HomeMy WebLinkAboutMitigation plan rev 7.9.2026Hamlyn Consulting
690 Thousand Oaks Drive
Brewster, MA 02631
774-323-0603
Plan section from
Plan Showing Proposed Bulkhead Reconstruction
7 Cape Isles Drive, South Yarmouth, MA
prepared for Thomas Dandis
Down Cape Engineering, Shorefront Consulting
5/13/26
Notes
Substitutions allowed with prior approval of Conservation Administrator.
Locations may be field adjusted.
Temporary irrigation may be used for the first growing season.
Hand weeding of invasive plant species is allowed.
Mulch placement is limited to drip line of individual plants.
Mitigation area to remain undisturbed in perpetuity.
Failed plantings are to be be replaced to 90% survival.
Plant 8-foot buffer behind bulkhead - 680 sf
(2) Inkberry (Ilex glabra), 2 gal. 4' on center
(11) Virginia rose (Rosa virginiana), 2 gal., 4' on center
(125)Bearberry (Arctostaphylos uva ursi), 4" pot, 1' on center, staggered
(14) Sweet fern (Comptonia peregrina), 1 gal., 30" on center
(7) Beach plum (Prunus maritima), 2 gal., 4' on center
(5) Black chokeberry (Aronia melanocarpa), 2 gal., 4' on center
(4) Little bluestem (Schizachyrium scoparium), 1 gal., as shown among shrubs and flowers
(2) Switch grass (Panicum virgatum), 1 gal., as shown
(8) New York aster (Symphyotrichum novi-belgi), 2" plugs, as shown among shrubs and grass
(7) Seaside goldenrod (Solidago sempervirens), 1 gal., as shown among shrubs and grass
N
Proposed Mitigation Plan
prepared for
Thomas Dandis
7 Cape Isles Drive, South Yarmouth, MA
Date: July 8, 2026 Scale: 1"=20'
rev. 7/9/2026