HomeMy WebLinkAboutCCOR 07-14-2026 792-175Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:7/14/2026 Client:Wright-Pierce Client Rep:Allen SulcWeather:Partly Cloudy 71 - 83°F S.W.COLE Rep:Andrew Carter General Contractor:Nickerson Time Onsite:06:22 - 09:00 Placement Type: Footing  Wall  Slab  OtherPlacement Location:Slab 31 - Walls on gallery Concrete Placement Observations Observed Comments Required mix used Yes 1-1/2", 4500psi Concrete properly conveyed to all areas of placement Yes Pump Truck Internal vibration / consolidation of concrete Yes Worm Vibrator Even layering around openings and embedments Yes Evenly layered with trowels Post placement observations (finishing, curing, etc.)Yes Smooth Trowel Finish Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-175  *Refer to associated concrete test report Notes: As requested by Wright-Pierce, S.W. COLE rep. Andrew Carter, Construction Services Technician, arrived onsite at approximately 6:22 AM to observe concrete placement activities and perform field testing. Upon arrival, S.W. COLE rep. met with Allen Sulc, representative of Wright-Pierce, to discuss the planned concrete placement activities for the day. Concrete was supplied by Cape Cod Ready Mix. The concrete was reported to be a 1½-inch nominal aggregate, 4,500-psi design mix. Approximately 55 cubic yards of concrete were placed during the observation period. Concrete sampling and field testing were performed in general accordance with applicable ASTM standards. Samples were collected from the first load delivered to the site. The following results were obtained from the first load: First Poured Load – Truck No. 81 Slump: 6 inches Air Content: 3.8% Concrete Temperature: 80°F Concrete placement activities were observed utilizing a pump truck and internal consolidation activities were observed utilizing a worm-type internal vibrator. A total of five (5) 6" x 12" concrete cylinders were cast from the first load for laboratory compressive strength testing, consisting of one (1) cylinder for 7-day testing, one (1) cylinder for 14-day testing, and two (2) cylinders for 28-day testing. One (1) additional cylinder was designated as a hold specimen. Field test results and observations were verbally communicated onsite to Allen Sulc, representative of Wright-Pierce, at the time of testing. Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com       Attachments: 2 Photos Reviewed by:7/15/2026 Kaylie O'SuivKaylie O'Sullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com