Loading...
HomeMy WebLinkAboutSite plan rev 7.20.2026F-1Q F-E3 E) n I I L-), c- p; D N I FOR EXAMPLE ONLY; NOT TO SCALE (2) 3" X 8" P.T. CAP; W/ h' GALV. BOLTS *0S (TYP) GALV. LAG BOLTS 3' O.C. (TYP) (ALTERNATE 2"x8'ITH CAP THRU-BOLTS (TYP) (2) 3' X 6' P.T. CAP 2%8" x { SUPPORTS; W/ }�" GALV. BOLTS 0 3' O.C. (TYP) 2"x8" SHOREGUARD CL 9900 SHEETING (TYP) CAP TOP VIEW CAP TOP VIEW (ALTERNATE) BULKHEAD CAP DETAIL 1 .5 Q 1 2 4 1 "=2' R, 2" x 4" BALLUSTE 4" SPACING (T 4" x 4" RAILING SUPPORT POSTS (TYE " THROU, BOLTS (TY 2" x 12" STAIR STRINGERS (TYP,' SEE NOTE 13 POST CAP (TYP) " RAILING HEIGHT !" X 6-DECKING, X2" SPACE ITWEEN DECK BOARDS (TYP) 2" x 4" TREAD SUPPORTS; THROUGH BOLTED INTO STRINGER (TYP) 2" x 12" STAIR TREADS (TYP), ((2) 2" X 6" OPTIONAL) STAIR SECTION FRONT VIEW DETAIL 5 Q 5 10 20 DCE ##24-333 SCALE: 1"=10' N/F MAP 111, PARCEL 29 PAUL PECORARO 156 BLUE ROCK ROAD SOUTH YARMOUTH, MA 02664 PROPOSED N4" THRU-BOLTS; 2' O.C. (TYP) PROPOSED CHANCE HELICAL ANCHORS; 6' SPACING, (TY; 6'f BULKHEAD PLAN VIEW DETAIL 1 .5 0 1 2 4 1 "=2' " THROUGH BOLTS (TYP) 1� 4" x 4" SUPPORT\ , POSTS; EMBED 4' MINIMUM (TYP) 2" x 12" DOUBLED JOIST, HEADERS (TYP) 2" x 8" FLOOR JOISTS, FLUSH FRAMED 16" O.C., WITH GALV. HANGERS (TYP) STAIR SECTION ELEVATION DETAIL 5 Q 5 10 20 SCALE: 1 "=10' 20p �° (ti <56 Ac �PNp�NG $ X5� PARS tip , MEEK "D. / L pR° �rEP°I 5�5 P�\GNN6\A13 �EOi 8E � SITE PLAN -EXISTING AND PROPOSED 10 5 Q 10 20 40 SCALE: 1 "= 20' RESOURCE AREA TABLE TOTAL LOT SIZE = 35.284+/- SO. FT AREA WITHIN THE 100'_ RIVERFRONT AREA = 14.920f SO. FT AREA WITHIN THE 100'-200' RIVERFRONT AREA = 15.669f SQ. FT. WORK WITHIN 100' RIVERFRONT AREA EXISTING 540f SQ. FT. (EXISTING STAIRS) PROPOSED = STAIRS, NO CHANGE; PROPOSED BACKFILL = 1,300t SQ. FT. STRUCTURES WITHIN THE 0'-35' BUFFER OF COASTAL BANK EXISTING = 2,320f SQ. FT. PROPOSED =NO CHANGE STRUCTURES WITHIN THE 35'-50' BUFFER OF COASTAL BANK EXISTING = 968t SQ. FT. NO CHANGE PROPOSED STRUCTURES WITHIN THE 50'-100' BUFFER OF COASTAL BANK EXISTING = 305f SQ. FT. PROPOSED = NO CHANGE 40.0( 30.0( 20.0( 10.0( i •I -20.0( 0+ CONSTRUCTION NOTES: 1. THE SCOPE OF WORK FOR THIS PROJECT IS TO REPLACE THE EXISTING PERMITTED BULKHEAD, AND RECONSTRUCT THE PREVIOUSLY LICENSED PIER, RAMP, AND FLOAT TO CURRENT STANDARDS. THE BULKHEAD WILL BE EXTENDED ALONG THE WATERFRONT FOR A TOTAL LENGTH OF 136'i. NEW RETURNS ARE PROPOSED TO PREVENT FLANKING. IN ADDITION, THE EXISTING ACCESS STAIRS WILL BE REBUILT IN KIND, WITH THE RISE AND RUN ADJUSTED TO MAINTAIN 18" OF CLEARANCE TO THE UNDERLYING VEGETATION. THE LANDINGS SHALL BE REBUILT IN THEIR SAME LOCATION AND HEIGHT, 2. THE RISE AND RUN FOR THE PROPOSED STAIRS IS APPROXIMATE; ALL DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED IN THE FIELD WITH SHOREFRONT CONSULTING PRIOR TO CONSTRUCTION OF THAT PHASE. 3. ELEVATIONS REFER TO NAVD 88. CONTACT DOWN CAPE ENGINEERING FOR ADDITIONAL ELEVATION INFORMATION AS NEEDED. 4. CONSTRUCTION ACCESS SHALL BE VIA THE ACCESS ROUTE SHOWN ON THE PLAN AND DIRECTLY OVER THE APPLICANT'S PROPERTY. 5. THE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH THE INSTALLATION OF THE PROPOSED WORK. EQUIPMENT AND MATERIALS HANDLING SHALL BE IN ACCORDANCE WITH THE WORK PROTOCOL SUBMITTED WITH THE NOTICE OF INTENT, THE RESULTING ORDER OF CONDITIONS AND AS DIRECTED BY THE YARMOUTH CONSERVATION AUTHORITIES. 6. THE BULKHEAD INSTALLATION SHALL BE ACCOMPLISHED FROM A WORKING BARGE AS MUCH AS PRACTICAL. THE REMAINDER OF WORK SHALL BE ACCOMPLISHED BY HAND. AT NO TIME SHALL THE WORKING BARGE COME IN CONTACT WITH THE RIVER BOTTOM. 7. MATERIALS AND EQUIPMENT SHALL BE STORED ON THE APPLICANT'S PROPERTY OR THE WORKING BARGE DURING TIMES OF HIGH TIDE AND WHEN NOT IN USE. WORKING BARGE TO BE ANCHORED TO AVOID BOTTOMING OUT DURING PERIODS OF LOW TIDE. 8. PILES SHALL BE DRIVEN BUTT END FIRST TO THE DEPTHS SPECIFIED ON THE PLAN. IF DESIGN EMBEDMENT CAN NOT BE REACHED, SHOREFRONT CONSULTING SHALL BE CONTACTED BEFORE PROCEEDING. PILES CAN BE INITIALLY JETTED TO SET, BUT THEN SHALL BE MECHANICALLY DRIVEN FROM THE WORKING BARGE. 9. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RETURNED TO THEIR PRE -CONSTRUCTION CONDITION. ALL WORK SHALL BE INSPECTED BY SHOREFRONT CONSULTING AND RECEIVE APPROVAL BEFORE REMOVING EQUIPMENT FROM THE SITE. 10. THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTORED TO RESEMBLE THE PRE -CONSTRUCTION CONTOURS AND CONDITIONS. 11. THE CONTRACTOR SHALL OBTAIN A COPY OF THE ORDER OF CONDITIONS ISSUED FOR THE PROJECT BY THE YARMOUTH CONSERVATION COMMISSION PRIOR TO THE START OF ANY WORK. 12. ALL HARDWARE SHALL BE GALVANIZED OR STAINLESS STEEL, UNLESS OTHERWISE APPROVED BY OWNER OR SHOREFRONT CONSULTING. 13. CLEAN SAND FILL SHALL BE USED BEHIND THE BULKHEAD. 14. VINYL SHEETING SHALL BE SHOREGUARD CL-9900, OR EQUAL, WITH A MINIMUM SECTION MODULUS OF 20. SHEETING SHALL BE 20-FOOT LONG SHEETS, AND SHALL BE DRIVEN TO THE FULL DEPTH WITH MINIMUM CUTOFF. IF DESIGN EMBEDMENT CAN NOT BE REACHED, SHOREFRONT CONSULTING SHALL BE CONTACTED BEFORE PROCEEDING. 15. REFER TO STRUCTURAL DRAWING ENTITLED "PLAN SHOWING 10' ENGINEERED VINYL BULKHEAD", BY SHOREFRONT CONSULTING, AND STAMPED BY MARK MCKENZIE, P.E., DATED 12/12/12 FOR BULKHEAD DETAILS. THE CL9900 SHEETING SHALL BE UTILIZED TO REPLACE THE CL9000 MATERIAL WHICH IS NO LONGER AVAILABLE. THE CL9900 HAS A SECTION MODULUS OF 20 WHERE THE CL9000 HAD A SECTION MODULUS OF 16.4; THEREFORE, THE CL9900 IS A SUITABLE REPLACEMENT AND SHALL BE USED. THE DESIGN ANCHOR SPACING IS 7' WHERE 6' WILL BE USED. ALL OF THE CHANGES ARE MORE CONSERVATIVE FROM THE ORIGINAL THE DESIGN. 16. REFER TO THE PLANTING LIST FOR PLANTING IN THE FILLED AREA. SUBSTITUTIONS CAN ONLY BE MADE WITH CONSERVATION APPROVAL. 17. NORTH END OF WALL SHALL TERMINATE 10 FFET FROM THE PROPERTY LINE. PROVIDE A FIBER ROLL "SOFT RETURN" ON THE NORTH END AS SHOWN. FIBER ROLLS SHALL BE 20" DIAMETER, AND ANCHORED. 18. THE EXISTING STAIRS ARE PERMITTED AND SHALL FIRST BE REPAIRED FOR USE IN THE SUMMER OF 2026. THE ENTIRE STAIRCASE WILL BE RECONSTRUCTED OFF SEASON AT A LATER DATE. 19. THE ENTIRE STAIR RECONSTRUCTION SHALL INCLUDE A 8'x1O' LANDING ON TOP OF THE WALL, WITH NEW ACCESS STAIRS TO THE BEACH. 20. RISE, RUN, AND STAIR RUNS ARE APPROXIMATE. VERIFY ALL DIMENSIONS AND LAYOUT IN THE FIELD PRIOR TO CONSTRUCTION. 21. NEW BULKHEAD SHALL BE INSTALLED AS FAR LANDWARD AS POSSIBLE, TOP OF WALL SHALL BE ELEVATION 5.5', WITH ONE 20-INCH FIBER ROLL ON TOP, EXISTING GRADE ---- TOP OF SCARP -- EXISTING SCARP BOTTOM OF COASTAL BANK - S.S. CABLE ANCHORS; DB 68 - OR EQUAL; (ANCHOR EVERY 3 FT.); EMBED 5' MINIMUM INTO UNDISTURBED SOIL. REGRADE SCARP WITH COMPATIBLE MATERIAL AND PLANT WITH AMERICAN BEACH GRASS, 12" O.C.. PLANT WOODY SHRUBS BETWEEN ROLLS 3' O.C. (REFER TO PLANTING PLAN) 1.5 1 COVER WITH 90OG COIR MATTING AND COMPATABLE SOIL PROPOSED 20' DIAM., 10-20' LONG FIBER ROLLS EXISTING GRADE 3 8" STAINLESS STEEL CABLE; e , SLEEVE IN FLEXIBLE HOSE TO PREVENT CHAFFING FIBER ROLLS FIBER ROLL DETAIL 2.5 0 2.5 5 10 SCALE: 1 "=5' COASTAL BANK COASTAL BEACH PROPOSED GRADE 20' MINIMUM EMBEDMENT BEHIND EXISTIN GRADE; ANCHOR SHALL DEVELOP 18K MtN. PROPOSED T. P.T. 2 X 6" BACK WALE 1' X „ a NEW 1 1/2 0 CHANCE HELICAL SCREW ANCHOR BACK FILL SALL BE 6" BELOW T.O.W. TOP OF WALL SHALL BE NO MORE THAN 10' ABOVE EXISTING GRADE PROPOSED CAP; SEE DETAIL PROPOSED CONT. GREENHEART 8"x8" ANCHOR WALE 2'f 1'� THREADED - 1" DOCK WASHERS ROD ADAPTER TYPE SS5 1}¢" X 5' NTH B' & 90" FLIGHTS EXISTING GRADE- ��" ® T-0" O.C. MINIMUM ANCHOR PENETRATION SHALL BE 20', AND DEVELOP 18 KIPS MINIMUM PROPOSED SHOREGUARD CL 9900 ANCHOR FORCE PER ANCHOR VINYL SHEETING, 20 FEET LONG LOCUS MAP SCALE 1 "=2000't LEGEND MHW MEAN HIGH WATER MLW MEAN LOW WATER 2 ELEVATION CONTOUR PROPERTY LINE LIMIT OF WORK/ACCESS SURVEY NOTES: RECORD OWNER, BLUE ROCK ROAD REALTY TRUST LAURA F. RICCI❑, TRUSTEE 185 SYCAMORE DR WESTW❑❑D, MA 02090 ASSESSORS MAP 101, PARCEL 158 DEED CETIFICATE #161469 LAND COURT PLAN #32679-B, SH 7, LOT 91 PROPERTY LIES WITHIN RESIDENTIAL ZONE R40. PROPERTY LINES DEPICTED HEREON ARE BASED ON A FIELD SURVEY BY DOWN CAPE ENGINEERING IN APRIL, 2020 AND COMPILED FROM PLANS ON RECORD RECORDED IN THE BARNSTABLE COUNTY REGISTRY OF DEEDS. PARCEL APPEARS TO LIE WITHIN FLOOD ZONE AE (EL. 11' NAVD 88) PER FIRM PANEL #583 OF 875, COMMUNITY MAP NUMBER 25001CO583J EFFECTIVE DATE JULY 16, 2014 AS SHOWN ON THE FEMA ON-LINE DATA BASE. DATUM FOR ALL ELEVATIONS = NAVD 88 MEAN HIGH WATER = 1.6' NAVD 88 MEAN LOW WATER = -1.5' NAVD 88 THE PROJECT IS NOT WITHIN AN NHESP BOUNDARY AND IS THEREFORE NOT SUBJET TO MESA REVIEW BULKHEAD ELEVATION DETAIL ��SS9_ � DANIELAN�, 2.5 0 2.5 5 10 o OJALA " C;ViL SCALE: 1 "=5' No, 4650 a/ 0�F �GST SS/ONAL E�� LAND UNDER OCEAN O.00 EXISTING CONCRETE ALK TO REMAIN i 0, _. ESTIMATM RfSE = 8.25 ESTIMATED RUN = 10" _. AT:L_151MEt�iSf�N�;_Li��7(�l7 , AND RUN TO BE CONFIRMED EXISTING GRADE PRIOR TO CONSTRUCTION PROPOSED RECONSTRUCTED - STAIRS HIEGHTS TO, MATCH EXISTING, 7'f-�►I LANDING LENGTHS AS NOTED FOR _ rl FARANCIF TO VEGETATION, 18 MIN. 3 EXISTING STAIRS AND LANDINGS L4't 2 PROPOPOSED 8'x10' LANDING �. AND ACCESS STAIRS FILL TO RESTORE GRADE AND ..REPLANT TO STABILIZE TWO SCARPS--._. ONE ON THE SOUTH END AND ONE ON TF1E_­N0RTR_`END_0T-TRE_ FLOOD 7nNF AF (FL 11 ) PROPERTY PROPOSED 20" DIAM., 10'-20' LONG FIBER ROLLS _ PROPOSED 3,5_WID��__ _ 1d NOTE; PROPOSED GRADE BEHIND BULKHEAD BEACH ACCESS STAIRS AREA BEHIND�-�UL H _D.._T�.w_�_�LLM- _'-��1�� SQU�;I~E ­EEEI'` TO BE -RETORED-TO MATCH UPPER LENGTH OF =142. FEET SLOPE TO PREVENT SLUMPING; µ _FILL VOLUME OF FILL = 131 YARDS NOT INCLUDING FILLING IN OF ESTIMATED AMOUNT -OF FILL_. TO BE _._... .. _. _._..... _ _ MHW - APPROXIMATELY 200 CUBIC YARDS.SCAReS. TOTAL ESTIMATED Ell 1 2001 CUBIC YARDS P_ OP. RECONSTRUCTED •MLW -- -1.5' _. ---- - - -BULKHEAD € _ v;,st;r,U Z± TIMBER BULKHEAD TO -� -- - 'MLW -� - L 136't. HEIGHT SHALL BE 5.5'. BASE EXITING SECT10=A _ ELEVA-TION DETAIL _­ OF SHEETING TO BE AS FAR LANDWARD A POSSIBLE ALONG ITS LENGTH. _� �_� �_ �� PROPOSED LANDING SUPPORT PILES 8"0, 20'f LONG (4 TOTAL) 00.00 0+25.00 0+50.00 0+75.00 1+0 .00 14-95.00 14-5 n � 111A OF MgSS9C DANIEI.. t A.In OJALA `N No.40980 SURV1�� NO PART OF THIS DRAWING MAY BE USED BY ANY �.oc PARTY WITHOUT THE EXPRESS WRITTEN CONSENT OF SHOREFRONT CONSULTING AND DOWN CAPE ENGINEERING, INC. D.00 D.00 ).00 Ell 10.0 20.( 0 I 2 7/20/26 shorten north wail end fair 10' clearance to property line MCB 2 7/20/26 lower wall by 1 foot, add fiber roll; move bulkhead landward MCB 1 5/15/26 added revised landing layout to plan view MCB N0. I DATE REVISIdN7 BY SHM7 E PROPOSED RECONSTRUCTION OF EXISTING STAIRS, RU' -AD c I! ANDING FLUE ROCK ROAD REALTY TRUST 166 BLUE ROCK ROAD SOUTH YARMOUTH, MA PROJECT M0. SC-290 scALE AS SHOWN DATE 2/11/26 MCB _Ff Dl? DRAMW N0. FEDELE.DWG DOWN CAPE ENGINEERING 939 MAIN STREET I YARMOUTHPORT, MA 02675 (508) 362-4541 SHOREFRONT CONSULTING 290 CENTER STREET DENNIS PORT, MA. 02639 (508) 280-8046 WWW.SHOREFRONTCONSULTiNG.COM c 1 1 O 1 S+Ees