Loading...
HomeMy WebLinkAbout260219_Yarmouth_Grove_ PPT (final)_22108A (2)Yarmouth Stormwater Project Grove Street Permit Hearing – February 19, 2026 April Wobst and Hannah Brown, APCC 1 The Problem Impaired Water Quality: Freshwater and Coastal Untreated Stormwater Contributing Source to Problem Nutrient impairment Bacterial contamination Why Grove Street? Water quality improvement to Lewis Bay and Hyannis Harbor Pavement reduction Improve public access Public education Template for other ways to water Nutrient impairment: High nutrients cause algal and cyanobacteria blooms, which leads to unsafe conditions for aquatic species and humans. Bacterial contamination: Leads to closures of shellfish areas and public beaches 2 Project Overview Short-term Goals: Identify locations across Yarmouth for stormwater management improvement Advance plans for five priority sites through design and permitting to align for construction Long-term Goals: Improve water quality Reduce shellfish bed closures Funded By: 10:05-10:20 3 Project Timeline Completed 2023 4 Yarmouth Stormwater Project Improving Water Quality Presenter Name Grove Street Stormwater Retrofit Public Hearing Yarmouth Conservation Commission MassDEP File No. SE-83-2521 February 19, 2026 *Funding for this work has been provided by Massachusetts Office of Coastal Zone Management Coastal Habitat and Water Quality Grants. 5 agenda Project Goal Existing Conditions/Resource Areas Proposed Conditions Resource Area Impacts 6 Project Goal To improve coastal water quality by reducing or eliminating pollution (bacteria and nitrogen in particular) from stormwater runoff Stormwater runoff can pick up and transfer many different kinds of pollutants. With this project we aim to address and reduce all of these but of particular concern is nitrogen and bacteria. The treatment systems we plan to install will be specifically selected to maximize the amount of nutrients and bacteria removed from runoff. And through education and activities with the public we aim to also reduce the amount of pollution at the source through better stormwater management practices across the community and encouraging reduction in use of fertilizers. 7 10 Original Priority Sites Advanced 5 Sites: HIH-3 Grove Street MC-3 Standish Way-BUILT MC-5 Baker Ave PR-3/4 Lake Rd West UBR-4 Curve Hill Road-BUILT Optional – maybe something APCC should cover 8 10 Priority Sites 2 more sets in Concept Phase: OM-2 & OM-7 Old Main LBPR-1 Wings Grove Beach Optional – maybe something APCC should cover 9 Site Location 10 Existing Conditions Grove Street - public way to water Bordered by residential properties to the east and west Evidence of erosion/accumulated sediment at end of road. Existing Stormwater Infrastructure: a clogged leaching basin Discharges to Hyannis Inner Harbor/Lewis Bay 11 Overall Existing Conditions Total Drainage Area = 0.33 acres Impervious Area = 0.18 ac (55% ) 12 Salt Marsh (blue) Coastal Beach (pink) Coastal Dune (green) 35-ft, 50-ft and 100-ft Buffer Zones to Coastal Dune (yellow) 100-ft Riverfront Area (cyan) Land Subject to Coastal Storm Flowage (LSCSF): Flood Zone VE, EL – 13 (below red) Flood Zone AE, EL – 11 (between red and purple) Resource Areas 13 FEMA FIRMette 14 HIH-3 Grove Street Proposed Conditions DA1A: Total Drainage Area = 0.32 acres Impervious area = 0.17 ac (52% ) Proposed GSI Practice: Bioretention Area DA1B: Total Drainage Area = 0.01 acres No Impervious Area 15 Stormwater Design Components Paved Drainage Flume with Embedded Stone Apron for velocity control Sediment Forebay for pretreatment Forebay Boulder Spillway Bioretention Area Overflow Boulder Spillway directing runoff towards beach Describe how it works, and all the components – and the importance of the weirs (level surface) 16 Bioretention Paved Drainage Flume Sediment forebay pretreatment Forebay Spillway with boulders Bioretention with soil and plants Large storm runoff to Overflow Spillway with boulders 17 Site Amenity Components Educational signage Bike rack Reusing existing split rail fence Sand fence Native vegetation planting Invasive Species Removal Maintain access to water Re-using split rail fencing (within the Velocity Zone) ROMU & CEOR to remove 18 Resource Areas Salt Marsh (blue) Coastal Beach (pink) Coastal Dune (green) 35-ft, 50-ft and 100-ft Buffer Zones to Coastal Dune (yellow) 100-ft Riverfront Area (cyan) Land Subject to Coastal Storm Flowage (LSCSF): Flood Zone VE, EL – 13 (below red) Flood Zone AE, EL – 11 (between red and purple) 19 Coastal Resource Area Impacts 20 Stormwater Design Design Elements Stormwater practice maintains low profile Net reduction in pavement Reusing existing split rail fencing Discuss the velocity zone – change to design Reusing split rail fence (repeat as necessary) 21 Planting Plan Planting Plan Native, salt tolerant species Dune enhancement plantings 22 Resource Area Impacts The proposed project will improve conditions: Project components improve the ability of resource areas to perform their function to protect the interests of the state and local wetland regulations. The project is restorative in nature and will provide an overriding public, environmental, and health benefit through the improvement of the water quality in Hyannis Inner Harbor/Lewis Bay. 23 Thank You! Questions? 24