Loading...
HomeMy WebLinkAboutResponse to DMF 5.18.2026Attention!: This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. From:Mark Burgess To:DMF EnvReview-South (FWE); DiRienzo, Brittany; Condon, David; Jerolimo, Joseph Cc:Logan, John (FWE); Davis, Amanda (FWE); Hecht, Alicia A (FWE); Camisa, Matt (FWE); Williams, Holly (FWE); Cotone, Victoria; Bordonaro, Patrice (EEA) Subject:Re: NOI, Campagna, 14 Compass Drive, Yarmouth Date:Monday, May 18, 2026 3:52:40 PM Hi Alicia; Thanks for sending this along. I would like to clarify one of your questions. The rocks that may need to be removed to fit the sheeting in behind them (Landward) will only be removed so the sheeting can fit behind the rocks. The fronting rocks and their wave absorption capability will remain. It may be possible to place the sheeting directly behind the rocks without removing any at all, and that would be the goal. If there are other interferences that are not visible, we'll just work around that, but the goal is to leave the fronting rocks. hope that helps Mark Burgess B.S. Ocean Engineering Shorefront Consulting "If You Want A Dock, We Have To Talk" "Engineers get to work when they say it can’t be done….." 290 Center Street, Dennis Port, MA 02639 Phone: 508-280-8046 Email: shorefrontconsulting@gmail.com Web: www.shorefrontconsulting.com Facebook: Shorefront Consulting I will be transitioning to part time in 2026, taking on smaller projects. If you know anyone who can benefit from my services, please let me know.   On 5/18/2026 2:27 PM, DMF EnvReview-South (FWE) wrote: Dear Commissioners:                                                               The Massachusetts Division of Marine Fisheries (MA DMF) has reviewed the Notice of Intent (NOI) by Tony and Jane Campagna to reconstruct an existing permitted bulkhead within Parkers River at 14 Compass Drive in the Town of Yarmouth. The applicants are proposing to move rocks as necessary to reconstruct the western portion of the bulkhead. The project was reviewed with respect to potential impacts to marine fisheries resources and habitat. Please find attached the full review.  Questions regarding this review may be directed to Amanda Davis in our New Bedford office at Amanda.davis@mass.gov. Thank you, Alicia Hecht Sent on behalf of Amanda Davis Environmental Review Administrative Assistant MA Division of Marine Fisheries 836 S. Rodney French Boulevard New Bedford, MA 02744 http://www.mass.gov/eea/agencies/dfg/dmf/