Loading...
HomeMy WebLinkAbout111611 DR 512 518 Route 28..Review is:  Conceptual  Formal  Binding (404 Motels/R.O.A.D. Project)  Non-binding (All other commercial projects) Review is by:  Planning Board  Design Review Committee DESIGN REVIEW COMMENT SHEET Date: November 16, 2011 Map:31 Lot:82/83 Applicant: Cape Cod Inflatable Waterpark Zone(s): Location: 512-518 Route 28, W. Yarmouth Persons Present: Dick Martin Karen Greene Kieran Healy Jack McCormack Joe Marrama Sara Jane Porter Jack Hynes If this is a conceptual review, a formal review will be required before Site Plan Review. Project Summary The proposed project will create an outdoor water park composed mostly of inflatable water amusements. There will be a total of outdoor slides and amusements (20 regular size, 6 toddler). Toddler area will include a lifeguard station. In addition the park will encompass 2 existing buildings which will contain a restaurant, arcade, changing rooms, gift shop and retail space, party rooms and additional indoor amusements. The park will operate from Memorial Day through Columbus Day. In addition the motel on the 521 parcel will operate as a motel in conjunction with the amusement activities. The hours of operation for the amusement devices will be from 9:00AM to dusk.` Review Comments In Relation To The Design Standards As determined by the Building Commissioner, a site upgrade is not required. Committee requests additional landscaping improvements be made where possible to existing parking lot and buffers. 6’ black vinyl chain link fence is proposed. Applicant may install stockade fencing in back section closest to the residential neighborhood. Committee understands that nature of business is temporary so that Design Standards are, in most cases, not applicable. Applicant has indicated that color schemes for inflatables will be simple, likely blue and white. SITING STRATEGIES Sect. 1, Streetscape  Meets Standards, or  Discrepancies: Sect. 2, Tenant Spaces  Meets Standards, or  Discrepancies: Sect. 3, Define Street Edge  Meets Standards, or  Discrepancies: Sect. 4, Shield Large Buildings  Meets Standards, or  Discrepancies: Sect. 5, Design a 2nd Story  Meets Standards, or  Discrepancies: Sect. 6, Use Topo to Screen New Development  Meets Standards, or  Discrepancies: Sect. 7, Landscape Buffers/Screening  Meets Standards, or  Discrepancies: Sect. 8, Parking Lot Visibility  Meets Standards, or  Discrepancies: Sect. 9, Break up Large Parking Lots  Meets Standards, or  Discrepancies: Sect. 10, Locate Utilities Underground  Meets Standards, or  Discrepancies: Sect. 11, Shield Loading Areas  Meets Standards, or  Discrepancies: BUILDING STRATEGIES Sect. 1, Break Down Building Mass – Multiple Bldgs.  Meets Standards, or  Discrepancies: Sect. 2, Break Down Building Mass – Sub-Masses  Meets Standards, or  Discrepancies: Sect. 3, Vary Façade Lines  Meets Standards, or  Discrepancies: Sect. 4, Vary Wall Heights  Meets Standards, or  Discrepancies: Sect. 5, Vary Roof Lines  Meets Standards, or  Discrepancies: Sect. 6, Bring Down Building Edges  Meets Standards, or  Discrepancies: Sect. 7, Vary Building Mat’ls For Depth  Meets Standards, or  Discrepancies: Sect. 8, Use Traditional & Nat’l. Building Mat’ls  Meets Standards, or  Discrepancies: Sect. 9, Incorporate Pedestrian-scaled Features  Meets Standards, or  Discrepancies: Sect. 10, Incorporate Energy-efficient Design  Meets Standards, or  Discrepancies: Next step for applicant:  Go to Site Plan Review  Return to Design Review for Formal Review Read & Received by Applicant(s)