Loading...
HomeMy WebLinkAboutLetter re: erosion 7.29.2026939 main street rte 6a yarmouth port mass 02675 land court surveys structural design site planning sewage system designs inspections permits down cape engineering, inc civil engineers & land surveyors July 29, 2026 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 Ref: 1 Malfa Road, West Yarmouth, MA (SE83-2282) Dear Commission Members: tel. (508) 362-4541 fax (508) 362-9880 Daniel A. Ojala, P.E., P.L.S. Arne H. Ojala, P.E., P.L.S. Daniel E. Gonsalves, P.E., S.E. Craig J. Ferrari, E.I.T., S.E. Phellyp T. Tonial, E.I.T., S.E. In September 2021, the Commission issued an Order of Conditions for the above -referenced site, for the construction of sheet pile wall. Special condition #14 of this order requires revetment stones to be added to the wall when 50% of the sheet pile wall is exposed above the mean high water line. A site visit was made in July and a survey of the existing conditions relative to the proposed plan was carried out. It was discovered that the grade at the bottom of the exiting wall has eroded approximately 2' since its installation meeting the threshold for condition 14. Recent photos are enclosed for review showing this erosion and exposed wall. Beacon Marine is prepared to install the toe stones per the approved plan dated 7-29-21 pending the Commission's discussion. Thank you for your consideration. Very truly yours, J Daniel A. Ojala, PE, PLS Down Cape Engineering, Inc. 0