HomeMy WebLinkAboutCCOR 06-09-2026 792-151Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:6/9/2026 Client:Wright-Pierce Client Rep:Rayssa FonteWeather:Clear 60 - 80°F S.W.COLE Rep:Riley Nordahl General Contractor:Nickerson Time Onsite:08:40 - 10:30 Placement Type: Footing  Wall  Slab  OtherPlacement Location:Middle vehicle storage exterior apron Concrete Placement Observations Observed Comments Required mix used Yes 4500 PSI,3/4, Sika Control 75 Concrete properly conveyed to all areas of placement Yes Directly from truck Internal vibration / consolidation of concrete Yes Use of an external vibrator Even layering around openings and embedments Yes Concrete evenly layered and vibrated around openings and embedments Post placement observations (finishing, curing, etc.)Yes Concrete Manually Finished Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-151  *Refer to associated concrete test report Notes: As requested by Rayssa (CDM Smith), S.W.COLE rep was onsite to perform construction observation, including concrete sampling and testing, during concrete placement operations. S.W.COLE rep arrived onsite at approximately 8:45 AM. Concrete placement operations were ongoing during the observation period. Concrete Delivery No. 1 arrived onsite with approximately 6 cubic yards of 4,500-psi concrete with 1-1/2-inch aggregate. Sika Control 75 admixture was reportedly added prior to placement. The concrete was placed directly from the concrete truck. One set of field tests was performed with the following results: Truck 62 – Load 1: Slump: 7 inches Air Content: 5% Concrete Temperature: 75°F One set of compressive strength test cylinders was cast for laboratory testing at 7-, 14-, and 28-day intervals (two cylinders per test age), along with one hold cylinder. Laboratory test results will be reported separately upon completion. Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Test results and field observations were verbally reported to Rayssa (CDM Smith) while onsite. S.W.COLE rep departed the site at approximately 10:30 AM upon completion of the requested services. Attachments: 2 Photos Reviewed by:6/10/2026 Kaylie O'SuivKaylie O'Sullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com