HomeMy WebLinkAboutCCOR 06-16-2026 792-152 to 792-153Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:6/16/2026 Client:Wright-Pierce Client Rep:Rayssa FonteWeather:Clear 67 - 68°F S.W.COLE Rep:Alexander Charnitsky General Contractor:Nickerson Time Onsite:06:40 - 12:15Placement Type: Footing  Wall  Slab  Other: Column Placement Location:Process Building Walls 4 & 25, SVR 2 Columns Concrete Placement Observations Observed Comments Required mix used Yes 4500psi, 1 1/2", 3/4", Sika 75 Concrete properly conveyed to all areas of placement Yes Pump Truck Internal vibration / consolidation of concrete Yes Handheld vibrator Even layering around openings and embedments Yes Concrete evenly layered and vibrated around openings and embedments Post placement observations (finishing, curing, etc.)Yes Concrete Manually Finished Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-152 to 792-153  *Refer to associated concrete test report Notes: Attachments: 3 Photos Reviewed by:6/17/2026 Kaylie O'SuivKaylie O'Sullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com