Loading...
HomeMy WebLinkAboutsprinkler inspection 2009}IrD FIRE SPRINKLER SERVICES 352 Main Street.W. Yarmouth, MA 02673.(508) 775-2082 $T r'\ .cancofi resprinkler,com Fire Sprinkler and Backflow Protection Installation. Testing and Maintenarce Name of Premise Address Owner Address SYLVESTER RESIDENCE 13 BAY ROAD WEST YARMOUTH MA 02673 Fa\(508) 775-2880 SPRINKLER SYSTEM REPORT OF TEST & INSPECTION Tel # Tel # 781-749-8811 REPORT # REPORT DATE FS1253 ANNUAL TEST & INSPECTION SEMI-QRTLY INSPECTION6-4-09 Owner's Section A. Explain any occupancy hazard changes since the previous inspection NONE B. Describe fire protection modifications since the last inspection NONE C. Describe any fires since the last inspection NONE D. When was the system piping last checked for stoppage, corrosion, or foreign matter? JUNE 2OO8 F. Are dry valves adequately protected from freezing? N/A 1.) General A. ls the building occupied? B. Are all systems in service? C. ls there a minimum of 18 in. clearance between the top of the storage and the sprinkler deflector? D. ln areas protected by wet systems, does all of the building appear to be properly heated? E. Does the hand hose on the sprinkler system appear to be satisfactory? F. ls the building completely sprinkled? G. 2" main drain flowed?(l") H. Dry system, low points drained this inspection? l. Alarms tested this inspection? lnspection comments: NO N/A THIS IS A RESIDENTIAL ANTIFREEZE SYSTEM MONITORED BY NEMEC'S ALARM YES x x X x x x x coM PANY. THE ANTIFREEZ E TESTED TO -,I2F. JEAN SYLVESTERffi E. When was the dry piping system last checked for proper pitch? N/A x x 2.1 Control Valves A. Are all sprinkler system control valves and all other valves in the appropriate open or closed position? B. Are all control vales in the open position and locked, sealed, or equipped with a tamper switch? 3.) Water Supplies A. Was a water flow test of the main drain made at the sprinkler riser? 4.)Tanks. Pumos. Fire Department Connections A. Are fire pumps, gravity tanks, reservoirs, and pressure tanks in good condition and properly maintained? B. Are fire department connections in satisfactory condition, couplings free, caps in place, and check valves tight? Are they accessible and vasible? 5.)Wet Systems A. Are cold weather valves (O.S. & Y.) in the appropriate open or closed position? B. Have antifreeze system solutions been tested? C. Were the antifreeze test results satisfactory? 6.)Dry Systems A. ls the dry valve in service? B. Are the air pressure and priming water level in accordance with manufacturer's instructions? C. Has the operation of the air or nitrogen supply been tested? D. Were low points drained during this inspection? F. Did the dry valve trip properly during the trip pressure test? G. Did the heating equipment in the dry-pape valve room operate at the time of inspection? X X X x X x x x X x X X YES NO N/A E. Oid quick opening devices operate satisfactorily? X x x 8.) Alarms A. Did the water motor and gong test satisfactorily? B. Did electric alarm test satisfactorily? C. Did supervisory alarm service test satisfactorily? e.)Sprinklers A. Are all sprinklers free from corrosion, loading, or obstruction to spray discharge? B, Are sp,inklers less than 50 years? C. ls stock of spare sprinklers available? D. Ooes the exterior condition of the sprinkler system appear to be satisfactorily? E. Are sprinklers of proper temperature ratings for their locations? 10.) Oate dry-pipe valve tested (control valve partially open) 11.) Oate dry-pipe valve tested (control valve fully open) 12.) Oate quick-opening device tested 13.) Date deluge or preaction valve tested 14.) Review control valve maintenance YES NO N/A N/A N/A N/A N/A YES X x x x x X x x x X x 7.) Special Svstems A. Did the deluge or preaction valves operate prope.ly during the last test? B. Did the heat-responsive devices operate properly during testing? C. Oid the supervisory devices operate during testing? DRY PIPE OPERATING TEST Control Valves Number Trip Test Table DRY VALVE Control Valve Maintenance Table o en Secured Closed S Q.O.D. IF NO, EXPLAIN SERIAL NO. ALARM OPERATED PROPERLY NO IF NO, EXPLAIN HYDRAULIC NO NOOELUGE & PRE.ACTION VALVES MAXIMUM TIME TO OPERATE RELEASE SEC Explain Abnormalns Condition MAKE MODEL SERIAL NO.MAKE MODEL TIME TO TRIP THRU TEST coNflEcTtoN WATER PRESSURE AIR PRESSURE TRIP POINT AIR PRESSURE TIME WATER REACHED TEST OUTLET MIN sEc PSt PSt PSt MIN sEc YES WTHOUT Q.O.D. WTH o.o.o OPERATION PNEUMATIC ELECTRIC PIPING SUPERVISED YES NO OETECTING MEDIA SUPERVISED YES OOES VALVE OPERATE FROM THE MATIUAL TRIP AI{D/OR REMOTE CONTROL STATIONS YES IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR TESTING YES NO MODEL DOES EACH CIRCUIT OPERATE SUPERVISION LOSS ALARM DOES EACH CIRCUIT OPERATE VALVE RELEASE YES NO YES NO MIN II I City Connection Ptv NONE Tank Control Valves NONE Pump Control Valves NONE Sectional Control Valves NONE System Control Valves 2 BUTTER BALL YES NO YES NONE Other Control Valves NONE Backflow valve lnspectors Test Valve Auxiliary Drain Valves Make Model Size Location Size Serial # 136943 TEST & DRAIN AT CONTROL VALVES WILKINS 975X1 2-INCH RPBP 1 %'CONTROL VALVES MAKE YES ----T--- Tank? Date Pump? Last Flow Test 6-2-08 Test Pipe Location Static Pressure 75 Residual Pressure bU Current Flow Test 6-4-09 RISER 16.) Heat Responsive Devices Test Method N/A Type of Equipment Manufacturel Test Results: Valve Valve Valve Valve No. No. No. No. ABCDEFABCDEFABCDEFABCDEF Valve No alve No alve No alve No v v v Auxiliary Equipment: No? Type?Location? 17,) Explain any "No" answens and comments Test Result? NONE 19.) Attnougn these comments are not the result of an engineering review, the following desirable improvements are recommended. NONE lnspector's Name Company Date PAUL L, CUDDY CANCO FIRE SPRINKLER SERVICES 6-4-09 15.) Water Flow Test at Sprinkler Riser Water supply source City? x RISER Size Test Pipe 1', 1 A B C DE FA B C DE FA B C DE FA B C DE F 18.) Aajustments or corrections made during this inspection. LUBRICATED FIRE DEPARTMENT CONNECTION.