Loading...
HomeMy WebLinkAboutNarrative 6.3.2026Down Cape Engineering, Inc. PROJECT NARRATIVE Notice of Intent #681 Route 28 West Yarmouth, MA Project Introduction The applicant respectfully submits this Notice of Intent application in support of the construction of a stone revetment along the shoreline of Parker's River at 681 Route 28. The subject property is an approximately 2.2-acre parcel located within a commercial zoning district. The site is currently developed with a restaurant and fish market, originally constructed in 1966 and 1945, respectively, per the Town Assessor's records. The property falls entirely within Land Subject to Coastal Storm Flowage (AE el. 11), (AE el. 12), and (AE el. 13), within the Limit of Moderate Wave Action. It should be noted that no work is proposed within any areas mapped as Priority Habitat or Estimated Habitat for Endangered Species by the Massachusetts Natural Heritage and Endangered Species Program (NHESP). A Coastal Bank exists along the top of the existing stone revetment. The property abuts Parker's River along its eastern portion, with the proposed work taking place within Parker's River and its 100-foot Inner Riparian Zone. The regulatory and permitting history for the site is summarized as follows. The existing stone revetment was licensed in 1991 under License No. 2647 and is recorded at the Barnstable Registry of Deeds in Deed Book 7567 Page 261. In May 2011, Coastal Engineering Co., Inc. filed a Notice of Intent for approximately 60 linear feet of revetment repairs to the northern portion of the structure; that work was subsequently completed under the issued Order of Conditions. In July 2022, Coastal Engineering Co., Inc. filed a Request for Determination of Applicability in connection with an emergency repair to the southern revetment section, which was followed by a Notice of Intent filing in September 2022 to formally authorize the completed emergency work. During the intervening period, the unprotected shoreline segment between the northern and southern revetment sections continued to erode, resulting in the partial loss of the existing asphalt parking surface. In October 2023, Coastal Engineering Co., Inc. filed a Notice of Intent proposing a sheet pile wall seaward of the eroding section; however, that structure was never installed. The present filing proposes a redesigned approach to address the ongoing erosion along this segment of shoreline Proposed Work The proposed work consists of the construction of a stone revetment along an approximately 40-linear-foot section of unprotected shoreline that has deteriorated as a result of ongoing tidal scouring. The proposed revetment will be constructed using armor stone and bedding stone of varying sizes, placed at a slope of 1.25H:1 V to Page 1 of 5 Down Cape Engineering, Inc. effectively absorb wave energy and provide long-term stability. Toe stones will be embedded approximately five feet below existing grade to provide resistance against future scour undermining. The proposed revetment will connect to and be generally consistent in extent and elevation with the two existing licensed revetment sections immediately to the north and south. Portions of the proposed revetment will extend past the mean low water line, with portions being placed within Parker's River. The proposed alignment generally follows the existing revetment footprint, with minor variations to accommodate the transition between existing sections and the more gradual slope. The proposed work is not anticipated to obstruct navigation within Parker's River, as the existing revetment structures to the north and south already define the shoreline configuration in this area. Incidental erosion of the existing asphalt parking surface into Parker's River has occurred as a result of the unprotected shoreline condition. Upon completion of the proposed revetment, the disturbed parking area will be restored to its pre -erosion condition. Native coastal vegetation tolerant of salt spray will be planted along the top of the revetment. A code -compliant safety fence will be installed between the restored parking area and the vegetated strip. 310 CMR 10.25 Land Under the Ocean & Town of Yarmouth Wetland Protection Regulations §4.01 The proposed stone revetment will extend past the mean low water line, placing portions of the work within Land Under the Ocean as defined under 310 CMR 10.25. No dredging is proposed as part of this project. Armor and bedding stones will be placed at and below existing grade to accommodate anticipated scour, The existing grade below the mean low water line will be disturbed during construction but will not be permanently altered or raised. The proposed revetment is not anticipated to adversely affect water circulation within Parker's River. On the contrary, by filling the depression created by the loss of shoreline protection, the revetment is expected to restore more uniform flow patterns and reduce localized turbulence currently associated with the scoured low point. The project area falls outside of MassDEP's mapped eelgrass beds. The placement of natural armor and bedding stone will not alter the grain size distribution of existing sediments, and no adverse impact to water quality is anticipated from the use of these natural materials. The Division of Marine Fisheries (DMF) has identified Parker's River as a winter flounder spawning habitat, thereby designating this area as a Habitat of Particular Concern. In accordance with this designation, all in -water construction activities will be restricted to the approved construction window and will not take place between January 15 and June 15 of any year. The project is not within any areas mapped as Priority Habitat or Estimated Habitat for Endangered Species by the Massachusetts Natural Heritage and Endangered Species Program (NHESP). Page 2 of 5 Down Cape Engineering, Inc. 310 CMR 10.30 Coastal Banks & Town of Yarmouth Wetland Protection Regulations K05 A Coastal Bank is present along the top of the existing stone revetment, delineated in accordance with MassDEP Policy 92-1. The proposed project will impact approximately 40 linear feet of Coastal Bank. The existing revetment was originally licensed in 1991 and, as an armored structure, does not function as an active sediment source. The proposed project will not adversely affect the shoreline, as the work is confined to filling the actively eroding gap between two existing licensed revetment sections. Flood control capacity will remain unaltered, and the completed revetment will provide enhanced protection to existing structures situated landward of the proposed work. Section 4.05(3)(a) of the Town of Yarmouth Wetland Protection Regulations prohibits the construction of new bulkheads, revetments, seawalls, groins, or other coastal engineering structures along a Coastal Bank. The Applicant acknowledges that the proposed structure constitutes a new revetment section; however, the prohibition under §4.05(3)(a) is understood to be intended to protect Coastal Banks that function as active sources of sediment to the littoral system. The Coastal Bank at this location has been fully armored since 1991 and provides no sediment supply function. Additionally, the existing restaurant and fish market located on the parcel were both constructed prior to August 10, 1978, meeting the requirements for new construction. 310 CMR 10.34 Land Containinst Shellfish & Town of Yarmouth Wetland Protection Regulations 44.08 A letter issued by the Division of Marine Fisheries in connection with the October 2023 Notice of Intent filing confirmed that the project site falls within mapped shellfish habitat supporting bay scallop, blue mussel, softshell clam, and northern quahog. The proposed work will result in temporary disturbance of the substrate during construction. Because no dredging is proposed, the shellfish habitat is expected to recover and return substantially to its former productivity upon completion of construction, consistent with the performance standards of 310 CMR 10.34(5). As discussed under the previous section for Land Under the Sea, the proposed revetment is not expected to negatively affect water circulation. The placement of natural stone materials will not alter sediment grain size distribution, and no water quality impacts are anticipated. The project area is not located within an Area of Critical Environmental Concern (ACEC). 310 CMR 10.58 Riverfront Area Parker's River, a tidally influenced saltwater river, flows along the eastern boundary of the subject property. The property falls within both the 100-foot Inner Riparian Zone and the 200-foot Outer Riparian Zone of the Riverfront Area. Two existing revetment sections, originally licensed in 1991 under License No. 2647, occupy the shoreline to Page 3 of 5 Down Cape Engineering, Inc. the north and south of the proposed work area. The proposed revetment is generally consistent in horizontal extent with the existing licensed structures. An alternatives analysis addressing the requirements of 310 CMR 10.58(4) is provided as part of this narrative. Land Subject to Coastal Storm Flowage & Town of Yarmouth Wetland Protection Regulations K10 The property is located entirely within Land Subject to Coastal Storm Flowage (AE el. 11), (AE el. 12), and (AE el. 13) within the Limit of Moderate Wave Action. All the proposed work will take place outside of the Limit of Moderate Wave Action. The proposed stone revetment will require the placement of fill to match the grade of the adjacent existing revetment sections and to restore the eroded shoreline to a stable condition. Approximately 42 cubic yards of fill is associated with the proposed work. No significant alteration of existing upland site grades is proposed beyond that directly associated with the revetment footprint. Based on the proposed design, no adverse impacts to flood storage or flood conveyance capacity are anticipated during storm or flood events. Construction Protocol All construction equipment and materials will access the work area through the existing paved roadway utilizing the paved parking lot. Prior to commencement of any site work, a pre -construction meeting shall be arranged to include the responsible contractor and Conservation Administrator. The construction sequence will proceed as follows: (1) Staging of equipment and materials shall take place within the designated staging area; (2) Construction of the stone revetment, including placement of bedding stone and armor stone; (3) Restoration of the asphalt parking lot to its previous condition; and (4) final site stabilization to include coastal vegetation and a code -compliant safety fence. Alternatives Analysis In accordance with the performance standards of 310 CMR 10.58(4)(b), an alternatives analysis has been conducted to evaluate feasible options for stabilizing the eroding shoreline segment at 681 Route 28. The following alternatives were considered: Alternative 1: No Action Under the no -action alternative, the approximately 40-foot gap in the existing revetment would remain unprotected. Continued tidal scouring would be expected to accelerate the erosion of the exposed shoreline and the adjacent parking surface, with ongoing loss of fill material into Parker's River. This alternative would not halt the erosion of the asphalt parking lot into the waterway and would leave the existing licensed revetment Page 4 of 5 Down Cape Engineering, Inc. sections vulnerable to failure as the unprotected gap continues to widen. The no -action alternative is not considered feasible given the ongoing adverse impacts to both the resource area and the existing commercial infrastructure. Alternative 2: Soft Shoreline Stabilization Soft stabilization techniques, such as coir logs, were evaluated as a potential alternative to hard armoring. However, given the intensity of the tidal and wave energy at this location, as evidenced by the progressive scouring that has occurred despite the presence of the adjacent revetment sections, it has established that vegetative or biodegradable stabilization measures are not expected to provide adequate long-term protection at the proposed work location. Soft stabilization is best suited to low -energy shoreline environments and is not considered a feasible primary stabilization strategy at this site. Alternative 3: Stone Revetment (Proposed) The proposed stone revetment represents the preferred alternative and is consistent in type, extent, and function with the existing licensed revetment sections to the north and south. The use of armor stone at a 1.25H:1 V slope with embedded toe protection is appropriate for the energy environment of this shoreline and has been demonstrated to be effective at this specific location. This alternative minimizes impacts to the Riverfront Area and other resource areas by limiting the work footprint to the 40-foot gap between existing structures, rather than proposing new or expanded armoring beyond the existing licensed extent. For these reasons, the proposed stone revetment is identified as the least environmentally damaging practicable alternative that will achieve the necessary shoreline stabilization objective. Page 5 of 5