Loading...
HomeMy WebLinkAboutCCOR 08-04-2026 792-184Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:8/4/2026 Client:Wright-Pierce Client Rep:Rayssa FonteWeather:Clear 70 - 76°F S.W.COLE Rep:Caleb Drinan General Contractor:Nickerson General Contractors Time Onsite:07:24 - 09:20 Placement Type: Footing  Wall  Slab  Other: ColumnPlacement Location:Process Building Northwest and Southeast Footings East Columns Concrete Placement Observations Observed Comments Required mix used Yes 4500 psi 1-1/2" aggregate Concrete properly conveyed to all areas of placement Yes Pump truck was used Internal vibration / consolidation of concrete Yes Vibrator was used for consolidation of concrete Even layering around openings and embedments Yes Concrete was evenly layered around openings and embedments Post placement observations (finishing, curing, etc.)Yes Concrete was finished manually Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-184  *Refer to associated concrete test report Notes: As requested by Wright-Pierce, S.W. COLE rep was onsite to perform concrete observation, field testing, and sampling at the referenced location.  The S.W. COLE rep Caleb Drinan arrived onsite at approximately 7:24 AM and met with a representative of Wright-Pierce.  Concrete for this placement was supplied by Cape Cod Ready Mix. The approved mix design indicated a design compressive strength of 4,500 psi with a 1-1/2-inch nominal maximum aggregate size. A total of approximately 25 cubic yards of concrete was reportedly ordered for this placement.  Concrete placement activities were observed, and field testing and sampling were performed as requested.  Concrete field tests and samples were obtained from the first delivery truck during discharge.  Observed field test results were as follows:  Slump: 7.5 inches  Air Content: 4.5 percent  Concrete Temperature: 80°F  One set of five (5) concrete compressive strength test cylinders was cast from the first load for laboratory testing. The cylinders were designated for one (1) 7-day break, one (1) 14-day break, two (2) 28-day breaks, and one (1) cylinder to be held in reserve.  The cylinders were molded, cured, and will be transported to the laboratory in general accordance with applicable ASTM standards.  Prior to departing the site at approximately 9:20 AM, the S.W. COLE rep, Caleb Drinan, verbally communicated the observed field test results and general observations to Rayssa Fonte of CDM-Smith and a representative of Wright-Pierce.  Attachments: 3 Photos Reviewed by:8/5/2026 Kaylie O'SuivKaylie O'Sullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Footings pre pour Footings post pour Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Columns during pour