Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
5239 60 Ansel Hallet Rd Nitrogen Loading Calculation Received 05.20.26
Town of Yarmouth §207-11 Nitrogen Loading Calculation Project: 60 Ansel Hallet Road Use: Commercial / Industrial Establishment Wastewater Type: Domestic sink and toilet waste only Input Values Item Value Units Notes Employees 10 employees Proposed staffing Title V Flow Factor 15 gpd/employee Warehouse / Storage -type use Title V Sewage Flow 150 gpd 10 employees × 15 gpd/employee Effluent Nitrogen Concentration 25 ppm Domestic wastewater per Yarmouth §207- 11 Lawn Area 9,500 SF Parking lot islands/landscaped areas Lot Area 2.67 acres 116,207 SF ÷ 43,560 Calculation Methodology Step 1 – Wastewater Nitrogen Load 150 gpd × 25 ppm ÷ 328 = 11.43 Step 2 – Lawn Nitrogen Load 9,500 SF × 1.8 ÷ 1,000 = 17.10 Step 3 – Total Nitrogen Load 11.43 + 17.10 = 28.53 Step 4 – Final Nitrate Loading 28.53 × 0.275 ÷ 2.67 acres = 2.93 ppm Conclusion Based on the above calculation methodology from Town of Yarmouth §207-11, the proposed commercial / warehouse establishment results in an estimated nitrate loading of approximately 2.93 ppm, which is below the 5.0 ppm threshold.