Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
792-792-173
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:7/13/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 7/6/2026 Time Cast: 12:32 PM Date Received: 7/7/2026 Placement Location:SBR SLAB 21 & 20 WALLS, SE COLUMNS IN SBR 2, PROCESS FOOTING SUPPORT WALL Placement Method:PUMP Cylinders Made By:Alexander Charnitsky Material Type:Concrete Cylinders Placement Vol. (yd ):40 Aggregate Size (in):3/4 Cylinder Size:4" x 8" INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:SIKA 75 TEST RESULTS Slump (in) (C-143):7 Air Content (%) (C-231):3.6 Air Temp (°F):70 Conc. Temp (°F) (C-1064):79 Load Number:2 Mixer Num.:77 Ticket Num.:75683 Cubic Yards:11 Design (psi):4500 Batch 11:57 AM Arrive 12:20 PM Depart 12:38 PM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-173A N 8.45 3.99 12.47 7/13/2026 Lab Unbonded 7 5 57.13 4570 792-173B 8.45 7/20/2026 Lab 14 792-173C 8.45 8/3/2026 Lab 28 792-173D 8.45 8/3/2026 Lab 28 792-173E 8.45 HOLD Lab 3 2 Remarks:Kaylie O'Sullivan Reviewed By