Loading...
HomeMy WebLinkAbout792-792-15658 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:6/18/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 6/16/2026 Time Cast: 11:53 AM Date Received: 6/17/2026 Placement Location:SBR/PROCESS BUILDING WALLS Placement Method:PUMP Cylinders Made By:Alexander Charnitsky Material Type:Concrete Cylinders Placement Vol. (yd ):108 Aggregate Size (in):3/4 Cylinder Size:4" x 8" INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:SIKA 75 TEST RESULTS Slump (in) (C-143):8 1/2 Air Content (%) (C-231):3.5 Air Temp (°F):68 Conc. Temp (°F) (C-1064):72 Load Number:1 Mixer Num.:69 Ticket Num.:52443 Cubic Yards:10 Design (psi):4500 Batch 10:52 AM Arrive 11:40 AM Depart 12:00 PM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-156A N 8.4 3.98 12.41 6/18/2026 Lab Unbonded 2 5 45.42 3650 792-156B 8.35 6/30/2026 Lab 14 792-156C 8.45 7/14/2026 Lab 28 792-156D 8.4 7/14/2026 Lab 28 792-156E 8.45 7/14/2026 Lab 28 792-156F 8.4 HOLD Lab 3 2 Remarks:Kaylie O'Sullivan Reviewed By