HomeMy WebLinkAboutCCOR 05-27-2026 792-144Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:5/27/2026 Client:Wright-Pierce Client Rep:Rayssa FonteWeather:Clear 57 - 62°F S.W.COLE Rep:Alexander Charnitsky General Contractor:Nickerson Time Onsite:06:30 - 08:00Placement Type: Footing  Wall  Slab  Other Placement Location:SBR Wall 1, Western Columns Concrete Placement Observations Observed Comments Required mix used Yes 3/4 Aggregate, 4500psi Concrete Mix, Sika Mid- Range Concrete properly conveyed to all areas of placement Yes Pump Truck Internal vibration / consolidation of concrete Yes Handheld vibrator Even layering around openings and embedments Yes Concrete evenly layered and vibrated around openings and embedments Post placement observations (finishing, curing, etc.)Yes Concrete Manually Finished Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-144  *Refer to associated concrete test report Notes: As requested by Wright‑Pierce, S.W.COLE rep was onsite to perform concrete testing and sampling at the locations referenced above. The S.W.COLE representative arrived onsite at approximately 6:30 AM. One concrete delivery (Load 1) arrived onsite consisting of approximately 5 cubic yards of 4,500‑psi concrete with a 3/4‑inch nominal maximum aggregate. The concrete contained Sika® 75 air‑entraining admixture and was placed using a pump truck. Concrete placement operations were observed only as necessary to perform the requested testing. Field Testing One set of field tests was performed on Load 1 (Truck No. 75) with the following results: Slump: 8.5 inches Air Content: 4.1 percent Concrete Temperature: 75°F Test Specimens One set of compression test cylinders was cast for laboratory testing, including specimens for 7‑day, 14‑day, and 28‑day compressive strength testing (two cylinders), along with one hold cylinder. Test results and observations were verbally communicated onsite to Rayssa Fonte, Wright‑Pierce representative, at the time of testing. Upon completion of testing activities, the S.W.COLE representative gathered testing equipment and departed the site at approximately 9:00 AM. Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Attachments: 1 Photos Reviewed by:5/29/2026 Kaylie OSuivKaylie OSullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com SBR Wall 2