HomeMy WebLinkAboutVariance request 5.26.2026
Shorefront Consulting
Professional Services on Land or At Sea
290 Center St., Dennis Port, MA 02639 www.shorefrontconsulting.com
508-280-8046 shorefrontconsulting@gmail.com
Yarmouth Conservation Commission May 26, 2026
Attn: Brittany DiRienzo
1146 Route 28
South Yarmouth, MA 02664-4492
By hand delivery and email
Re: Notice of Intent Application Filing Package; Request for Variance for work within the 35’ buffer
Proposed Reconstruction of Existing Bulkhead
Tony and Jane Campagna
14 Compass Drive
South Yarmouth, MA 02664
Map 19, Parcel 73
On behalf of my clients, Tony and Jane Campagna, I am submitting this request for a variance from work that has taken
place (after the fact) within the 35-foot buffer zone. The work consists of a patio that is under an existing deck which
occupies approximately 150 square feet. There is also an unpermitted additional deck around the patio which occupies
approximately 90 square feet. The total square footage of the unpermitted work is approximately 240 square feet.
The applicant is requesting a variance to maintain these existing structures and provide the necessary mitigation to offset
any perceived negative impacts from the structures. For instance, there is an existing garden area that can be converted to
mitigation plantings which occupies approximately 320 square feet. There is also an existing vegetated buffer on the west
side of the property between the seawall and the patio which occupies approximately 925 square feet. No specific
mitigation is offered because the bylaws state that the mitigation must be specified by the commission for any work
within the 35-foot buffer. We are happy to work with the commission to determine the appropriate mitigation that is
provided by the applicant that will allow the structures to remain and be conditioned to contribute to the protection of the
resource areas, utilizing a combination of the existing buffer and additional buffer plantings as necessary.
The existing patio is pervious, and will not affect the surrounding resource areas in regards to the wetlands interests. The
patio does not trap water or pollutants and will provide drainage and absorption of runoff and protect the waterway from
infiltration of storm water. The applicant can remove the patio and utilize gravel with some pavers so that chairs can be
placed with stability.
The additional decking around the pool area replaces approximately 90 square feet of turf lawn. There is an existing
garden area that can be utilized for additional plantings if necessary. The bulkhead on the north side is being relocated
approximately 1.5 feet landward, increasing resource area (land under ocean and land containing shellfish) and reducing
lawn and garden areas by approximately 60 square feet.
The alternatives which exist to rectify the after the fact work are simply to remove either (or both) the patio and decking
in their entirety, or utilize a combination of existing structures and mitigation (of which there are endless options). Again,
the applicant will work with the commission to provide the appropriate mitigation.
The potential environmental impacts and environmental benefits to the after the fact work reduce turf lawn, and provide
drainage in the flood zone to protect the waterway. There are many options to consider and we look forward to discussing
them with the commission to provide the necessary result.
Please schedule this request for your June 4th, 2026 public hearing. If there are any questions or concerns regarding this
filing, please contact me as soon as possible.
Sincerely,
Mark Burgess
Shorefront Consulting
B.S. Ocean Engineering
Enclosures: As Stated
cc: Tony and Jane Campagna (Applicants)