SPRINKLER SYSTEM REPORT OF TEST & INSPECTION
Name of Premise
Address
Owner
Address
REPORT #
REPORT DATE
Cape Cod Cooperative Bank rel # 508-362-3242
121 Matn Street - Yarmouthport. MA 02675
Cape Cod Cooperative Bank Tel # 508-362-3242
221 \Nillow Street - Yarmouthport, MA 02675
F 47244 ANNUAL TEST & INSPECTION
MAY 18,2006 SEMI-QRTLY INSPECTION
Owner's Section
A. Explain any occupancy hazard changes since the previous inspeciion
NONE
B. Describe fire proteclion modifications since the last inspec{ion
NONE
C. Describe any fires since lhe last inspection
NONE
D. When was the system piping last checked for stoppage, corrosion, or foreign mattef
2002
E. When was the dry piping system last checked for proper pitch?
N/A
F. Are dry valves adequately protected from freezing?
N/A
1.) General
A. ls the building occupied?
B. Are all systems in service?
C. ls there a minimum of 18 in. clearance
between the top of the storage and the sprinkler
deflector?
D. ln areas protected by wet systems, does all
of the building appear to be properly heated?
E. Does the hand hose on the sprinkler system
appear to be satisfactory?
F. ls the building completely sprinkled?
G. 2" main drain flowed?
H. Dry system, low points drained this
inspection?
l. Alarms tested this inspection?
lnspection comments:
YES
{-T
--T--T
--T
NO N/A
THIS IS A WET SYSTEM MONITORED BY INTERCIry ALARMS VIA A DI
.{
YES NO N/A
2.)Control Valves
A. Are all sprinkler system control valves and all
other valves in the appropriate open or closed
position?
B. Are all control vales in the open positron and
locked, sealed, or equipped with a tamper
switch?
3.) Water Supplies
A. Was a water flow test of the main drain made
at the sprinkler riser?
4.1 Tanks.PumDs.Fire D rtment Connections
A. Are fire pumps, gravity tanks, reservoirs, and
pressure tanks in good condition and properly
maintained?
B. Are fire department connections in
satisfactory condition, couplings free, caps in
place, and check valves tight? Are they
accessible and visible?
5.)Wet S tems
A. Are cold weather valves (O.S. & Y.) in the
appropriate open or closed position?
B. Have antifreeze system solutions been
tested?
C. Were the antifreeze test results satisfactory?
6.) Drv Svstems
A ls the dry valve in service?
B. Are the air pressure and priming water level
in accordance with manufactureis instructions?
C. Has the operation of the air or nitrogen
supply been tested?
D. Were low points drained during this
inspection?
E. Did quick opening devices operate
satisfactorily?
F. Did the dry valve trip properly during the trip
pressure test?
G Did the heating equipment in the dry-pipe
valve room operate at the time of inspection?
I
t-T
t
{
I
t
{
{
7.)Special Systems
A. Did the deluge or preaction valves operate
properly during the last test?
B. Did the healresponsive devices operate
properly during testing?
C. Did the supervisory devices operate during
testing?
8.)Alarms
A. Did the water motor and gong test
satisfactorily?
B Did electric alarm test satisfactorily?
C. Did supervisory alarm service test
satisfactorily?
9.) Sprinklers
A. Are all sprinklers free from corrosion,
loading, or obstruction to spray discharge?
B. Are sprinklers less than 50 years?
C. ls stock of spare sprinklers available?
D. Does the exlerior condition of the sprinkler
system appear to be satisfactorily?
E. Are sprinklers of proper temperature ratings
for their locations?
10.) Date dry-pipe valve tested (control valve partially open)
11.) Date dry-pipe valve tested (control valve fully open)
12.) Dale quick-opening device tested
13.) Date deluge or preaction valve tested
14.) Review control valve maintenance
YES NO N/A
N/A
N/A
N/A
N/A
YES
t
{--7----7--
t
Trip Test Table
DRY VALVE o.o.D.
IF NO, EXPLAIN
ALARM
OPERATEO
PROPERLY
L
DRY PIPE
OPERATING
TEST
DELUGE
& PRE.
ACTION
VALVES
N/A IF NO. EXPLAIN
NO
SEC
HYDRAULIC
NO
NO
MAXIMUM TIME
TO OPERATE
RELEASE
N/A
Control Valve Maintenance Table
Control Valves Number Type Open Secured Closed
Explain
Abnormal
Signs Condition
MAKE MODEL SERIAL NO,MAXE MODEL
TIME TO TRIP
THRU TEST
CONNECTION
WATER
PRESSURE
AIR
PRESSURE
TRIP POINT
AIR
PRESSURE
TIME
WATER
REACHED
TEST
OUTLET
MIN sEc PSI PSI PSt MIN SEC YES
W'THOUT
o.o.o.
WITH
Q.O.D
OPERATION PNEUMATIC ELECTRIC
PIPING SUPERVISED YES NO DETECTING MEOIA SUPERVISED YES
OOES VALVE OPERATE FROM THE MANUAL TRIP ANO/OR REMOTE CONTROL
STATIONS
YES
ISTHERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR TESTING
OOES EACH
CIRCUIT OPERATE
VALVE RELEASE
IvtAK E
YES
MODEL
NO
DOES EACH C
YES NO YES NO MIN
II I
T
City Connection
PIV NONE
Tank Control
Valves NONE
Pump Control
Valves NONE
Sectional
Control Valves NONE
System Control
Valves 2 OS&Y YES YES NO YES NONE
Other Control
Valves NONE
Model Size Type Serial #
Backflow Valve WATTS 744 DC 01449
Size Location
lnspectors Test
Valve
Auxiliary Drain
Valves
1
NONE
SERIA
SUPERVISION LOSS ALARM
OPERATE
Make
4"
ATTIC
.1 5. ) Water Flow Test at Sprinkler Riser
Water supply source City? I Tank?
Date
Pump?
Test Pipe
Location
Last Flow Test 4-21-05 RTSER 2',65 55
Size
Test Pipe
Static
Pressure
Residua I
Pressure
Current Flow Test 5-18-06 RISER bU 55
16 )Heat Responsive Devices
Test Method N/A
Type of Equipment
Manufacturer
Test Results
ABCDEFABCDEFA B C DE FA B C DE F
Valve No
Valve No
Valve No
Valve No
ABCDEFABCDEFA B C DE FA B C DE F
Auxiliary Equipment: No?Type?Location?Test Result?
NONE
1 8. ) Adjustments or conections made during this inspection
19.)Although these comments are not the result of an engineering review, the
following desirable improvements are recommended.
NONE
lnspector's Name
Company
Date
PAUL CUDDY
A & B CANCO
MAY 18 2006
2"
Valve No.
Valve No.
Valve No
Valve No.
17 ) Explain any "No" answers and comments.
REPAIRED WATER MOTOR GONG AND ACCELERATED SYSTEM TO lOO PSI