Loading...
HomeMy WebLinkAboutMGrylls e-mail on ZBA Relief and parking 0214141 Williams, Kathleen From:Grylls, Mark Sent:Friday, February 14, 2014 2:02 PM To:'Daniel A. Ojala PE, PLS'; Williams, Kathleen Cc:Greene, Karen Subject:RE: Lou Seminara SPR- #11 Aarons Way, West Yarmouth- B3 Zone Hi Dan, As you are aware, 11 Aarons Way is a corner lot which are viewed as having two front and two side yards. Per section 301.4.1 of the Zoning Bylaw, all parking is to be located to the side and or rear of the structure. All relief from this requirement will have to be granted from the BOA unless a structure or site work already exist and makes the placement impossible. Are you already scheduled for Design Review? Thank you, Mark Grylls Building Commissioner Town of Yarmouth 508-398-2231 x 1260 From: Daniel A. Ojala PE, PLS [mailto:downcape@downcape.com] Sent: Friday, February 14, 2014 12:22 PM To: Williams, Kathleen Cc: Grylls, Mark; Greene, Karen Subject: Lou Seminara SPR- #11 Aarons Way, West Yarmouth- B3 Zone Kathy, Karen, Mark: Attached please find a PDF of the Site Plan Review/Design Review plan for Lou Seminara. Lou is really hoping that we can work with the alignment shown, parking to “side” with respect to Higgins Crowell Road. Can this be approved by SPR, or will it need ZBA relief to have this alignment? Lou is having a color rendering done, and can provide detail on a planting ridge with grasses to hide the vehicles from view. I can discuss anytime, please call once you have a chance to review, if possible, prior to formal SPR on 2/25/14 at 2:30 PM. (or we would be glad to have an informal meeting prior). Much appreciated, Daniel A. Ojala PE, PLS  down cape engineering, inc.  939 Main St. Yarmouthport, MA  1‐508‐362‐4541 x108  1‐508‐362‐9880 fax  downcape@downcape.com     2