HomeMy WebLinkAboutCCOR 08-26-2026 792-194Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:8/26/2026 Client:Wright-Pierce Client Rep:Rayssa FonteWeather:Clear 65 - 80°F S.W.COLE Rep:Riley Nordahl General Contractor:CDM Smith Time Onsite:05:25 - 09:40 Placement Type: Footing  Wall  Slab  OtherPlacement Location:SBR Short wall on gallery slab 1 Concrete Placement Observations Observed Comments Required mix used Yes 4500 psi, 1-1/2" aggregate, Sika Control 75 Concrete properly conveyed to all areas of placement Yes A Pump truck was used to convey the concrete Internal vibration / consolidation of concrete Yes A handheld vibrator was used for the consolidation of concrete Even layering around openings and embedments Yes Concrete was evenly layered and vibrated around openings and embedments Post placement observations (finishing, curing, etc.)Yes Concrete was manually finished with a trowel Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-194  *Refer to associated concrete test report Notes: As requested by Wright Pierce, S.W.COLE rep. Riley Nordahl was onsite to perform concrete field-testing services associated with the referenced concrete placement. S.W.COLE Engineering Construction Services Technician Riley Nordahl arrived onsite at approximately 5:25 AM. Upon arrival, the S.W.COLE rep. met with Rayssa Fonte of CDM Smith, who provided an overview of the planned work activities for the day. Concrete was supplied by Cape Cod Ready Mix and consisted of 1-1/2-inch, 4,500 psi concrete with Sika Control 75 as an additive. Approximately 10 cubic yards of concrete were placed during the observation period. Concrete samples for field-testing and fabrication of compressive strength specimens were obtained from Load 1 of the placement. Field-testing services were performed in general accordance with applicable ASTM test procedures. Concrete test specimens were fabricated from the sampled concrete for subsequent laboratory compressive strength testing at one 7-day interval, one 14-day interval, and two 28-day intervals. One additional specimen was retained as a hold sample. Field Test Results – Load 1 Slump: 8.0 inches Air Content: 4.0% Concrete Temperature: 78°F Based on the field-testing performed on the sampled concrete, the measured slump, air content, and temperature values were observed to be within the project-specified acceptance Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com ranges at the time of testing. Test results and observations were verbally reported to Rayssa Fonte of CDM Smith while onsite. Upon completion of the requested services, the S.W.COLE rep. departed the site at approximately 9:40 AM Attachments: 1 Photos Reviewed by:8/27/2026 Kaylie O'SuivKaylie O'Sullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com