HomeMy WebLinkAboutApproved Site Plan 8.7.2026E-IDE-D Dnl I AAAIAITE-AI Ah/017 AInTE-C`.
PNO
3
CONSTRUCTION NOTES:
1. FIBER ROLLS SHALL BE MAINTAINED OVER TIME. INSPECT FIBER ROLLS EACH
SPRING OR AFTER ANY MAJOR STORM EVENT.
2. ANY LOOSE ROLLS SHALL BE RESECURED. ANY ROLLS WHICH HAVE BEEN SEVERELY
DAMAGED SHALL BE REPLACED AND REPLANTED.
3. MAINTAIN SOIL COVER OVER FIBER ROLLS.
4. REFER TO PLANTING PLAN BY LYNNE HAMLYN CONSULTING FOR PLANT SPECIES,
SOIL COVER, AND PLANT MAINTENANCE.
5. WHEN THE PLANTINGS BECOME STABILIZED SATISFACTORILY, THE FIBER ROLLS CAN
BE ALLOWED TO DEGRADE AND COMPOST. HOWEVER, PLANTINGS SHALL BE
MAINTAINED OVER TIME AFTER THAT.
6. MINOR ONGOING MAINTENANCE IS ALLOWED. IF MORE THAN 50% OF THE FIBER
ROLL ARRAY IS DAMAGED, THE CONSERVATION AGENT SHALL BE NOTIFIED BEFORE
RESTORATION IS STARTED.
ACCESS AND -
LIMIT OF WORK
(2) 3" X 8" P.T. CAP;
W/ Y2" GALV. BOLTS
0 3' O.C. (TYP)
12" GALV. LAG BOLTS
0 3' O.C. (TYP) (ALTERNATE
2"x8" WITH CAP 7HRU-BOLTS (TYP)
(2) 3" X 6" P.T. CAP
M 00 0
2"x8" 2X X SUPPORTS; W/ )C GALV.
`14 BOLTS 0 3' O.C. (TYP)
2"x8" SHOREGUARD CL 9900
SHEETING (TYP)
CAP TOP VIEW (ALTERNATE) CAP TOP VIEW
BULKHEAD CAP DETAIL
R
2" x 4" BALLUSTI
4" SPACING (1
4" x 4" RAILING
SUPPORT POSTS (TYI
" THROU
BOLTS (TY
2" x 12" STAIR
STRINGERS (TYP,
SEE NOTE 13
POST CAP (TYP)
" RAILING
HEIGHT
" X 6-DECKING, SPACE
IETWEEN DECK BOARDS (TYP)
2" x 4" TREAD SUPPORTS;
THROUGH BOLTED INTO
STRINGER (TYP)
2" x 12" STAIR TREADS (TYP),
;(2) 2" X 6" OPTIONAL)
; It
STAIR SECTION FRONT VIEW DETAIL
5 4 5 10 20
mmmmmmmni
DCE ##24-333 SCALE: 1"=10'
N/F
MAP 1 1 1, PARCEL 29
PAUL PECORARO
156 BLUE ROCK ROAD
SOUTH YARMOUTH, MA 02664
PROPOSED Y" THRU-BOLTS;
2' O.C. (TYP)
PROPOSED CHANCE HELICAL
ANCHORS; 6' SPACING, (TYP)
6't
BULKHEAD PLAN VIEW DETAIL
1 .5 0 1 2 4
" THROUGH
BOLTS (TYP)
4" x 4" SUPPOR
POSTS; EMBED
MINIMUM (TYF
2"
2" x 8" FLOOR
16" O.C., WITH
u
!J
STAIR SECTION ELEVA TION DETAIL
5 Q 5 10 20
SCALE: 1 "=10'
Rpv'L L �
� 2 Np'tE
�sEE
o �®
RED'
0E REM
�PNp�Np
8 XSZ pJRS
0�
PRppCjsV NEP -�U �5'� (50
U 5'
1880N a� 10 QF i
CITE- (7I AA/ E-VICTIAIn AAIn nnnnnC`/-n
SCALE: 1 "=20'
RESOURCE AREA TABLE
TOTAL LOT SIZE = 35284+/- SO. FT. (DEED
AREA WITHIN _THE _-OO'__RIVERFRONT AREA = 14.920f SO. FT.
AREA WITHIN THE 100'-200' RIVERFRONT AREA = 15.669t $0. FT.
WORK WITHIN 100' RIVERFRONT AREA
EXISTING 540t SQ. FT. (EXISTING STAIRS)
PROPOSED = STAIRS; NO CHANGE; PROPOSED BACKFILL = 1,300f
SQ. FT.
STRUCTURES WITHIN THE 0'-35' BUFFER OF COASTAL BANK
EXISTING = 2,320f SQ. FT.
PROPOSED =NO CHANGE
STRUCTURES WITHIN THE 35'-50' BUFFER OF COASTAL BANK
EXISTING = 968f SQ. FT.
NO CHANGE PROPOSED
STRUCTURES WITHIN THE 50'-100' BUFFER OF COASTAL BANK
EXISTING = 305f SQ. FT.
PROPOSED = NO CHANGE
30.0(
20.0(
10.O(
0.0(
-10.0(
-20.0(
04
1. THE SCOPE OF WORK FOR THIS PROJECT IS TO REPLACE THE EXISTING PERMITTED BULKHEAD, AND RECONSTRUCT THE PREVIOUSLY LICENSED PIER, RAMP, AND FLOAT TO CURRENT /-
STANDARDS. THE BULKHEAD WILL BE EXTENDED ALONG THE WATERFRONT FOR A TOTAL LENGTH OF 136'f. NEW RETURNS ARE PROPOSED TO PREVENT FLANKING. IN ADDITION, THE EXISTING
ACCESS STAIRS WILL BE REBUILT IN KIND, WITH THE RISE AND RUN ADJUSTED TO MAINTAIN 18" OF CLEARANCE TO THE UNDERLYING VEGETATION. THE LANDINGS SHALL BE REBUILT IN ROL
THEIR SAME LOCATION AND HEIGHT.
2. THE RISE AND RUN FOR THE PROPOSED STAIRS IS APPROXIMATE; ALL DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED IN THE FIELD WITH SHOREFRONT CONSULTING PRIOR TO
CONSTRUCTION OF THAT PHASE.
Btu c Id ° [c
3. ELEVATIONS REFER TO NAVD 88. CONTACT DOWN CAPE ENGINEERING FOR ADDITIONAL ELEVATION INFORMATION AS NEEDED.
4. CONSTRUCTION ACCESS SHALL BE VIA THE ACCESS ROUTE SHOWN ON THE PLAN AND DIRECTLY OVER THE APPLICANT'S PROPERTY.
S
5. THE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH THE INSTALLATION OF THE PROPOSED WORK. EQUIPMENT AND MATERIALS HANDLING SHALL BE IN ACCORDANCE WITH ~ �O Erl p°in
THE WORK PROTOCOL SUBMITTED WITH THE NOTICE OF INTENT, THE RESULTING ORDER OF CONDITIONS AND AS DIRECTED BY THE YARMOUTH CONSERVATION AUTHORITIES. 0°1
6. THE BULKHEAD INSTALLATION SHALL BE ACCOMPLISHED FROM A WORKING BARGE AS MUCH AS PRACTICAL. THE REMAINDER OF WORK SHALL BE ACCOMPLISHED BY HAND. AT NO TIME SHALL
THE WORKING BARGE COME IN CONTACT WITH THE RIVER BOTTOM. i1
7. MATERIALS AND EQUIPMENT SHALL BE STORED ON THE APPLICANT'S PROPERTY OR THE WORKING BARGE DURING TIMES OF HIGH TIDE AND WHEN NOT IN USE. WORKING BARGE TO BE Ni h B
ANCHORED TO AVOID BOTTOMING OUT DURING PERIODS OF LOW TIDE.
01
8. PILES SHALL BE DRIVEN BUTT END FIRST TO THE DEPTHS SPECIFIED ON THE PLAN. IF DESIGN EMBEDMENT CAN NOT BE REACHED, SHOREFRONT CONSULTING SHALL BE CONTACTED BEFORE
PROCEEDING. PILES SHALL BE MECHANICALLY DRIVEN.
9. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RETURNED TO THEIR PRE -CONSTRUCTION CONDITION. ALL WORK SHALL BE INSPECTED BY SHOREFRONT CONSULTING AND RECEIVE LOCUS M A P
APPROVAL BEFORE REMOVING EQUIPMENT FROM THE SITE.
SCALE 1 "=2000'f
10.
THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTORED TO RESEMBLE THE PRE -CONSTRUCTION CONTOURS AND CONDITIONS.
LEGEND
11.
THE CONTRACTOR SHALL OBTAIN A COPY OF THE ORDER OF CONDITIONS ISSUED FOR THE PROJECT BY THE YARMOUTH CONSERVATION COMMISSION PRIOR TO THE START OF ANY WORK.
MHW _w._
MEAN HIGH WATER
12.
ALL HARDWARE SHALL BE GALVANIZED OR STAINLESS STEEL, UNLESS OTHERWISE APPROVED BY OWNER OR SHOREFRONT CONSULTING.
MLW
MEAN LOW WATER
13.
CLEAN SAND FILL SHALL BE USED BEHIND THE BULKHEAD.
2
ELEVATION CONTOUR
14.
VINYL SHEETING SHALL BE SHOREGUARD CL-9900, OR EQUAL, WITH A MINIMUM SECTION MODULUS OF 20. SHEETING SHALL BE 20-FOOT LONG SHEETS, AND SHALL BE DRIVEN TO THE
PROPERTY LINE
FULL DEPTH WITH MINIMUM CUTOFF. IF DESIGN EMBEDMENT CAN NOT BE REACHED, SHOREFRONT CONSULTING SHALL BE CONTACTED BEFORE PROCEEDING.
"PLAN
LIMIT OF WORK/ACCESS
15.
REFER TO STRUCTURAL DRAWING ENTITLED SHOWING 10' ENGINEERED VINYL BULKHEAD", BY SHOREFRONT CONSULTING, AND STAMPED BY MARK MCKENZIE, P.E., DATED 12/12/12 FOR
BULKHEAD DETAILS. THE CL9900 SHEETING SHALL BE UTILIZED TO REPLACE THE CL9000 MATERIAL WHICH IS NO LONGER AVAILABLE. THE CL9900 HAS A SECTION MODULUS OF 20 WHERE
SURVEY NOTES.
THE CL9000 HAD A SECTION MODULUS OF 16.4; THEREFORE, THE CL9900 IS A SUITABLE REPLACEMENT AND SHALL BE USED. THE DESIGN ANCHOR SPACING IS 7' WHERE 6' WILL BE
USED. ALL OF THE CHANGES ARE MORE CONSERVATIVE FROM THE ORIGINAL THE DESIGN.
RECORD ❑WNERI
16.
REFER TO THE PLANTING PLAN AND MONITORING PROTOCOL BY LYNNE HAMLYN CONSULTING. SUBSTITUTIONS CAN ONLY BE MADE WITH CONSERVATION APPROVAL.
BLUE ROCK ROAD REALTY TRUST
BLBLURA F. RIROADCCIO, TRUSTEE
185 SYCAMORE DR
/r�\17.
NORTH END OF WALL SHALL TERMINATE 10 FFET FROM THE PROPERTY LINE. PROVIDE A FIBER ROLL "SOFT RETURN" ON THE NORTH END AS SHOWN. FIBER ROLLS SHALL BE 20" DIAMETER,
WESTW❑❑D, MA 02090
AND ANCHORED.
ASSESSORS MAP 101, PARCEL 158
18.
THE EXISTING STAIRS ARE PERMITTED AND SHALL FIRST BE REPAIRED FOR USE IN THE SUMMER OF 2026. THE ENTIRE STAIRCASE WILL BE RECONSTRUCTED OFF SEASON AT A LATER DATE.
DEED CETIFICATE #161469
19.
THE ENTIRE STAIR RECONSTRUCTION SHALL INCLUDE A 8'x1O' LANDING ON TOP OF THE WALL, WITH NEW ACCESS STAIRS TO THE BEACH.
LAND COURT PLAN #32679-B, SH
7, LOT 91
20.
RISE, RUN, AND STAIR RUNS ARE APPROXIMATE. VERIFY ALL DIMENSIONS AND LAYOUT IN THE FIELD PRIOR TO CONSTRUCTION.
PROPERTY LIES WITHIN RESIDENTIAL
ZONE R40.
PROPERTY LINES DEPICTED HEREON
ARE BASED ON A
21.
NEW BULKHEAD SHALL BE INSTALLED AS FAR LANDWARD AS POSSIBLE, TOP OF WALL SHALL BE ELEVATION 5.5', WITH ONE 20-INCH FIBER ROLL ON TOP.
FIELD SURVEY BY DOWN CAPE ENGINEERING
IN APRIL,
EXISTING GRADE
TOP OF SCARP -
EXISTING SCARP -"
BOTTOM OF COASTAL BANK f
S.S. CABLE ANCHORS; DB 68 ---- ,<
OR EQUAL; (ANCHOR EVERY 3
COVER FIBER ROLLS WITH COMPATIBLE MATERIAL
AND PLANT IN ACCORDANCE WITH THE PLANTING
PLAN PROIVED BY LYNNE HAMLYN CONSULTING
1.5
Q 1 COVER WITH 90OG COIR MATTING
AND COMPATABLE SOIL
�- - PROPOSED 20" DIAM.,
`---___ 10 20' LONG FIBER ROLLS
FT.); EMBED 5' MINIMUM INTO " 3/8" STAINLESS STEEL CABLE;
UNDISTURBED SOIL. SLEEVE IN FLEXIBLE HOSE TO
PREVENT CHAFFING FIBER ROLLS
FIBER ROLL RETURN DETAIL
2.5 0 2.5 5 10
SCALE: 1 "=5'
COASTAL
BEACH
COASTAL BANK
PROPOSED GRADE
BACK FILL SALL BE 6" BELOW T.O.W.
TOP OF WALL SHALL BE NO MORE
THAN 10' ABOVE EXISTING GRADE
e PROPOSED CAP; SEE DETAIL
20' MINIMUM EMBEDMENT BEHIND EXISTIN PROPOSED CONT. GREENHEART
GRADE; ANCHOR SHALL DEVELOP 18K MIN. 8"x8" AN HOR WALE
PROPOSED CONT. P.T.
2" X 6" BACK WALE
1'
X
NEW 1 1/2"0 CHANCE HELICAL SCREW ANCHOR
TYPE S55 1h" X 5' WITH 8" & 10" FLIGHTS EXISTING GRADE``
@ 7'-0" O.C. MINIMUM ANCHOR PENETRATION
SHALL BE 20', AND DEVELOP 18 KIPS MINIMUM PROPOSED SHOREGUARD CL 9900
ANCHOR FORCE PER ANCHOR TT
VINYL SHEETING, 20 FEET LONG
BULKHEAD ELEVATION DETAIL
2'f
1"0 THREADED 1" DOCK WASHERS
ROD ADAPTER
2.5 0 2.5 5 10
SCALE: 1 "=5'
LAND UNDER OCEAN
0.00
------ _ EXISTING CONCRETE
� J ESTiMA'T€D_`RtS€ - 1l25`-
ALK TO REMAIN 'C0'-�-`"
ESTIMATED RUN = 10"
_ ALL DIMENSI-ONS,-UAYO'Ui,_RISE_-
AND RUN TO BE CONFIRMED
EXISTING GRADE PRIOR TO CONSTRUCTION
PROPOSED RECONSTRUCTED
STA RmOT-S AND LANDINGS. LANDING
HIEGHT TO MATCH EXISTING.
7'f�-I LANDING LENGTHS AS NOTED FOR
18 MIN.
3
EXISTING STAIRS
AND LANDINGS
2
- PROPOPOSED 8'x10' LANDING
_ - _ . _ _�
3 FILL TO RESTORE GRADE AND REPLANT ---� " AND ACCESS STAIRS
STABILIZE -TWO SCARPS; ONE ON
THE SOUTH END AND ONE ON THE
NORTH END OF THE -PROPERTY REFER _ _ _ ____.______._ _. _ ___ _ _ _._.
( FLOOD ZONE AE (EL. 11')
TO PLANTING PLAN
PROPOSED 20" DIAM., 10'-20' LONG FIBER ROLLS R E.,,D -WIDE
11
NOTE; PROPOSED GRADE BEHIND BULKHEAD BEACH ACCESS STAIRS
i AREA BEHIND-SUEKF[UD = E RETOREE---TO MATCH UPPER. R IN A A IBEACH
LENGTH OF FILL 142 FEET SLOPE TO PREVENT SLUMPING; EROSION 8.9f SQUARE FEET X 136 FEET =
_= ___-ESTIMATED AMOUNT: _01 ...ftt(=-TO BIT --
OF_.. _... _
VOLUME FILL = 131 YARDS NOT INCLUDING FILLING IN OF
�_
SCARPS. TOTAL ESTIMATED FILL 200± CURIC YARDS APPROXIMATELY 200 CUBIC YARDS. 11
.MLW -- -1.5'
Existing 52't TIM9FP 91.11_KHFAD TO PROP. RECONSTRUCTED - MLW = -
_.. _ D_.LENGTHENE
36'f. HEIGHT SHALL BE 5.5'. BASE_ as EXISTING GRADE
SEC TI�I V - . _..OF SHEETING TO BE ASAR� ---- ---
/`i
LANDWARD AS POSSIBLE ALONG ITS
LENGTH.
5 10 20 PROPOSED LANDING SUPPORT
PILES 8 0, 20'f LONG (4TOTAL)
00.00
n+9. nn n+Pin nn n4-7r, nn 1.-n nn 1�'�r, nn
2020 AND COMPILED FROM PLANS ON RECORD RECORDED
IN THE BARNSTABLE COUNTY REGISTRY OF DEEDS.
PARCEL APPEARS TO LIE WITHIN FLOOD ZONE AE (EL. 11'
NAVD 88) PER FIRM PANEL #583 OF 875, COMMUNITY MAP
NUMBER 25001CO583J EFFECTIVE DATE JULY 16, 2014 AS
SHOWN ON THE FEMA ON-LINE DATA BASE.
DATUM FOR ALL ELEVATIONS = NAVD 88
MEAN HIGH WATER = 1.6' NAVD 88
MEAN LOW WATER = -1.5' NAVD 88
THE PROJECT IS NOT WITHIN AN NHESP BOUNDARY AND
IS THEREFORE NOT SUBJET TO MESA REVIEW
BEACH NOURISHMENT PROTOCOL
1. BEACH NOURISHMENT SHALL BE IMPLEMENTED USING A TRIGGER
POINT PROTOCOL.
2. THE BULKHEAD SHALL BE MARKED TO INDICATE THE BEACH
ELEVATION AT THE TIME OF INSTALLATION. IF/WHEN THE BEACH
DROPS 6 INCHES IN OVERALL ELEVATION, THEN A RENOURISHMENT
EFFORT OF 45 CUBIC YARDS SHALL BE IMPLEMENTED.
3. THE BEACH ELEVATION SHALL BE MEASURED EACH YEAR, AT THE
SAME TIME THE PLANTINGS ARE INSPECTED. THE BEACH ELEVATION
SHALL BE INCLUDED IN THE ANNUAL REPORT. CALCULATIONS
INDICATE THAT IF THE BEACH DROPS AN AVERAGE OF 6 INCHES
ALONG ITS LENGTH, THEN 45 CUBIC YARDS OF COMPATIBLE SAND
SHALL BE PLACED ALONG THE BASE OF THE BULKHEAD TO BE
TAKEN AS WAVE ENERGY ALLOW. NOURISHMENT IS NOT TO BE
SPREAD OVER THE BEACH AREA; ONLY PLACED UP AGAINST THE
SEAWALL AND COMPACTED SO THAT THE NOURISHMENT CAN BE
TAKEN MORE GRADUALLY OVER TIME.
4. NOURISHMENT CAN BE PLACED WITH A "CHUTE" OVER THE BANK IN
THE TWO ACESS AREAS SHOWN, OR FROM A WORKING BARGE.
WORKING BARGE SHALL NOT BE GROUNDED AT ANY TIME.
5. PHOTOS SHALL BE TAKEN BEFORE AND AFTER EACH NOURISHMENT
ZPYOW-AWD INCLUDED IN THE REQUIRED ANNUAL REPORT.
NO PART OF THIS DRAWING MAY BE USED BY ANY
'�Q PARTY WITHOUT THE EXPRESS WRITTEN CONSENT OF
SHOREFRONT CONSULTING AND
DOWN CAPE ENGINEERING, INC.
awl
1 ••
1 ••
••
20.00
1 +5 .00
n�
3
8/7/26
add work limit and fiber roll mainenance, add nourishment
MCB
2
7/20/26
shorten north wall end' for 10' clearance to property line
MCB
2
7/20/26
lower wall by 1 foot, add fiber roll; move bulkhead landward
MCB
1
5/15/26
added revised landing layout to plan view
MCB
NO.
DATE
REVISION
BY
SHEET TITLE
PROPOSED REGONSTRLI �TION OF
EXISTING STAIRS, BULKHEAD & LANDING
PROJECT NO.
SC-290
scAa AS SHOWN
DATE 2/11/26
PROJECT
BLUE ROCK ROAD REALTY TRUST
166 BLUE ROCK ROAD SOUTH YARMOUTH, MA
DRAWN By
MCB
�E>x�' DO°
DRAWING NO,
FEDELE.DWG I
DOWN CAPE ENGINEERING
939 MAIN STREET
YARMOUTHPORT, MA 02675
(508) 362--4541
SHOREFRONT CONSULTING
290 CENTER STREET
DENNIS PORT, MA. 02639
(508) 280-8046
WWW.SHOREFRONTCONSULTING.COM
_'�
! OF 1 SHEETS