Loading...
HomeMy WebLinkAboutRE_ YARMOUTH - NOI - 703 ROUTE 28 - STEVEN KATZAttention!: This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. From:Paul Mancuso To:DiRienzo, Brittany; Jerolimo, Joseph Cc:Brian Yergatian; Mackenzie Morrison; Kieran J. Healy Subject:RE: YARMOUTH - NOI - 703 ROUTE 28 - STEVEN KATZ Date:Thursday, May 28, 2026 9:20:20 AM Attachments:NOI_703Route28_Redevelopment_2026.pdf 2026-05-27 703 Route 28_Site Plans.pdf Hi Brittany & Joe, Attached here are the revised NOI packet and plan set for 703 Route 28 in Yarmouth. I am printing stuff out now and will be coming by your office to drop off hard copies. Your original comments are copied and pasted below with answers. General Variance needed from 50' no build buffer zone Included variance request. structures should be no closer than existing (66.3' existing, 46.2' proposed) from coastal bank- there appears to be space for the houses to remain outside 50', can you please submit an alternatives analysis exploring this and why it isn’t possible? Existing building is 36.2” from coastal bank, proposed is 46.2’ from coastal bank; 10’ further than existing. Can’t move buildings further from River because of driveway and stormwater infiltration system which is as far from resource areas as possible, and buildings are as close to driveway/infiltration system as possible. I added text about this to the Alternative Analysis section. What is the proposed surface for the 5’ pedestrian pathway? Why is this needed/can it be minimized? Mulch pathway proposed. Requested variance. Would be amendable to shell path or another alternative. There is a pedestrian easement along Parker’s River, so we need to provide access. Work Limit Line: I will recommend tightening it to just past existing edge of pavement to protect any existing buffer within the no disturb 35’ buffer zone No work inside 35’ buffer except for plantings along parkers river. Plants A vegetated buffer exists on the west and south sides- what are its components? If native plants are present, they must remain and be protected during the work. I recommend assessment of the components of the existing plants and keep/protect all native species, flush cut any if they are damaged, removing any invasive species, and supplementing where needed with additional plantings species, DBH, and location of any trees to be removed must be shown on the demo plan. We are proposed to keep native trees over 4” DBH. Most of the larger trees are autumn olive. Plant spacing must be shown on landscape plan. Table now includes spacing for each plant. Include the seed components of 'erosion control seed mix' and where it will be applied on landscape plan. Inlcuded. What is proposed in the area between structures and planted buffer? If lawn/grass, detail the seed/species proposed and maintenance needs. Seed mix included. straight species is required for proposed trees Show square footage of proposed planted buffer vs existing vegetated buffer Included in narrative. Existing buffer is 2,469 sf and Proposed buffer is 3,386sf. Larger shrubs with varying heights preferred. Included some red cedar, red maple, and bayberry. Best, Paul Mancuso Paul Mancuso, WPIT (he/ him) Associate, Wetland Scientist 349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 O: 508-778-8919 / D: 617-896-4587 / C: 781-264-8043 PMancuso@BSCGroup.com From: Paul Mancuso Sent: Tuesday, May 19, 2026 3:07 PM To: DiRienzo, Brittany <BDiRienzo@yarmouth.ma.us>; Jerolimo, Joseph <JJerolimo@yarmouth.ma.us> Subject: RE: YARMOUTH - NOI - 703 ROUTE 28 - STEVEN KATZ Hello, BSC would like to request to continue the NOI and RCOC for 703 Route 28 until the June 4th Yarmouth Conservation Commission hearing. We will have all of your edits/comments addressed to you before a week before the hearing date. I will try to get a status of the cleanup on Site, but the proposed project itself is redevelopment of previously degraded RFA. So, if/when the project gets approved then the entire Site will be cleaned up and redeveloped and all potential hazards on Site would be removed. Best, Paul Mancuso Paul Mancuso, WPIT (he/ him) Associate, Wetland Scientist 349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 O: 508-778-8919 / D: 617-896-4587 / C: 781-264-8043 PMancuso@BSCGroup.com Attention!: This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise From: DiRienzo, Brittany <BDiRienzo@yarmouth.ma.us> Sent: Tuesday, May 19, 2026 11:59 AM To: Jerolimo, Joseph <JJerolimo@yarmouth.ma.us>; Paul Mancuso <pmancuso@bscgroup.com> Subject: RE: YARMOUTH - NOI - 703 ROUTE 28 - STEVEN KATZ Hi Paul, Please submit your continuance request for both the NOI and COC in writing. The commission is also seeking an update on the status of the site cleanup as they are extremely concerned about the potential hazards onsite. Thanks, Brittany DiRienzo Conservation Administrator Town of Yarmouth bdirienzo@yarmouth.ma.us 508-398-2231 x1288 Conservation Website From: Jerolimo, Joseph <JJerolimo@yarmouth.ma.us> Sent: Thursday, May 14, 2026 9:28 AM To: Paul Mancuso <pmancuso@bscgroup.com> Cc: DiRienzo, Brittany <BDiRienzo@yarmouth.ma.us> Subject: RE: YARMOUTH - NOI - 703 ROUTE 28 - STEVEN KATZ Hi Paul, Just a reminder that the deadline for the updated materials for this application are due today at noon. Let us know if you’ll need to continue again. Regards,Joe JerolimoConservation AgentTown of Yarmouthjjerolimo@yarmouth.ma.us508-398-2231 x7007 From: Paul Mancuso <pmancuso@bscgroup.com> Sent: Tuesday, May 5, 2026 11:41 AM To: Jerolimo, Joseph <JJerolimo@yarmouth.ma.us> Cc: DiRienzo, Brittany <BDiRienzo@yarmouth.ma.us> Subject: RE: YARMOUTH - NOI - 703 ROUTE 28 - STEVEN KATZ Attention!: This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. delete this email. Yes please. Thanks Joe. Best, Paul Mancuso Paul Mancuso, WPIT (he/ him) Associate, Wetland Scientist 349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 O: 508-778-8919 / D: 617-896-4587 / C: 781-264-8043 PMancuso@BSCGroup.com From: Jerolimo, Joseph <JJerolimo@yarmouth.ma.us> Sent: Tuesday, May 5, 2026 11:40 AM To: Paul Mancuso <pmancuso@bscgroup.com> Cc: DiRienzo, Brittany <BDiRienzo@yarmouth.ma.us> Subject: RE: YARMOUTH - NOI - 703 ROUTE 28 - STEVEN KATZ Thanks Paul, this email is all we need for the request. Would you like to continue the COC request as well? The Commission may want to discuss the site conditions. When we did the site visit yesterday they were pretty concerned about the trash, car batteries and antifreeze that were all being stored out in the open so close to the river. Regards,Joe JerolimoConservation AgentTown of Yarmouthjjerolimo@yarmouth.ma.us508-398-2231 x7007 From: Paul Mancuso <pmancuso@bscgroup.com> Sent: Tuesday, May 5, 2026 11:25 AM To: DiRienzo, Brittany <BDiRienzo@yarmouth.ma.us>; Jerolimo, Joseph <JJerolimo@yarmouth.ma.us> Subject: RE: YARMOUTH - NOI - 703 ROUTE 28 - STEVEN KATZ Hi Brittany & Joe, We would like to request a continuance for this project until the May 21st hearing. That should give me time to address the questions/comments in the email below. Do you need anything else from me for the continuance request? Best, Paul Mancuso Paul Mancuso, WPIT (he/ him) Associate, Wetland Scientist 349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 O: 508-778-8919 / D: 617-896-4587 / C: 781-264-8043 PMancuso@BSCGroup.com From: DiRienzo, Brittany <BDiRienzo@yarmouth.ma.us> Sent: Friday, April 24, 2026 12:11 PM To: Paul Mancuso <pmancuso@bscgroup.com>; Jerolimo, Joseph <JJerolimo@yarmouth.ma.us> Subject: RE: YARMOUTH - NOI - 703 ROUTE 28 - STEVEN KATZ Hi Paul, I’ve reviewed the application and have the following questions/comments: General Variance needed from 50' no build buffer zone structures should be no closer than existing (66.3' existing, 46.2' proposed) from coastal bank- there appears to be space for the houses to remain outside 50', can you please submit an alternatives analysis exploring this and why it isn’t possible? What is the proposed surface for the 5’ pedestrian pathway? Why is this needed/can it be minimized? Work Limit Line: I will recommend tightening it to just past existing edge of pavement to protect any existing buffer within the no disturb 35’ buffer zone Plants A vegetated buffer exists on the west and south sides- what are its components? If native plants are present, they must remain and be protected during the work. I recommend assessment of the components of the existing plants and keep/protect all native species, flush cut any if they are damaged, removing any invasive species, and supplementing where needed with additional plantings species, DBH, and location of any trees to be removed must be shown on the demo plan Plant spacing must be shown on landscape plan Include the seed components of 'erosion control seed mix' and where it will be applied on landscape plan Attention!: This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. What is proposed in the area between structures and planted buffer? If lawn/grass, detail the seed/species proposed and maintenance needs straight species is required for proposed trees Show square footage of proposed planted buffer vs existing vegetated buffer Larger shrubs with varying heights preferred I will be out of the office between 4/30-5/7 so Joe will cover the meeting, but I’d be happy to discuss any of these beforehand if you have any questions. Regards, Brittany DiRienzo Conservation Administrator Town of Yarmouth bdirienzo@yarmouth.ma.us 508-398-2231 x1288 Conservation Website From: Paul Mancuso <pmancuso@bscgroup.com> Sent: Wednesday, April 22, 2026 9:20 AM To: Jerolimo, Joseph <JJerolimo@yarmouth.ma.us> Cc: DiRienzo, Brittany <BDiRienzo@yarmouth.ma.us> Subject: RE: YARMOUTH - NOI - 703 ROUTE 28 - STEVEN KATZ Hi Joe, Attached here is the updated certified abutters list. Ownership of the abutting properties has not changed. Also attached are the green certified mail receipts from the abutter notifications. Also attached is the updated NOI packet with the Alternative Analysis updated with square footages. Our engineer is updating the project plans with the 35’, 50’ and 100’ buffer to coastal bank lines as well as updating the impact table to display those impacts. I will email you a PDF of those once i have the updated plans. We will have the hard copies of the updated plan and NOI packet to you tomorrow before noon. For the hard copies, do you want multiple copies of the revised plan and NOI? Maybe just multiple copies of the updated project narrative and the plan sheet C-2.0? Let me know, thank you! Best, Paul Mancuo Attention!: This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. Paul Mancuso, WPIT (he/ him) Associate, Wetland Scientist 349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 O: 508-778-8919 / D: 617-896-4587 / C: 781-264-8043 PMancuso@BSCGroup.com From: Jerolimo, Joseph <JJerolimo@yarmouth.ma.us> Sent: Wednesday, April 15, 2026 1:01 PM To: Paul Mancuso <pmancuso@bscgroup.com> Cc: DiRienzo, Brittany <BDiRienzo@yarmouth.ma.us> Subject: RE: YARMOUTH - NOI - 703 ROUTE 28 - STEVEN KATZ Hello, I have reviewed your NOI and it is currently administratively incomplete. In order to be scheduled on the 5/7/2026 agenda we will need the following by noon on 4/23/2026. A current (<30 days old) abutters list. Certified Mail Receipts (PS Form 3800) for all abutters matching the revised list. The alternatives analysis should be revised to include the actual area values rather than “XX”. The resource area impact table on sheet C-2.0 should be revised according to our plan requirements by including the 0-35’, 35-50’ and 50-100’ buffers. The signature page does not include a date for the applicant’s signature. Regards,Joe JerolimoConservation AgentTown of Yarmouthjjerolimo@yarmouth.ma.us508-398-2231 x7007 From: Paul Mancuso <pmancuso@bscgroup.com> Sent: Friday, April 10, 2026 1:59 PM To: SERO_NOI (DEP) <sero_noi@mass.gov>; DiRienzo, Brittany <BDiRienzo@yarmouth.ma.us>; Jerolimo, Joseph <JJerolimo@yarmouth.ma.us> Subject: RE: YARMOUTH - NOI - 703 ROUTE 28 - STEVEN KATZ Hello, Yes, the signed signature page is attached here as well as an updated PDF of the whole NOI packet with the signature page inserted. CAUTION: This email originated from a sender outside of the Commonwealth of Massachusetts mail system. Do not click on links or open attachments unless you recognize the sender and know the content is safe. Sorry about that, i made one last edit to the WPA3 form right before i finalized the NOI and i forgot to insert the signed signature page back in. Best, Paul Mancuso Paul Mancuso, WPIT (he/ him) Associate, Wetland Scientist 349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 O: 508-778-8919 / D: 617-896-4587 / C: 781-264-8043 PMancuso@BSCGroup.com From: SERO_NOI (DEP) <sero_noi@mass.gov> Sent: Friday, April 10, 2026 12:13 PM To: Paul Mancuso <pmancuso@bscgroup.com> Subject: Re: YARMOUTH - NOI - 703 ROUTE 28 - STEVEN KATZ Hi Paul, Can you please provide a copy of pg 9 of the WPA Form that includes the required signatures? Thank you. Warm Regards, Lauren From: Paul Mancuso <pmancuso@bscgroup.com> Sent: Friday, April 10, 2026 9:01 AM To: SERO_NOI (DEP) <sero_noi@mass.gov>; DiRienzo, Brittany <BDiRienzo@yarmouth.ma.us>; Jerolimo, Joseph <jjerolimo@yarmouth.ma.us> Cc: Brian Yergatian <byergatian@bscgroup.com>; Matthew T. Creighton <mcreighton@bscgroup.com> Subject: YARMOUTH - NOI - 703 ROUTE 28 - STEVEN KATZ Hello DEP SERO & Yarmouth Conservation, Attached here is a notice of intent application that is being submitted with the Yarmouth Conservation Department for proposed work at 703 Route 28 in South Yarmouth. There are two attachments here. I will send a separate email with a pdf of the stormwater report as I cannot fit all three attachments in this email. 1. NOI packet 2. NOI Plans Hardcopies of the application, project plans, and town checks will be dropped off in Yarmouth. The DEP share of the WPA fee will be certified mailed to the DEP lockbox in Boston. Please let me know if you need any additional information. Thank you! Best, Paul Mancuso Paul Mancuso, WPIT (he/ him) Associate, Wetland Scientist 349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 O: 508-778-8919 / D: 617-896-4587 / C: 781-264-8043 PMancuso@BSCGroup.com