Loading...
HomeMy WebLinkAbout792-792-15858 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:6/25/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 6/18/2026 Time Cast: 7:45 AM Date Received: 6/19/2026 Placement Location:SBR SLABS (38, 31, 41, 50) Placement Method:PUMP Cylinders Made By:Riley Nordahl Material Type:Concrete Cylinders Placement Vol. (yd ):330 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:SIKA CONTROL 75 TEST RESULTS Slump (in) (C-143):8 Air Content (%) (C-231):3 Air Temp (°F):69 Conc. Temp (°F) (C-1064):70 Load Number:13 Mixer Num.:65 Ticket Num.:36112 Cubic Yards:143 Design (psi):4500 Batch 7:40 AM Arrive 7:45 AM Depart 8:05 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-158A N 29.4 6 28.27 6/25/2026 Lab Unbonded 7 5 117.6 4160 792-158B 29.4 7/2/2026 Lab 14 792-158C 29.05 7/16/2026 Lab 28 792-158D 29.05 7/16/2026 Lab 28 792-158E 29.35 7/16/2026 Lab 28 792-158F 29.4 HOLD Lab 3 2 Remarks:Kaylie O'Sullivan Reviewed By