HomeMy WebLinkAboutCCOR 08-10-2026 792-82Concrete Construction Observation Report
The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control.
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com
Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:8/10/2026
Client:Wright-Pierce Client Rep:Rayssa FonteWeather:Clear 70 - 85°F S.W.COLE Rep:Riley Nordahl
General Contractor:CDM Smith Time Onsite:06:25 - 09:00
Placement Type: Footing Wall Slab OtherPlacement Location:Process Building Lower Staircase
Concrete Placement Observations Observed Comments
Required mix used Yes 4500 psi, 3/4", Sika Control 75
Concrete properly conveyed to all areas of placement Yes Concrete was directly conveyed using a pump truck
Internal vibration / consolidation of concrete Yes Concrete was consolidated with a handheld vibrator
Even layering around openings and embedments Yes Concrete was evenly layered around openings and
embedments
Post placement observations (finishing, curing, etc.)Yes Concrete was manually finished with a trowel
Field Testing of Concrete performed:Yes
*CYLINDER SET NO:792-82 *Refer to associated concrete test report
Notes:
As requested by Wright-Pierce, S.W. Cole representative Riley Nordahl was onsite to perform
concrete field-testing services associated with the referenced concrete placement.
S.W. Cole Engineering Construction Services Technician Riley Nordahl arrived onsite at
approximately 6:25 AM.
Upon arrival, the S.W. Cole representative met with Rayssa Fonte of CDM Smith, who provided
an overview of the planned work activities for the day.
Concrete was supplied by Cape Cod Ready Mix and was reported to consist of 3/4-inch
nominal maximum aggregate, 4,500-psi concrete with Sika Control 75 admixture.
Approximately 4 cubic yards of concrete were placed during the observation period.
Concrete samples used for field testing and fabrication of compressive-strength test
specimens were obtained from Load No. 1. Field-testing services were performed in
general accordance with applicable ASTM test procedures.
Concrete test specimens were fabricated for compressive-strength testing at 7-day, 14-day,
and three 28-day intervals. One additional specimen was retained as a hold sample.
Field Test Results – Load No. 1
Slump: 3 inches
Air Content: 3.5%
Concrete Temperature: 81°F
Concrete Construction Observation Report
The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control.
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com
The measured concrete properties were reported to be within the project-specified
acceptance criteria.
Observations and field-test results were verbally communicated to Rayssa Fonte of CDM Smith
while onsite.
Upon completion of the requested services, the S.W. Cole representative departed the site at
approximately 9:00 AM.
Attachments: 2 Photos Reviewed by:8/11/2026 Kaylie O'Su iv Kaylie O'Sullivan
Concrete Construction Observation Report
The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control.