Loading...
HomeMy WebLinkAboutRio RSP 0821181 Williams, Kathleen From:Rio Sacchetti <RSacchetti@dakotapartners.net> Sent:Tuesday, August 21, 2018 11:23 AM To:Williams, Kathleen Cc:Greene, Karen; Grylls, Mark; Waygan, Mary Subject:RE: YM - kitchen hoods Hi Kathy,    Thank you for the quick review and follow up! I will follow up on those items you mentioned.    Rio     From: Williams, Kathleen <kwilliams@yarmouth.ma.us>   Sent: Tuesday, August 21, 2018 11:10 AM  To: 'Rio Sacchetti' <RSacchetti@dakotapartners.net>  Cc: Greene, Karen <KGreene@yarmouth.ma.us>; Grylls, Mark <mgrylls@yarmouth.ma.us>; Waygan, Mary  <MWaygan@yarmouth.ma.us>  Subject: RE: YM ‐ kitchen hoods     Hi Rio,     The chairman of the Design Review Committee (DRC) did not feel the changes were significant enough to require  formal review by the DRC.  You will need to submit revised mechanical plans with the Building Department.  You  should also check with Mary Waygan to be sure everything is okay with the Affordable Housing Trust.     Thanks,  Kathy     ----------------------------------------  Kathy Williams, PE  Yarmouth Town Planner  1146 Route 28  South Yarmouth, MA 02664-4492  (508) 398-2231 Ext 1276  kwilliams@yarmouth.ma.us       From: Rio Sacchetti [mailto:RSacchetti@dakotapartners.net]   Sent: Thursday, August 16, 2018 12:52 PM  To: Williams, Kathleen <kwilliams@yarmouth.ma.us>  Cc: Greene, Karen <KGreene@yarmouth.ma.us>; Grylls, Mark <mgrylls@yarmouth.ma.us>; Waygan, Mary  <MWaygan@yarmouth.ma.us>  Subject: RE: YM ‐ kitchen hoods     Hi Kathy,    Following up on the below emails and our call yesterday. We’d like to replace the recirculating kitchen hoods with  2 vented hoods to meet both EnergyStar standards and the recommendations of StepOne / Resolution Architects, the  design and construction advisor for the financing parties (Town of Yarmouth, MA DHCD, Bank of America, and  Massachusetts Housing Partnership). The project architect, Khalsa Design, looked at the venting options through the  side walls and/or the roof and their preferred approach is to vent through the side walls. Khalsa Design were able to  locate areas that worked for venting while having very minimal impact to the exterior. Attached is an elevation  showing the proposed venting locations on the buildings. Could you review the sketch elevations and let us know if  this approach would be acceptable to the Town and if it would still need to go through the DRC?     Some notes:      There would be 4 vents on the ends of the buildings as shown on the attached sketch elevation. Building “B”  which is 3 stories would have 6 instead of 4. All other vents would be placed on the 5’‐0” indents along the  façade on side walls. No vents would be direct facing Route 28 or the long sides of buildings.    The Vents would penetrate the siding, not trim. Vents would be affixed to a cellular PVC plinth block,  roughly 5” x 5”. Both the plinth block and vent cover would be painted to match the siding color.      I will follow up with a cut sheet on the proposed vent cover.     Thank you for your consideration,     Rio                 Please note I have a new telephone extension X 101     ‐‐                            From: Rio Sacchetti <RSacchetti@dakotapartners.net>   Sent: Tuesday, July 31, 2018 11:24 AM  To: 'Williams, Kathleen' <kwilliams@yarmouth.ma.us>; 'Waygan, Mary' <MWaygan@yarmouth.ma.us>  Cc: 'Greene, Karen' <KGreene@yarmouth.ma.us>; 'Grylls, Mark' <mgrylls@yarmouth.ma.us>  Subject: RE: YM ‐ kitchen hoods     3 Hi Kathy,     Thank you for the information. Venting through the roof seems to be the best approach from a process perspective.  I will circle back with the design team and be in touch.    Thank you,    Rio           ‐‐                From: Williams, Kathleen <kwilliams@yarmouth.ma.us>   Sent: Monday, July 30, 2018 10:54 AM  To: Waygan, Mary <MWaygan@yarmouth.ma.us>; 'Rio Sacchetti' <RSacchetti@dakotapartners.net>  Cc: Greene, Karen <KGreene@yarmouth.ma.us>; Grylls, Mark <mgrylls@yarmouth.ma.us>  Subject: RE: YM ‐ kitchen hoods     Hi Rio,     Mandatory compliance with the Design Review Committee (DRC) is required for this to be a by‐right project.  If there  is the option of going through the roof and avoid impacts to the building facades, I would think the DRC would  prefer that option.   Except for the end units, all the kitchens are located in the center of the building.  If you want to  pursue vents out the side of the building, you would need to develop revised elevations showing the impacts to the  facades, cut sheets on the exterior vent and a DRC application (see attached)  We would then schedule the meeting,  pending quorum.  If venting through the roof is not visible, then they would not need to come back before the DRC.    Thanks,  Kathy     ----------------------------------------  Kathy Williams, PE  Yarmouth Town Planner  1146 Route 28  South Yarmouth, MA 02664-4492  (508) 398-2231 Ext 1276  kwilliams@yarmouth.ma.us    4    From: Waygan, Mary   Sent: Monday, July 30, 2018 10:23 AM  To: 'Rio Sacchetti' <RSacchetti@dakotapartners.net>  Cc: Williams, Kathleen <kwilliams@yarmouth.ma.us>; Greene, Karen <KGreene@yarmouth.ma.us>; Grylls, Mark  <mgrylls@yarmouth.ma.us>  Subject: RE: YM ‐ kitchen hoods     Hi Rio,     Yes – this would need a review by the Design Review Committee. Kathy Williams is your contact.      Mary         From: Rio Sacchetti [mailto:RSacchetti@dakotapartners.net]   Sent: Friday, July 27, 2018 3:32 PM  To: Waygan, Mary <MWaygan@yarmouth.ma.us>  Subject: YM ‐ kitchen hoods     Hi Mary,    We’re looking at options to upgrade the kitchen hoods at Yarmouth Commons from recirculating range hoods to  venting range hoods. The venting hoods would need to be vented out to the exterior and I wasn’t sure if the Town  had any requirements against venting out the side versus the roof. Who do you think is the best person for me to  reach out to? Kathy Williams?     Thank you,        ‐‐