HomeMy WebLinkAboutCCOR 06-26-2026 789-163 to 789-165Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:6/26/2026 Client:Wright-Pierce Client Rep:Rayssa FonteWeather:Rain 65 - 68°F S.W.COLE Rep:Alexander Charnitsky General Contractor:Nickerson Time Onsite:05:30 - 12:00Placement Type: Footing  Wall  Slab  Other Placement Location:SBR Slab 22 & SBR Gallery Slab 35 Concrete Placement Observations Observed Comments Required mix used Yes 4500psi, 1 1/2", 3/4, Sika 75 Concrete properly conveyed to all areas of placement Yes Pump Truck Internal vibration / consolidation of concrete Yes Handheld vibrator Even layering around openings and embedments Yes Concrete evenly layered and vibrated around openings and embedments Post placement observations (finishing, curing, etc.)Yes Concrete Manually Finished Field Testing of Concrete performed:Yes *CYLINDER SET NO:789-163 to 789-165  *Refer to associated concrete test report Notes: As requested by Rayssa (CDM Smith), an S.W.COLE rep was onsite to perform concrete sampling, and concrete testing at the locations referenced above. The S.W.COLE Construction Services representative arrived onsite at approximately 5:30 AM. Concrete placement was observed during the time of sampling and testing. Concrete Delivery of Load 1 arrived onsite with approximately 11 cubic yards of 4,500‑psi concrete with 1‑1/2‑inch aggregate. Sika 75 admixture was added prior to placement. The concrete was placed via pump truck. Two sets of field tests total were performed on sampled concrete with the following results: Truck 59 – Load 1 Slump: 6 inches Air Content: 4.5 percent Concrete Temperature: 77°F Truck 75 – Load 10 Slump: 7.5 inches Air Content: 3.8 percent Concrete Temperature: 73°F Two sets of compression test cylinders were cast for laboratory testing at 6, 14, and 28 days (2), along with one hold cylinder. Following completion of the initial placement, the pump truck relocated and utilized a 4,500‑psi concrete mix with 3/4‑inch aggregate. Sika 75 admixture had been added prior to arrival. Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Truck 65 – Load 1 Slump: 8 inches Air Content: 3.5 percent Concrete Temperature: 79°F One set of compression test cylinders were cast for laboratory testing at 6, 14, and 28 days (3), along with one hold cylinder. Laboratory compressive strength test results will be reported separately upon completion of testing. Test results and observations were verbally reported to the onsite client representative while onsite. The S.W.COLE rep departed the site at approximately 12:00 PM after completing the requested services. Attachments: 4 Photos Reviewed by:6/30/2026 Kaylie O'SuivKaylie O'Sullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com