HomeMy WebLinkAboutCCOR 08-10-2026 792-82Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:8/10/2026 Client:Wright-Pierce Client Rep:Rayssa FonteWeather:Clear 70 - 85°F S.W.COLE Rep:Riley Nordahl General Contractor:CDM Smith Time Onsite:06:25 - 09:00 Placement Type: Footing  Wall  Slab  OtherPlacement Location:Process Building Lower Staircase Concrete Placement Observations Observed Comments Required mix used Yes 4500 psi, 3/4", Sika Control 75 Concrete properly conveyed to all areas of placement Yes Concrete was directly conveyed using a pump truck Internal vibration / consolidation of concrete Yes Concrete was consolidated with a handheld vibrator Even layering around openings and embedments Yes Concrete was evenly layered around openings and embedments Post placement observations (finishing, curing, etc.)Yes Concrete was manually finished with a trowel Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-82  *Refer to associated concrete test report Notes: As requested by Wright-Pierce, S.W. Cole representative Riley Nordahl was onsite to perform concrete field-testing services associated with the referenced concrete placement.  S.W. Cole Engineering Construction Services Technician Riley Nordahl arrived onsite at approximately 6:25 AM. Upon arrival, the S.W. Cole representative met with Rayssa Fonte of CDM Smith, who provided an overview of the planned work activities for the day. Concrete was supplied by Cape Cod Ready Mix and was reported to consist of 3/4-inch nominal maximum aggregate, 4,500-psi concrete with Sika Control 75 admixture. Approximately 4 cubic yards of concrete were placed during the observation period. Concrete samples used for field testing and fabrication of compressive-strength test specimens were obtained from Load No. 1. Field-testing services were performed in general accordance with applicable ASTM test procedures. Concrete test specimens were fabricated for compressive-strength testing at 7-day, 14-day, and three 28-day intervals. One additional specimen was retained as a hold sample. Field Test Results – Load No. 1 Slump: 3 inches Air Content: 3.5% Concrete Temperature: 81°F Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com The measured concrete properties were reported to be within the project-specified acceptance criteria. Observations and field-test results were verbally communicated to Rayssa Fonte of CDM Smith while onsite. Upon completion of the requested services, the S.W. Cole representative departed the site at approximately 9:00 AM. Attachments: 2 Photos Reviewed by:8/11/2026 Kaylie O'SuivKaylie O'Sullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com