Loading...
HomeMy WebLinkAbout792-792-18458 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:8/18/2026 Concrete Supplier: PLACEMENT INFORMATION Date Cast: 8/4/2026 Time Cast: 8:15 AM Date Received: 8/5/2026 Placement Location:PROCESS BUILDING NW AND SW FOOTINGS EAST COLUMNS Placement Method:PUMP Cylinders Made By:Caleb Drinan Material Type:Concrete Cylinders Placement Vol. (yd ):25 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures: TEST RESULTS Slump (in) (C-143):7 1/2 Air Content (%) (C-231):4.5 Air Temp (°F):71 Conc. Temp (°F) (C-1064):80 Load Number:1 Mixer Num.:74 Ticket Num.:53181 Cubic Yards:8.5 Design (psi):4500 Batch 7:24 AM Arrive 8:00 AM Depart 8:15 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-184A N 28.95 6.03 28.56 8/11/2026 Lab Unbonded 7 3 127.34 4460 792-184B N 28.90 6 28.23 8/18/2026 Lab Unbonded 14 5 151.7 5370 792-184C 28.95 9/1/2026 Lab 28 792-184D 29.10 9/1/2026 Lab 28 792-184E 29.00 HOLD Lab 3 2 Remarks:Kaylie O'Sullivan Reviewed By