Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
792-792-154
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:6/19/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 6/12/2026 Time Cast: 11:10 AM Date Received: 6/13/2026 Placement Location:SBR 56 & 69 Placement Method:PUMP Cylinders Made By:Alexander Charnitsky Material Type:Concrete Cylinders Placement Vol. (yd ):83 Aggregate Size (in):3/4 Cylinder Size:4" x 8" INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:SIKA TEST RESULTS Slump (in) (C-143):6 1/2 Air Content (%) (C-231):3.2 Air Temp (°F):71 Conc. Temp (°F) (C-1064):79 Load Number:1 Mixer Num.:67 Ticket Num.:82382 Cubic Yards:10 Design (psi):4500 Batch 10:17 AM Arrive 11:00 AM Depart 11:15 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-154A N 8.55 3.99 12.47 6/15/2026 Lab Unbonded 3 5 57.15 4570 792-154B N 8.4 4 12.60 6/19/2026 Lab Unbonded 7 5 62.05 4940 792-154C 8.55 6/26/2026 Lab 14 792-154D 8.5 7/10/2026 Lab 28 792-154E 8.5 7/10/2026 Lab 28 792-154F 8.5 HOLD Lab 3 2 Remarks:Kaylie O'Sullivan Reviewed By