Loading...
HomeMy WebLinkAboutCOC request 6.26.2026 BSC GROUP LI Engineers BUILD SUPPORT CONNECT Environmental Scientists Software Developers Landscape Architects Planners Surveyors 20 Perch Pond Way, Yarmouth Port Request for Certificate of Compliance Construction of Single-Family Home Town of Yarmouth Conservation Commission June 2026 Yarmouth Conservation Commission JUN 2 0 2026 RECEIVED f ?(Vv-ed Prepared for: Joesph Lapriore 20 Perch Pond Way Yarmouth Port, MA 02675 SC Job#0102670.00 349 Main Street,Route 28,Unit D West Yarmouth,MA 02673 508-778-8919 BSC GROUP Engineers BUILD SUPPORT CONNECT Environmental Scientists Software Developers Landscape Architects Planners Surveyors JUNE 19,2026 www.bscgroup.com Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 Attn: Brittany DiRienzo, Conservation Administrator RE: Request for Certificate of Compliance, OOC SE83-1390, Construction of Single-Family Home, 20 Perch Pond Way,Yarmouth Port, MA, BSC Job#102670.00 Dear Yarmouth Conservation Commissioners, BSC Group, Inc. (BSC) is filing this Request for a Certificate of Compliance (RCOC)on behalf of the Joseph Lapriore (the applicant) for the project at 20 Perch Pond Way in Yarmouth Port, Massachusetts (the Site). The Order of Conditions(OOC SE83-1390)was issued on February 20'h, 1997 and referenced a plan titled "Site&Sewage Plan of Lot 6, Perch Pond Way, Yarmouth Port, MA" with a final revision date of 2/20/1997. The approved project was to construct a single-family home.The OOC does not require the submission of an As-Built plan with the RCOC and does not require any mitigation plantings. BSC completed an existing conditions survey of the property on April 8'h, 2026, and can confirm that the single-family home was constructed in compliance with the OOC. The single-family home is located slightly landward from the location where it was proposed;i.e.further from the wetland resource area.The only other deviations from the approved plan are that there is a small paver patio behind the house, an outdoor rinse station attached to the back of the house, and a small block retaining wall along the backside of the driveway. These three features are all located near the limit of the 100' buffer zone and since the house itself was constructed landward of the approved location, the total buffer zone impacts on Site are similar to what was approved. See the attached plan overlaying the proposed plan with the existing conditions plan to see that the house is located further landward than was proposed as well as the other minor deviations. All general and special conditions listed in the OOC have been followed including Special Condition #7 which requires that gutters and downspouts are directed into drywells. This application is being submitted in accordance with the Massachusetts Wetlands Protection Act and the Town of Yarmouth Wetlands Protection By-law. If you have any questions or need additional information, please contact our office at 508-778-8919 or by email at PMancusoABSCGroup.com or MCreighton@BSCGroup.com. Sincerely, BSC Group, Inc. ier n Healy, P CF Senior Associa e, Survey Manager cc: MassDEP, Southeast Regional Office Joseph Lapriore,20 Perch Pond Way, Yarmouth Port, MA 02675 349 Main Street,Route 28,Unit D West Yarmouth,MA 02673 508-778-8919 1� of � _ i`� - , C` CONSERVATION t,O-- `�� ''3- act ,mittiz tAzittitte OFFICE ‹*-C°RPORAiEobyY� � fiance /�� � Q (] of cam, J____tat .luf natiwz. • All filings must be made on Town of Yarmouth forms. • All applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. Refer to Meeting Schedule. • Failure to follow the Administrative Checklist shall result in an Administrative Incomplete Application and will not be scheduled for a Public Hearing. • Contact the Conservation Office if you need assistance. Submitting an appeicatio.0 x Hardcopy of the COC application mailed to or dropped off at the conservation Office In Town Hall. x Signed statement from an Engineer or similar professional who prepared the approved plan stating the date of a recent site inspection and certifying compliance with the permit and outlining departures from the approved plan, if any exist. N/A If mitigation planting was required, include planting date and confirm the required time has elapsed*. N/A As-Built plan meeting all Plan Requirements. — *Refer to the issued Order of Conditions: Special Conditions to determine if an as-built is required*. x PDF of the COC request including application, letter, and as-built plan (if needed) emailed to bdirienzo(c�yarmouth.ma.us and jjerolimovarmouth.ma.us X Local filing fee. Refer to the Fee Schedule. Make check payable to "Town of Yarmouth" and include property address in memo. All forms, Fee Schedule and Meeting schedule can be found at https://www.yarmouth.ma.us/696/Filing-Forms. *Click Yarmouth Street Index for parcel-related Conservation documents. Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492 Rev 6/2026 Tel. (508)-398-2231 Ext. 1288 • Fax(508)-398-0836 • TTD#(508)398-2231 •bdiriezno(aiyarmouth.ma.us Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8A - Request for Certificate of Compliance SE83-1390 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information Important: When filling out 1. This request is being made by: forms on the Joseph Lapriore computer, use Name only the tab key to move 20 Perch Pond Way your cursor Mailing Address do not use the Yarmouth Port MA 02675 return key. City/Town State Zip Code Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: I�AlI Joseph Lapriore Applicant 2/20/1997 SE83-1390 Dated DEP File Number Upon completion of the work 3. The project site is located at: authorized in 20 Perch Pond Way Yarmouth Port an Order of Street Address City/Town Conditions, the 114 117 property owner must request a Assessors Map/Plat Number Parcel/Lot Number Certificate of 4. The final Order of Conditions was recorded at the Registry of Deeds for: Compliance from the issuing authority stating Property Owner(if different) that the work or Barnstable 10623 136 portion of the work has been County Book Page satisfactorily completed. Certificate(if registered land) 5. This request is for certification that(check one): ❑ the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc••rev.5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance SE83-1390 Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ❑ Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-reqional-office- for-your-city-or-town.htm I). wpaform8a.doc••rev.5/29/14 Page 2 of 2