Loading...
HomeMy WebLinkAboutCOC 1713 request 7.7.2026CAPE COD ENGINEERING, INC. Robert M. Perry, P.E. P.O. Box 1517 East Dennis, MA 02641 508-385-1445 boh er a ecoden ineerin .com July 2, 2026 Town of Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 RE.: SE 83-1713 - 185 Cranberry Lane, So. Yarmouth — Certificate of Compliance Construct and Maintain a Pier, Ramp and Float To the Conservation Commission, Attached please find Form 8A and a check in the amount of $150. The Order of Conditions to construct and maintain a pier, ramp and float was issued in 2005. The COC certification relates to the referenced project only and does not address overall site or property conditions. A site inspection was made on June 25, 2026. Measurements taken at that time indicate the project was built consistent with the plan. The pier portion was uniquely designed to overlie, and be anchored to, an older, existing stone groin. The means of anchoring to the stones is consistent with the intention of the approved plan. Based on my research and knowledge of the site, I hereby certify that the project was carried out in compliance with the Order of Conditions and the approved plan. Please contact me directly with any questions. Sincerely, Cape Cod Enginee g, Inc. Robert M. Pe Attachment -- Image, page 2 Fir�re I — Pier anchored to the stone groin at 185 Cranberry Lane, Yarmouth. 7 f Si Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8A --• Request for Certificate of Compliance SE 83-1713 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 1.4.3 _ A. Project Information Important: 1 When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. r� 2 Upon completion of the work 3 authorized in an Order of Conditions, the property owner must request a Certificate of 4 Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. This request is being made by: Cape Cod Engineering, Inc. Name PO Box 1517 Mailtng Address East Dennis 508-385-1445 Phone Number MA 02641 State Zip Code This request is in reference to work regulated by a final Order of Conditions issued to: Yiping pin Applicant 4/29/2005 The project site is located at: 185 Cranberry Lane Street Address 128 Assessors Map/Plat Number SE 83-1713 DEP File Number South Yarmouth CitylTown 13 Parcel/Lot Number The final Order of Conditions was recorded at the Registry of Deeds for: Property Owner (if different) — Barnstable 20127 176 County Book Page Certificate (if registered land) 5. This request is for certification that (check one): ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regufated by it was never started. wpaf0rm8a.doc — rev. 5129/14 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8A — Request for Certificate of Compliance SE 83-1713 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information (cunt.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (se ttp /Iwww.m )ss.gov/eea/aaen lie! /massdieD/about/contacts/fnd-the-massdeD-regional office for-your-cit-or-town.html . wpaform8a.doc -- rev. 5129114 Page 2 of 2