Loading...
HomeMy WebLinkAbout792-792-170 (2)58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:7/16/2026 Concrete Supplier: PLACEMENT INFORMATION Date Cast: 7/2/2026 Time Cast: 7:53 AM Date Received: Placement Location:HEADWORKS BUILDING NE, CENTER W, S BASE SLAB Placement Method:PUMP Cylinders Made By:Andrew Carter Material Type:Concrete Cylinders Placement Vol. (yd ):116 Aggregate Size (in):3/4 Cylinder Size:4" x 8" INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:SIKA CONTROL 75 TEST RESULTS Slump (in) (C-143):8 1/4 Air Content (%) (C-231):3 Air Temp (°F):76 Conc. Temp (°F) (C-1064):82 Load Number:10 Mixer Num.:60 Ticket Num.:52658 Cubic Yards:10 Design (psi):4500 Batch 6:52 AM Arrive 7:30 AM Depart 8:20 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-170A N 8.30 3.99 12.50 7/8/2026 Lab Unbonded 6 3 62.177 4970 792-170B N 3.99 12.50 7/16/2026 Lab Unbonded 14 5 69.28 5540 792-170C 7/30/2026 Lab 28 792-170D 7/30/2026 Lab 28 792-170E HOLD Lab 3 2 Remarks:Derek Mello Reviewed By