HomeMy WebLinkAboutCCOR 07-10-2026 792-174 (1)Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:7/10/2026 Client:Wright-Pierce Client Rep:Allen SulcWeather:Clear 71 - 86°F S.W.COLE Rep:Andrew Carter General Contractor:Nickerson Time Onsite:06:55 - 11:30 Placement Type: Footing  Wall  Slab  OtherPlacement Location:Northwest and Center Base Slabs of Headworks bldg. Concrete Placement Observations Observed Comments Required mix used Yes 3/4", 4500psi Concrete properly conveyed to all areas of placement Yes Pump Truck Internal vibration / consolidation of concrete Yes Worm Vibrator Even layering around openings and embedments Yes Evenly layered with trowels Post placement observations (finishing, curing, etc.)Yes Smooth Trowel and Bull Float Finish Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-174  *Refer to associated concrete test report Notes: As requested by Wright-Pierce, S.W. COLE rep Andrew Carter, Construction Services Technician, arrived onsite at approximately 6:55 AM to observe concrete placement operations and perform field testing. Upon arrival, the S.W. COLE representative met with Allen Sulc, representative of Wright- Pierce, to discuss the planned concrete placement activities for the day. Concrete was supplied by Cape Cod Ready Mix. The concrete was reported to consist of a 3/4- inch nominal aggregate, 4,500-psi design mix. Approximately 99 cubic yards of concrete were observed to be placed during the observation period. Concrete sampling and field testing were performed in general accordance with applicable ASTM standards. Samples were obtained from the first load delivered to the site. The following results were obtained: First Poured Load – Truck No. 74 Slump: 5.25 inches Air Content: 3.3% Concrete Temperature: 81°F Concrete placement was observed to be performed using a pump truck. Internal consolidation was observed using a worm-type internal vibrator. Concrete spreaders were observed to distribute the concrete, and hand trowels were observed to level and finish the surface. At the time of departure, the two columns located east of the headworks building and the process footing support wall had not yet been placed. The S.W. COLE representative departed the site prior to completion of all planned concrete placement activities in order to report to another scheduled project. Prior to departure, Allen Sulc verbally indicated that no additional concrete testing was requested for the remaining concrete placement activities. Although only Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com approximately 99 cubic yards of concrete placement were observed by the S.W. COLE representative, Allen Sulc indicated that the planned placement quantity would exceed 100 cubic yards. A total of five (5) concrete cylinders were cast from the first load for laboratory compressive strength testing, consisting of one (1) cylinder designated for testing at 7 days, one (1) cylinder designated for testing at 14 days, and two (2) cylinders designated for testing at 28 days. One (1) additional cylinder was designated for hold purposes. Field test results and observations were verbally communicated onsite to Allen Sulc, representative of Wright-Pierce, at the time of testing.     Attachments: 4 Photos Reviewed by:7/14/2026 Kaylie O'SuivKaylie O'Sullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com