HomeMy WebLinkAboutCCOR 06-25-2026 792-161 to 792-162Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:6/25/2026 Client:Wright-Pierce Client Rep:Rayssa FonteWeather:Clear 60 - 80°F S.W.COLE Rep:Riley Nordahl General Contractor:Nickerson Time Onsite:06:20 - 14:05 Placement Type: Footing  Wall  Slab  OtherPlacement Location:SBR Walls on Slab 13. Pipe galley walls on Slab 4 Two SW columns in SBR #2-10 Concrete Placement Observations Observed Comments Required mix used Yes 4500psi, 1 1/2", 3/4", Sika 75 Concrete properly conveyed to all areas of placement Yes Pump truck was used Internal vibration / consolidation of concrete Yes Vibrator was used for the consolidation of concrete Even layering around openings and embedments Yes Concrete was evenly layered around openings and embedments Post placement observations (finishing, curing, etc.)Yes Concrete was finished manually Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-161 to 792-162  *Refer to associated concrete test report Notes: As requested by Rayssa, S.W.COLE rep. was onsite to perform construction observation services, including concrete sampling and testing, during placement operations at the project site. The S.W.COLE rep. arrived onsite at approximately 6:20 AM and departed at approximately 2:10 PM after completing the requested observation, sampling, and testing services. Concrete placement operations were ongoing during the time the S.W.COLE rep. was onsite performing services. Concrete Delivery No. 1 Concrete Delivery No. 1 arrived onsite consisting of approximately 11 cubic yards of 4,500-psi concrete with 1-1/2-inch aggregate. Sika 75 admixture was reported to have been added prior to placement. The concrete was placed via pump truck. One sets of field tests were performed on sampled concrete with the following results: Truck 51 – Load 2 Slump: 8 inches Air Content: 3.0 percent Concrete Temperature: 75°F One set of compression test cylinders were cast for laboratory testing at 7, 14, and 28 days (two cylinders per test age), along with one hold cylinder. Laboratory compressive strength test results will be reported separately upon completion of testing. Concrete Delivery No. 2 Concrete Delivery No. 2 arrived onsite consisting of approximately 11 cubic yards of 4,500-psi concrete with 3/4-inch aggregate. Sika 75 admixture was reported to have been added prior to placement. The concrete was placed via pump truck. One set of field tests was performed on sampled concrete with the following results: Truck 64 – Load 1 Slump: 8 inches Air Content: 4.0 percent Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Concrete Temperature: 75°F One set of compression test cylinders was cast for laboratory testing at 4, 7, 14, and 28 days (three cylinders per test age), along with one hold cylinder. Laboratory compressive strength test results will be reported separately upon completion of testing. Test results and observations were verbally reported to Rayssa, CDM Smith, while onsite Attachments: 4 Photos Reviewed by:6/28/2026 Kaylie OSuivKaylie OSullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com