Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
792-792-179 (1)
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:8/4/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 7/28/2026 Time Cast: 11:20 AM Date Received: 7/29/2026 Placement Location:SBR #3 COLUMNS Placement Method:PUMP Cylinders Made By:Alexander Charnitsky Material Type:Concrete Cylinders Placement Vol. (yd ):79 Aggregate Size (in):3/4 Cylinder Size:4" x 8" INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:SIKA 75 TEST RESULTS Slump (in) (C-143):8 1/2 Air Content (%) (C-231):3.3 Air Temp (°F):68 Conc. Temp (°F) (C-1064):82 Load Number:8 Mixer Num.:58 Ticket Num.:36634 Cubic Yards:10 Design (psi):4500 Batch 10:25 AM Arrive 11:05 AM Depart 12:40 PM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-179A N 8.65 4.02 12.69 8/4/2026 Lab Unbonded 7 5 57.22 4510 792-179B 8/11/2026 Lab 14 792-179C 8/25/2026 Lab 28 792-179D 8/25/2026 Lab 28 792-179E HOLD Lab 3 2 Remarks:Kaylie O'Sullivan Reviewed By