Slump: 8 inches Air Content: 4.0 percent Concrete Temperature: 68°F One set of compression test cylinders was cast for laboratory testing at 7, 14, and 28 days (two cylinders), along with one hold cylinder. The pump truck was observed completing concrete placement activities at SHB Walls 8 and 9 and subsequently relocated to SBR Wall 14. Concrete Delivery No. 2 arrived on site consisting of approximately 10 cubic yards of 4,500‑psi concrete with 1½‑inch aggregate. It was reported that Sika 75 admixture was added prior to placement. Concrete was placed via pump truck. One set of tests was performed on Truck No. 51 with the following results: Slump: 8 inches Air Content: 4.5 percent Concrete Temperature: 67°F Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com One set of compression test cylinders was cast for laboratory testing at 7, 14, and 28 days (two cylinders), along with one hold cylinder. Test results and field observations were verbally reported to Rayssa while onsite. AEC concluded field activities, secured testing equipment, and departed the site at approximately 10:45 AM. Attachments: 2 Photos Reviewed by:5/15/2026 Kaylie OSuivKaylie OSullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com SHB Walls 8/9 SBR Wall 14