Loading...
HomeMy WebLinkAboutKDW Drainage Calc Comments 121213Williams, Kathleen From:Williams, Kathleen Sent:Thursday, December 12, 2013 1:48 PM To:'Yergatian, Brian'; Anctil, Richie Cc:Healy, Kieran J. Subject:RE: Whitten Landscaping, 20 Commercial Street Page 1 of 1 12/12/2013 Hi Brian, Although drainage and grading are no longer my bailiwick, I would offer the following comments. The way the southern bituminous driveway apron is graded would result in runoff from this area flowing to Commercial Street and I don’t see how it would ever get into the underground infiltration chambers as shown in the Watershed Map. Regrading will be necessary to redirect this impervious area and minimize runoff into the street which is shown as having a very shallow grade. Adequate pre-treatment prior to discharging into the infiltrators is necessary to avoid premature clogging. You may want to locate both catch basins in the grassed area to maximize collection and get some overland flow treatment. You may also want to look at the grading around the building to ensure runoff from the northern and eastern portions of the site flow to the catch basins and away from the building. Thanks, Kathy From:Yergatian, Brian [mailto:byergatian@bscgroup.com] Sent: Thursday, December 12, 2013 12:39 PM To: Anctil, Richie Cc: Healy, Kieran J.; Williams, Kathleen Subject: Whitten Landscaping, 20 Commercial Street Hi Richie, Attached for your review are the proposed conditions hydrological/hydraulic calculations for the proposed development. Please contact me if you have any questions or concerns. Thank you. Brian G. Yergatian, P.E., LEED AP | Project Manager & Associate BSC Group 349 Main Street, Route 28 | West Yarmouth | MA 02673 direct | 617-896-4590 main | 508-778-8919