Loading...
HomeMy WebLinkAboutsprinkler system test and inspection 2025A-EEIGETEo SPRINKLER FIRE PROTECTryE SERVICE 350 Main Street .W. Yarmouth, IvfA 02573.(5m) 775-2800 l].'.t,ln$ l)r.\$rion I).\ r..s F.t\:t j08) 77s-96lti SPRINKLER SYSTEM REPORT OF TEST & INSPECTION Name of Premise Address Owner Address REPORT # REPORT DATE Cape Cod Cooperative Bank rel # 508-362-3242 121 Matn Street - Yarmouthport. MA 02675 Cape Cod Cooperative Bank Tel # 508-362-3242 221 \Nillow Street - Yarmouthport, MA 02675 F 47244 ANNUAL TEST & INSPECTION MAY 18,2006 SEMI-QRTLY INSPECTION Owner's Section A. Explain any occupancy hazard changes since the previous inspeciion NONE B. Describe fire proteclion modifications since the last inspec{ion NONE C. Describe any fires since lhe last inspection NONE D. When was the system piping last checked for stoppage, corrosion, or foreign mattef 2002 E. When was the dry piping system last checked for proper pitch? N/A F. Are dry valves adequately protected from freezing? N/A 1.) General A. ls the building occupied? B. Are all systems in service? C. ls there a minimum of 18 in. clearance between the top of the storage and the sprinkler deflector? D. ln areas protected by wet systems, does all of the building appear to be properly heated? E. Does the hand hose on the sprinkler system appear to be satisfactory? F. ls the building completely sprinkled? G. 2" main drain flowed? H. Dry system, low points drained this inspection? l. Alarms tested this inspection? lnspection comments: YES {-T --T--T --T NO N/A THIS IS A WET SYSTEM MONITORED BY INTERCIry ALARMS VIA A DI .{ YES NO N/A 2.)Control Valves A. Are all sprinkler system control valves and all other valves in the appropriate open or closed position? B. Are all control vales in the open positron and locked, sealed, or equipped with a tamper switch? 3.) Water Supplies A. Was a water flow test of the main drain made at the sprinkler riser? 4.1 Tanks.PumDs.Fire D rtment Connections A. Are fire pumps, gravity tanks, reservoirs, and pressure tanks in good condition and properly maintained? B. Are fire department connections in satisfactory condition, couplings free, caps in place, and check valves tight? Are they accessible and visible? 5.)Wet S tems A. Are cold weather valves (O.S. & Y.) in the appropriate open or closed position? B. Have antifreeze system solutions been tested? C. Were the antifreeze test results satisfactory? 6.) Drv Svstems A ls the dry valve in service? B. Are the air pressure and priming water level in accordance with manufactureis instructions? C. Has the operation of the air or nitrogen supply been tested? D. Were low points drained during this inspection? E. Did quick opening devices operate satisfactorily? F. Did the dry valve trip properly during the trip pressure test? G Did the heating equipment in the dry-pipe valve room operate at the time of inspection? I t-T t { I t { { 7.)Special Systems A. Did the deluge or preaction valves operate properly during the last test? B. Did the healresponsive devices operate properly during testing? C. Did the supervisory devices operate during testing? 8.)Alarms A. Did the water motor and gong test satisfactorily? B Did electric alarm test satisfactorily? C. Did supervisory alarm service test satisfactorily? 9.) Sprinklers A. Are all sprinklers free from corrosion, loading, or obstruction to spray discharge? B. Are sprinklers less than 50 years? C. ls stock of spare sprinklers available? D. Does the exlerior condition of the sprinkler system appear to be satisfactorily? E. Are sprinklers of proper temperature ratings for their locations? 10.) Date dry-pipe valve tested (control valve partially open) 11.) Date dry-pipe valve tested (control valve fully open) 12.) Dale quick-opening device tested 13.) Date deluge or preaction valve tested 14.) Review control valve maintenance YES NO N/A N/A N/A N/A N/A YES t {--7----7-- t Trip Test Table DRY VALVE o.o.D. IF NO, EXPLAIN ALARM OPERATEO PROPERLY L DRY PIPE OPERATING TEST DELUGE & PRE. ACTION VALVES N/A IF NO. EXPLAIN NO SEC HYDRAULIC NO NO MAXIMUM TIME TO OPERATE RELEASE N/A Control Valve Maintenance Table Control Valves Number Type Open Secured Closed Explain Abnormal Signs Condition MAKE MODEL SERIAL NO,MAXE MODEL TIME TO TRIP THRU TEST CONNECTION WATER PRESSURE AIR PRESSURE TRIP POINT AIR PRESSURE TIME WATER REACHED TEST OUTLET MIN sEc PSI PSI PSt MIN SEC YES W'THOUT o.o.o. WITH Q.O.D OPERATION PNEUMATIC ELECTRIC PIPING SUPERVISED YES NO DETECTING MEOIA SUPERVISED YES OOES VALVE OPERATE FROM THE MANUAL TRIP ANO/OR REMOTE CONTROL STATIONS YES ISTHERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR TESTING OOES EACH CIRCUIT OPERATE VALVE RELEASE IvtAK E YES MODEL NO DOES EACH C YES NO YES NO MIN II I T City Connection PIV NONE Tank Control Valves NONE Pump Control Valves NONE Sectional Control Valves NONE System Control Valves 2 OS&Y YES YES NO YES NONE Other Control Valves NONE Model Size Type Serial # Backflow Valve WATTS 744 DC 01449 Size Location lnspectors Test Valve Auxiliary Drain Valves 1 NONE SERIA SUPERVISION LOSS ALARM OPERATE Make 4" ATTIC .1 5. ) Water Flow Test at Sprinkler Riser Water supply source City? I Tank? Date Pump? Test Pipe Location Last Flow Test 4-21-05 RTSER 2',65 55 Size Test Pipe Static Pressure Residua I Pressure Current Flow Test 5-18-06 RISER bU 55 16 )Heat Responsive Devices Test Method N/A Type of Equipment Manufacturer Test Results ABCDEFABCDEFA B C DE FA B C DE F Valve No Valve No Valve No Valve No ABCDEFABCDEFA B C DE FA B C DE F Auxiliary Equipment: No?Type?Location?Test Result? NONE 1 8. ) Adjustments or conections made during this inspection 19.)Although these comments are not the result of an engineering review, the following desirable improvements are recommended. NONE lnspector's Name Company Date PAUL CUDDY A & B CANCO MAY 18 2006 2" Valve No. Valve No. Valve No Valve No. 17 ) Explain any "No" answers and comments. REPAIRED WATER MOTOR GONG AND ACCELERATED SYSTEM TO lOO PSI