Loading...
HomeMy WebLinkAboutApproved Planting Plan 6.5.2026# 891/ / Z �n- LANDING DECK RE -FITTED SHRUB THICKET I I UPLAND #911 EX. LANDING DECK RE -FITTED APPROX. EDGE OF VEGETATION AT TOP OF SCARP -------------- S - APPROX. 4 FT:---W RK ZONE S TO BE MARGINALLY PRUNED FOR WORK ACCESS 0 D° o o 000 0 000°° 0 00� o °°° o 0 0° C ° 0 ° 0 0 0 0 ---- ---- S o 00 °o oho ° 00 0 0 0 )000 > oSo00000 0 o�oXoo 0 000 0 0 00 oo o° O S ° o o 0 8 �0 00 0 ®o o 00 00 00 o 0 0 0 0 0 ° 0 0 S c 0(� o o o o oo °o°o 00 8000 0 0 0 0 o 0 0 0 0 0 0 ° �000 ) 00000 0O 00 0 � 0 0 0 0 0 000000 0 00 000000 NEW STONE REVETMENT&", —EX. ACCE RoUlINE �SANo F,« ZONE COASTAL BEACH MHW------ UPIm n ------------ ___ __ ---- S -------------- ---------------- S APPROX. 4 FT. WORK ZONE TO BE PRUNED FOR WORK ACCESS S S 00 ° ° 000 ° °° ° ° ° ° oho o ° o o °- °9-1 0s NEW � EX. ACCESS STEPS TO BE RE -FITTED MHW = 1.3 PLAN 10 5 0 10 1 inch = 10 ft. STONE 30 COASTAL SHRUB THICKET ------------ 911 ROX. -- ®o 00 °o0 0 oDGE OF vE -�-�---�_�- 0 TA TIO oN 0 0 0 Or, SCARP REVETMENT BEACH PROPOSED TOE STONES 0 EL__ 3 (BURIED) L PLANT SPECIFICATION I.ICV kA A D NU OUALC YARMOUTH, MA I THE AFFECTED AREAS ALONG THE REVETMENT CAP ARE SUBJECT TO FOOT TRAFFIC DURING THE WORK EFFORT AND SHALL BE EVALUATED PRIOR TO INITIATING PLANTING. PRUNING OF THE 4 FT. STRIP INDICATED, LANDWARD OF THE EROSDED CREST SHALL BE LIMITED FOR ACCESS ONLY WITH NO ROOT REMOVAL. THE EXISTING THICKET IS ANTICIPATED TO RECOVER. THE AREA SHALL BE EVALUATED POST CONSTRUCTION TO EVLAUATE THE AREA FOR CHANGES / ADDITIONS TO THE PLANTINGS. LOCATION: THE NARROW SLOPE RELATED TO REVETMENT WORK IN AREAS OF OBSERVED NEED ALONG THE NEW REVETMENT TOP: • PROVIDE AMERICAN BEACHGRASS CULMS (Ammophila brevilagulata) PLANTED AT 12 IN. SPACING, 2 CULMS PER HOLE THROUGHOUT THE ENTIRE CAP AREA STRIP. PROVIDE APPROX. 30 SEASIDE GOLDENROD (Solidago sempervirons) 4 INCH POTTED RANDOMLY DISTRIBUTED ALONG THE BEACH GRASS CAP ZONE. ACCESS ROUTE : • THE ACCESS ZONE SHALL BE OVER -SEEDED WITH A QUALIFIED SEED MIX: NEW ENGLAND EROSION CONTROL / RESTORATION MIX AS SUPPLIED BY NEW ENGLAND WETLAND PLANTS, HADLEY, MA OR EQUAL AT THE APPRIOPRIATE TIME OF YEAR. REPEATED AS NECESSARY. • SHRUBS - PROVIDE 3 GAL. SIZE, BEACH PLUM ( Prunus maritima) IN GROUPS AT APPROX. 4 FT. SPACING WHERE INDICATED 1. PROVIDE SOIL AMENDMENTS AS NECESSARY. PLANT STOCK SHALL BE INSTALLED IN CONFORMANCE WITH STANDARD NURSERYMEN'S PRACTICE. PROVIDE WATERING AT REGULAR INTERVALS DURING THE FIRST GROWING SEASON. IRRIGATION SHALL BE TEMPORARY ONLY AND BE REGULATED TO BE AS NEEDED #921 DURING THE SUMMER SEASON. 2. CONTACT YARMOUTH CONSERVATION AUTHORITY FOR VARIATION ON WATERING OR PLANT SPECIES SUBSTITUTIONS 3. THE PLANT ZONE SHALL BE INSPECTED WHEN STONEWORK IS COMPLETED TO ° 00 ° EVALUATE THE NEED FOR ADDITIONAL PLANT STOCK. §�L° ° LEGEND \° o m EDGE OF REVETMENT 0 ° o ° ° 00 0 QF o PROP. BEACH GRASS ZONE 0 S 0 ° 00 000Rp 00 S PROP. 3 GAL BEACH PLUM ( SEE 0 NOTES) (90 0 0 c PLANTING PLAN FOR STONE REVETMENT ROUTINE SAN SE83-2529 F ZONE 911 GREAT ISLAND ROAD WEST YARMOUTH, MA ASSESSORS MAP 3, PARCEL 3 JUNE 5, 2026 SCALE — AS NOTED PREPARED BY CAPE COD ENGINEERING, INC. ROBERT M. PERRY, PE P.O. BOX 1517 EAST DENNIS, MA 02641 TEL - 508-385-1445