HomeMy WebLinkAboutCCOR 06-16-2026 792-152 to 792-153Concrete Construction Observation Report
The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control.
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com
Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:6/16/2026
Client:Wright-Pierce Client Rep:Rayssa FonteWeather:Clear 67 - 68°F S.W.COLE Rep:Alexander
Charnitsky
General Contractor:Nickerson Time Onsite:06:40 - 12:15Placement Type: Footing Wall Slab Other: Column
Placement Location:Process Building Walls 4 & 25, SVR 2 Columns
Concrete Placement Observations Observed Comments
Required mix used Yes 4500psi, 1 1/2", 3/4", Sika 75
Concrete properly conveyed to all areas of placement Yes Pump Truck
Internal vibration / consolidation of concrete Yes Handheld vibrator
Even layering around openings and embedments Yes Concrete evenly layered and vibrated around
openings and embedments
Post placement observations (finishing, curing, etc.)Yes Concrete Manually Finished
Field Testing of Concrete performed:Yes
*CYLINDER SET NO:792-152 to 792-153 *Refer to associated concrete test report
Notes:
Attachments: 3 Photos Reviewed by:6/17/2026 Kaylie O'Su iv Kaylie O'Sullivan
Concrete Construction Observation Report
The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control.
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com
Concrete Construction Observation Report
The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control.
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com