Loading...
HomeMy WebLinkAboutNHESP comment 4.14.2026 (2)24-18473NHESP No.Page 4 of 4 Issued April 14, 2026 List of Conditions Applicant: Dewey J & Margaret Awad, Dewey J Awad 2007 Irrevocable Family Trust Project Location: 911 & 921 Great Island Road Project Description: Construction of a stone revetment, sand nourishment, debris removal NHESP File No.: 24-18473 Heritage Hub Form ID: RC-98437 Approved Plan: Proposed Stone Revetment Bank Stabilization Plan date: 2-2-2026, one sheet, prepared by Cape Cod Engineering, INC Revised Date: N/A To avoid adverse effects to the Resource Area Habitats and to avoid a prohibited Take of state-listed species, the following condition(s) must be met: 1.Time of Year Restriction: To avoid impacts to state-listed species and their habitats, all Work associated with the removal of the coir system, construction of the revetment and sand nourishment, shall not be conducted during the period April 1 – August 31. 2.State-listed Species Protection: The applicant has the responsibility of protecting state-listed shorebird species (piping plovers and or terns) that may occur on this property. Therefore, it is recommended that the applicant engage a qualified shorebird monitor to conduct regular monitoring for the presence of these state-listed species during the period April 1 – August 31 and protect any nests, scrapes, or unfledged chicks with symbolic fencing (warning signs and twine fencing). 3.Nourishment: As proposed, the Applicant shall provide annual compensatory sand nourishment. a. Immediately upon completion of the revetment construction, an initial deposition of ±110 cubic yards (CY) of compatible sand shall be distributed overtop the revetment and/or upon the coastal beach. This volume shall be in addition to the sand excavated for the installation of the system. b. Thereafter, the Applicant is responsible to place ±40 cubic yards of compatible sand nourishment annually. The Applicant is required to demonstrate compliance with delivery slips or receipts . c. All nourishment must avoid the shorebird nesting period; therefore, sand shall not be deposited during April 1 – August 31, unless otherwise approved in writing by the Division. 4.Authorization Duration: This authorization is valid for 5 years from the date of issuance. Work may be completed at any time during this 5-year period in compliance with the conditions herein. Thereafter, the Applicant must re-file pursuant to the MESA. 5.Wetlands Protection Act, Notice: Upon filing for renewal, extension, or amendment of the Orders of Conditions, the Applicant shall contact the Division for written response regarding impacts to Resource Area habitat of state-listed wildlife.