Loading...
HomeMy WebLinkAboutSPR 8/25/26 Applicaiton SITE PLAN REVIEW FORMAL August 25,2026 TO: ASSESSOR(w/o plans) ENGINEERING DEPT CONSERVATION FIRE DEPT PLANNING DEPT(3) WATER DEPT Planning Design Review(All comm.south of Rt.6) Town Clerk's Office(2) Econ.Development w/o plans-for posting. HEALTH DEPT BUILDING DEPT FROM: Building Department SUBJECT:SITE PLAN REVIEW AGENDA TIME: 1:30 p.m. MEETING LOCATION:Town of Yarmouth—Room A NAME OF PROJECT: Town of Yarmouth ADDRESS:606 Forest Road MAP/LOT:986 Parcel 597 Chair: Mark Grylls f,.� _•r y4.1 `' t 4 4�,N OF 'Y A ..e U iR } iR . ,/77--- ,. OFFICE 'FM: COMMISSIONER :: . / 146 Roue. „ South Yarmouth, MA 02664 4 O8 -2 . ext . 1 I Fax 0 398 1, 0 -' . ; 1:9Yz,.: „-* 1.3 i ICA 'I. \ ATTAC1UCSE 4 ,t fy -�. 4 C M NI)�RpQRASt0SI �� PLAN REVIEW r }a t e: .a„ f 1 Review Date Iinie Propert‘ Address 606 Forest Road �- Assessors' Ma 86 597 Parcel(s ) Zoning District(s): B`3 Flood Zone ' N/A Business Name: Town of Yarmouth Applicant's Name: Weston & Sampson Owner or Corp. Name (if different): __ �. Applicant's Address: 1146 MA-28, South Yarmouth, MA 02664 Applicant's Phone No.: (508) 398-2231 Engineer/Surve or's Names : Heston & Sampson Y ( ) Description of Proposed Project (attach additions pages if necessary): SEE ATTACHED PROJECT DESCRIPTION What is the square footage of land disturbance? 11 ,310 List of all Hazardous Materials and Quantities (attach if necessary): 6,000 Gallon Gasoline & 4,000 Galion Diesel Is the Proposed Construction Within 100 Feet of a Wetland? Yes No X List and Attach Copies of Prior Board of Appeals Petitions. This information can be obtained fro m m the Board of Appeals Office. 4-----7)Si nature ot'A Applicant_ 2;(5:,,:itt.,L,L7:1,4:,,,,,,t,I �1/4,42L.,1,(1,,g pP date ...-. C .. ..�. ..... R c• . 6 :'4 Weston ramp soh August 12, 2026 55 Walkers Brook Drive,Suite 100,Reading,MA 01867 Tel:978.532.1900 Yarmouth Building Department 1146 Yarmouth Town Hall South Yarmouth, MA 02664 Re: Yarmouth DPW: New Fuel System Application for Site Plan Approval Dear Members of the Yarmouth Site Plan Review Committee: Weston&Sampson,on behalf of the Town of Yarmouth's Department of Public Works(the"Applicant"), is pleased to present this application for Site Plan Approval for work proposed at the Town of Yarmouth Disposal Area property at 606 Forest Road. The project consists of replacing the existing underground fuel system with a new aboveground fuel storage and dispensing system. We have attached the following materials in support of this application: • One (1) copy of the Application for Site Plan Approval • Eight (8) copies of the full-size(30" x 42") drawings • Electronic copy of the filing package (emailed to rinkley@yarmouth.ma.us) The existing underground storage tanks (one 6,000-gallon diesel and one 6,000-gallon gasoline) and associated dispensers, fuel management equipment, piping, and electrical systems have reached the end of their useful life. They will be removed and replaced with a new double-walled 10,000-gallon split UL 2085 Fireguard aboveground storage tank containing a 6,000-gallon gasoline compartment and a 4,000-gallon diesel compartment, together with new fuel dispensers and a modern fuel management system. The Town operates two fuel islands—one at 606 Forest Road and one at the DPW facility on Buck Island Road. While the Forest Road island is offline for construction, the Buck Island Road facility will continue to serve as the primary fueling location for Town vehicles and equipment. No temporary fueling facilities are proposed. The work is confined to the existing developed portion of the site. Existing access drives, vehicle circulation patterns, parking areas, and overall site operations will remain substantially unchanged. The limit of work is approximately 14,000 square feet. No net increase in impervious area will occur; therefore, peak runoff rates will remain consistent between pre-development and post-development conditions. Product piping will be Schedule 40 carbon steel, epoxy-coated, with victaulic compression fittings. The system incorporates the following spill-prevention and safety features:a continuous electronic leak monitoring system that notifies the owner when a leak is detected;overfill prevention valves and high-level alarms that trigger at 90 percent capacity; submersible pumps with in-line leak detection that shut off upon detection of a leak; a fill port housed in a 10-gallon remote fill box to contain minor spills; dispenser hoses equipped with shear valves; expansion relief valves; check valves to prevent accidental siphoning; and a fuel management system that restricts access to authorized personnel. In coordination with the Yarmouth Fire Department, it was determined that automatic fire suppression is not required for this outdoor municipal fleet fueling installation. Under 527 CMR 1.00 Chapter 42 and NFPA 30A, outdoor dispensing from an aboveground tank not exceeding 6,000 gallons is permitted at government facilities for fleet fueling when certain conditions are met. For a split tank,the 6,000-gallon limit is applied to each individual compartment. The proposed tank has a 6,000-gallon gasoline compartment and a 4,000-gallon diesel compartment; therefore each compartment is at or below the threshold and automatic fire suppression is not required. westonandsampson.com Offices in:MA,CT,NH,VT,NY,PA,MD,NC,SC&FL Page 2 Site work will consist of removal of the existing underground system,installation of the new aboveground tank and dispensing equipment, relocation of the existing gas line around the proposed fuel island, replacement of disturbed pavement,and restoration of affected areas.Existing utility services will be modified only as needed to support the new equipment. Because there is no net increase in impervious area and the limit of work is approximately 14,000 square feet,the project will not significantly alter existing drainage patterns and will disturb well under one acre of land.Temporary erosion and sediment controls will be installed during construction,and hoods will be added to existing catch basins to improve total suspended solids and hydrocarbon removal.In accordance with Section 2.02(1)of the Town of Yarmouth Stormwater Management Regulations,the project does not trigger a Stormwater Management Permit. The project does not modify the existing parking layout or circulation patterns and therefore maintains compliance with the design criteria of Section 301.4. Following this Site Plan Review application,the Town will also pursue a Special Permit from the Zoning Board of Appeals pursuant to§202.5 and§406 of the Zoning Bylaw(Municipal Use within the Aquifer Protection Overlay District) and registration and license from the Board of Health under the Handling and Storage of Toxic or Hazardous Materials regulation. The proposed work has been designed to satisfy the intent of the Site Plan Review objectives in Section 103.3.1 of the Zoning Bylaw. It replaces existing municipal fueling infrastructure,maintains the current function of the facility,and does not expand the site's use or operational intensity. Site Plan Review Objective Project Response §703.3.1(1)—Traffic The project replaces existing fueling infrastructure within the existing Town facility. Circulation and Access Existing access drives,vehicle circulation patterns,and site operations will remain substantially unchanged.No increase in traffic generation is anticipated. §103.3.1(2)—Parking Existing parking and vehicle storage areas will remain unchanged. No parking Areas spaces are being added or removed. §103.3.1(3)—Emergency Existing Fire Department access to the fueling area will be maintained. Access §103.3.1(4)—Utilities and Existing utility services will be modified only as necessary to support the new fuel Public Services system.The existing gas line will be relocated around the proposed fuel island. The project replaces existing fuel system infrastructure within a previously developed portion of the site.The limit of work is approximately 14,000 square feet with no net §103.3.1(5)—Drainage increase in impervious area;therefore peak runoff rates will remain consistent with and Environmental existing conditions.Total disturbance is well under one acre.Hoods will be added to Protection existing catch basins to improve TSS removal and aid in capturing floating hydrocarbons.The system includes a UL 2085 Fireguard double-wall aboveground storage tank and the spill-prevention and leak-detection features described above. The project replaces existing municipal fueling infrastructure at an active Town §103.3.1(6)—Compatibility facility.No changes to site use,hours of operation,parking supply,building area,or with Existing Use the overall function of the property are proposed. The project will replace existing underground storage tanks with aboveground storage tanks and associated equipment.While the aboveground tanks will be more §103.3.1(7)—Visual visible than the current underground system,the work is located within the existing Character of the Site developed Town transfer station/DPW facility and is consistent with the industrial character of the site. The improvements will not substantially alter the overall appearance of the facility as viewed from adjacent properties or public ways. westonandsampson.com Weston Zv I Offices In'.MA,CT.NH,VT,NY,PA,MD,NC,5C&FL l:.% Page 3 Weston & Sampson submits this application for Site Plan Review and looks forward to working with Town staff throughout the review process. Please do not hesitate to contact us with any questions regarding the proposed improvements. Sincerely, WESTON & SAMPSON ENGINEERS, INC. Tyler Cofelice, P.E. Team Leader westonandsampson.com Offices in: MA, CT, NH, VT, NY, PA, MD. NC, SC&FL APPENDIX A: SITE PLAN REVIEW APPLICATION westonandsampson.com Weston 0 3 k Offices in:MA,CT,NH,VT,NY,PA,MD,NC,SC&FL