Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
792-792-182
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:8/6/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 7/30/2026 Time Cast: 12:50 PM Date Received: 7/31/2026 Placement Location:PROCESS BUILDING FOOTING Placement Method:Direct Discharge Cylinders Made By:Riley Nordahl Material Type:Concrete Cylinders Placement Vol. (yd ):10 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures: TEST RESULTS Slump (in) (C-143):7 3/4 Air Content (%) (C-231):3.5 Air Temp (°F):68 Conc. Temp (°F) (C-1064):78.2 Load Number:1 Mixer Num.:80 Ticket Num.:53102 Cubic Yards:10 Design (psi):4500 Batch 12:30 PM Arrive 12:40 PM Depart 1:15 PM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-182A N 29.5 6 28.32 8/6/2026 Lab Unbonded 7 5 150.77 5330 792-182B 29.15 8/13/2026 Lab 14 792-182C 29.25 8/27/2026 Lab 28 792-182D 29.15 8/27/2026 Lab 28 792-182E 29.30 HOLD Lab 3 2 Remarks:Kaylie O'Sullivan Reviewed By