HomeMy WebLinkAboutCCOR 08-06-2026 792-185Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:8/6/2026 Client:Wright-Pierce Client Rep:Rayssa FonteWeather:Mostly Cloudy 67 - 73°F S.W.COLE Rep:Alexander Charnitsky General Contractor:Nickerson Time Onsite:09:30 - 14:00Placement Type: Footing  Wall  Slab  Other Placement Location:SBR Exterior Walls on Slabs 22 & 23 Concrete Placement Observations Observed Comments Required mix used Yes 4,500 Psi, 1 1/2, Sika 75 Concrete properly conveyed to all areas of placement Yes Pump Truck Internal vibration / consolidation of concrete Yes Handheld vibrator Even layering around openings and embedments Yes Concrete evenly layered and vibrated around openings and embedments Post placement observations (finishing, curing, etc.)Yes Concrete Manually Finished Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-185  *Refer to associated concrete test report Notes: As requested by Wright-Pierce, S.W. COLE rep was onsite to perform concrete sampling and concrete testing at the locations referenced above. S.W. COLE rep Alex Charnitsky arrived onsite at approximately 9:30 AM to perform the requested services. S.W. COLE rep observed concrete placement during the sampling and testing activities. Concrete Delivery Truck 24, Load 1, arrived onsite carrying approximately 11 cubic yards of 4,500-psi concrete containing 1½-inch aggregate. Project personnel added Sika 75 admixture to the concrete prior to placement. The contractor placed the concrete via pump truck. Approximately 92 cubic yards of concrete were placed during this visit. One set of field tests was performed on sampled concrete and yielded the following results: Truck 24 – Load 1 Slump: 6.5 inches Air Content: 3.1% Concrete Temperature: 80°F Laboratory compressive strength test results will be reported separately upon completion of testing. One set of 6×12-inch compression test cylinders was fabricated for laboratory testing at 7, 14, and 28 days (two cylinders), along with two additional hold cylinders. Test results and observations were verbally reported to the onsite client representative, Rayssa Fonte, while onsite. Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com S.W. COLE rep departed the site at approximately 2:00 PM after completing the requested services. Attachments: 2 Photos Reviewed by:8/11/2026 Kaylie O'SuivKaylie O'Sullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com