Loading...
HomeMy WebLinkAboutStructural Engineer Letter 5/27/26 3Lt z °i " ED J Architect/Principal 132026 ERT Architects, Inc. BUILDING DEPARTMENT By 508.362.8883 DWD ENGINEERING, INC. 5 MICHAEL ROAD EAST BRIDGEWATER,MA 02333 (508)378-9602 domdean@aol.com May 27,2026 Mr.Brad Inkley-Building Commissioner Yarmouth Building Department 2 Fairgrounds Road Nantucket, MA 02554 RE: Connection Review 44 N Sandyside Lane-Yarmouth,MA Dear Inkley, This letter is to confirm that I have reviewed the as-built framing conditions for the connector between the two structures. The stamped drawings(prepared by ERT Architects with the structural portion reviewed and stamped by this office)indicated the roof beam connections to the posts were to be either Simpson ACE post caps or Simpson LSTA15 straps. The contractor provided..,traps in lieu of the caps. I have reviewed the as-built condition and found it to be structurally sound. No further work is required.I-i addition,I reviewed the connection of the beam to the existing structure.The contractor was only able to get the top two thirds of the connectors into the existing structure. However, because of the short spans involved the loading is relatively small and the existing screws are structurally adequate to transfer the design loads to the existing structure and no further work is required.Feel free to call or email if you have questions or concerns. S t-rely, • r•NGI:LO rn Cc EFIT Architects STRUCTURAL u, No.35062E Anderson Contractors '°q RFGIST '`�� o�sSH1Na��d�:•'