Loading...
HomeMy WebLinkAboutSolar Final affidavit 7/30/26 1111.111 lima ENGINEERING RECEIVED 11 JUL 3 0 2026 12/2/2025 BUILDING DEPARTMENT By --_------ Subject: Post Installation Approval Letter Job Name: GALVIN RESIDENCE Address: 50 S SEA AVE, WEST YARMOUTH, MA, 02673 Attn: To Whom It May Concern On the above referenced project, the roof structural framing has been reviewed for additional loading due to the installation of the solar PV addition to the roof. The structural review, including the plans and calculations only apply to the section of roof that is directly supporting the solar PV system and its supporting elements. EV Engineering has observed the PV installation that was specified for this project.The review was performed to verify that the installation was performed in general conformance with the plans and specifications and that any modifications were acceptable. Calculations were stamped &signed with my professional engineer's seal. After engineer's observation, the AS BUILT has been completed in general conformance of the provisions of the approved permits of the applicable code. Please contact me with any questions or concerns regarding this project STRUCT . Y ONL Sincere) ��NOFM S asa c�, VINCENT 0 MWUMVANEZA CIVIL Vincent Mwumvaneza, PE A '• 2 e EV Engineering, LLC •:l • ENG`` Projects@evengineersnet.com Signed on: 12/02/2025 http://evengineersnet.com/ 276-220-0064