HomeMy WebLinkAboutCCOR 05-15-2026 792-137 to 792-139Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:5/15/2026 Client:Wright-Pierce Client Rep:Reyssa FonteCDM Weather:Cloudy 50 - 53°F S.W.COLE Rep:Alexander CharnitskyGeneral Contractor:Nickerson Time Onsite:05:30 - 11:45 Placement Type: Footing  Wall  Slab  OtherPlacement Location:SBR Slab Section 62, Equilization Tank Slabs 55, 62 Concrete Placement Observations Observed Comments Required mix used Yes 4500psi, 1 1/2", Sika 75, 1% Nonchloride Concrete properly conveyed to all areas of placement Yes Pump Truck Internal vibration / consolidation of concrete Yes Handheld vibrator Even layering around openings and embedments Yes Concrete evenly layered and vibrated around openings and embedments Post placement observations (finishing, curing, etc.)Yes Concrete Manually Finished Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-137 to 792-139  *Refer to associated concrete test report Notes: As requested by Rayssa (CDM Smith), S.W.COLE rep was onsite to observe concrete placement and perform concrete sampling and testing at the locations referenced above. The S.W.COLE Construction Services Technician arrived onsite at approximately 5:30 AM. Concrete placement activities were observed during the time of sampling and testing. Concrete Delivery No. 1 arrived onsite consisting of approximately 11 cubic yards of 4,500‑psi concrete with 1‑1/2‑inch aggregate, which was placed via pump truck. Three sets of concrete tests were performed with the following results: Truck 62 – Load 1 Slump: 8.5 inches Air Content: 4.5 percent Concrete Temperature: 65°F Truck 64 – Load 11 Slump: 8.5 inches Air Content: 4.5 percent Concrete Temperature: 65°F Truck 58 – Load 23 Slump: 8.5 inches Air Content: 4.7 percent Concrete Temperature: 67°F Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Three sets of compression test cylinders were cast for laboratory testing at 7, 14, and 28 days (two cylinders per test age), along with one hold cylinder. Test results and observations were verbally reported to the onsite client representative while onsite. The S.W.COLE representative departed the site at approximately 11:45 AM after completing the requested services. Attachments: 3 Photos Reviewed by:5/18/2026 Kaylie OSuivKaylie OSullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com