Loading...
HomeMy WebLinkAbout792-792-17558 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:7/21/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 7/14/2026 Time Cast: 7:05 AM Date Received: 7/15/2026 Placement Location:WALLS ON GALLERY SLAB 31 Placement Method:PUMP Cylinders Made By:Andrew Carter Material Type:Concrete Cylinders Placement Vol. (yd ):55 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures: TEST RESULTS Slump (in) (C-143):6 Air Content (%) (C-231):3.8 Air Temp (°F):72 Conc. Temp (°F) (C-1064):80 Load Number:1 Mixer Num.:81 Ticket Num.:52809 Cubic Yards:11 Design (psi):4500 Batch 6:18 AM Arrive 6:50 AM Depart 7:15 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-175A N 29.45 6 28.32 7/21/2026 Lab Unbonded 7 5 160.44 5680 792-175B 29.5 7/28/2026 Lab 14 792-175C 29.45 8/11/2026 Lab 28 792-175D 29.5 8/11/2026 Lab 28 792-175E 29.40 HOLD Lab 3 2 Remarks:Derek Mello Reviewed By