HomeMy WebLinkAboutDRC Rev Elevation 060613Williams, Kathleen
From:Williams, Kathleen
Sent:Thursday, June 06, 2013 11:51 AM
To:Charles Adams (adams2430@gmail.com); Dick Martin (dick@dickmartinera.com); Jack
McCormack (johnhmccormackjr@comcast.net); Sara J Porter (sjparch@comcast.net); Tom
Dipersio Sr (Tom.Sr@tlsurvey.com)
Cc:Tom Dipersio Sr (tomdipersio106@gmail.com)
Subject:FW: Mayflower Place expansion - revised architectural plans
Follow Up Flag:Follow up
Flag Status:Yellow
Attachments:Design Review Committee 5.17.13 Comment Sheet (Mayflower Place Expansion....pdf;
Mayflower Place Revised Elevations (2013_05_21).pdf; Mayflower Elevations as of 051413
2.pdf
Page 1 of 2
6/10/2013
Hi Guys,
Please find attached revisions to the Mayflower Architectural plans based on DRC comments (dated May 21,
2013). I think they are an improvement over the original design, which I have also attached for easy reference.
Also attached are the DRC comments.
Memory Care: I think the only change was to enlarge smaller gable ends which they did and it does look
better proportioned.
Independent Living: I don’t think the architect did quite what was suggested for replacement of the
eyebrows. They are gable ends, but don’t eliminate the soffits to minimize the horizontal look. I like the
arch in the new gable ends as I feel it gives a slight nod to the eyebrow on the adjacent buildings without
exactly copying them. However, I’m not sure I like the way it goes in at the bottom prior to the eave, but
don’t hate it. Seems like a more complicated construction detail. The window change looks better and
adds a vertical element.
I would love to hear what Sara and the committee thinks of these changes and whether they feel we need another
meeting to provide comments to the ZBA saying these issues were addressed.
Thanks,
Kathy
From: Andrew Stebbins [mailto:AStebbins@architecturalteam.com]
Sent: Thursday, June 06, 2013 10:23 AM
To: Williams, Kathleen
Cc: Andrew Singer
Subject:Mayflower Place expansion
Hello Kathy,
I hope you are well. I am sorry I was unable to attend the Design Review meeting. I understand from reading
the comment sheet (attached) that the board was looking for us to reconsider some of the exterior details and
massing. Attached are proposed revisions which we believe address the concerns while keeping the project in
relation to the existing building.
Prior to submitting formally, I thought it would be a good idea to confirm that these revisions address the
comments to the boards satisfaction.
Please feel free to contact me if you have any questions. Thank you.
Andrew N. Stebbins LEED AP
Senior Project Manager
the architectural team
astebbins@architecturalteam.com
T 617.889.4402 x146 F 617.884.4329
50 Commandant's Way at Admiral’s Hill
Chelsea, MA 02150
www.architecturalteam.com